My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2010 REPAIR
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
S
>
SAN JOAQUIN
>
345
>
2300 - Underground Storage Tank Program
>
PR0231867
>
COMPLIANCE INFO_2010 REPAIR
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/7/2023 4:17:01 PM
Creation date
11/6/2018 12:09:04 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2010 REPAIR
RECORD_ID
PR0231867
PE
2361
FACILITY_ID
FA0003959
FACILITY_NAME
AT&T CALIFORNIA - UE042
STREET_NUMBER
345
Direction
N
STREET_NAME
SAN JOAQUIN
STREET_TYPE
ST
City
STOCKTON
Zip
95202
CURRENT_STATUS
01
SITE_LOCATION
345 N SAN JOAQUIN ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
KBlackwell
Supplemental fields
FilePath
\MIGRATIONS\S\SAN JOAQUIN\345\PR0231867\REPAIR PLAN 2010.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
245
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> San.Joaquin County <br /> ago' ��4`Q=" Environmental Health DeparEment 7Dam°em WHS <br /> `. 600 East Main Street <br /> { Stockton, California 95202-3029 Boar comtnr TOM <br /> Robert limon•REM <br /> •: :• Jeff Can mco,RENS.M <br /> 71Y FtEr tS <br /> 6W Website:www.sj jgovorg/ehd <br /> a 9,2010 Phone: (209)468-3420 <br /> Fax: (209)464-0138 <br /> ` Chris Brown <br /> Stantec Architecture Inc. MAR 15 2M <br /> f 1137 N.McDowell Blvd. 9=36am CSB <br /> L Petaluma,CA 94954 <br /> Re: Pacific Bell Telephone Co.,dba AT&T California SR0058480 <br /> 345 N.San Joaquin St., Stockton,CA <br /> L The San Joaquin County Environmental Health Department(EHD)has completed the review of <br /> the application for a permit to the following work on the underground storage tank(UST)system <br /> at the above noted address: <br /> - Replace the underground primary fuel supply piping by pulling a new Western <br /> Fbergtass Co-Flex flexible double wall pipe through the existing secondary piping, <br /> which will then serve as a rockguard chase pipe. <br /> - Replace the secondary test boots on the ventfreturn piping,with contingency to replace <br /> the primary and secondary ventlreturn piping with FRP primary and secondary piping i# <br /> secondary containment retest fails. <br /> - Test new piping in accordance to applicable regulations and specifications <br /> - Collect one soil sample every 20 lineal feet of the fuel and vent piping using a hand <br /> auger. The samples will be collected within two feet of the piping at a depth of one to <br /> two feet below the base of the piping. Samples w9l be submitted to McCampbell <br /> Analytical, Inc_,within 24 hours for diesel,BTEX,and oxygenate analyses. <br /> - Triple-rinse and decontaminate the removed piping by inert gas such as nitrogen. <br /> - Rinsate will be hauled by Evergreen Oil, Inc.to be disposed at EcokW Control <br /> Industries. <br /> ! - Removed piping will be hauled by Ecology Control Industries to be disposed at Ecology <br /> W,,. Control Industries_ <br /> Perform secondary containment test after installatlon, and 6 months after installation. <br /> The permit has been approved with the following conditions: <br /> 1. Contact the local Fire department and the San Joaquin Valley Air Polution Control <br /> District for any applicable permits and requirements. <br /> 2_ Any changes in information and scope of work must be submitted to EHD for approval <br /> prior to commencing work. All new addenda supersede the previous ones. <br /> i,.. <br /> 3. Contact Jeff Wong at(209)468-0335 to arrange the following inspection appointments <br /> (a 48-hour notice is required for mon appointments). Please be aware that <br /> L inspections for emergency work must be scheduled within five days of permit approval. <br /> L <br /> 4 <br /> L <br />
The URL can be used to link to this page
Your browser does not support the video tag.