Laserfiche WebLink
L <br /> L AT&T,345 N.San Joaquin St,Stockton,CA(SR0058480) <br /> a. Primary piping soap test:One dour pneumatic pressure test at 110%of operating <br /> pressure,or 40 psi,whichever is greater. <br /> b. Secondary piping soap Hest:One hoar pressure test per mane€acturees guidelines. If <br /> there are no manufachnWs guidelines,test shall be perforned using an applicable <br /> method specified in an industry code or engineering standard. <br /> c. 24-hour hydrostatic test(or equivalent)on piping sump. <br /> d. Secondary containment besting on the new fuel pipe run after installation,and six <br /> months after installation. <br /> �- e. Submit updated Form 8 to EHD within 30 days of piping replacement <br /> L EHD inspector must be present to witness removal of piping,decontamination of <br /> Lremoved piping,management of the rkrsate,and any soft sample collection. <br /> Please be aware that the facility cannot operate the UST system prior to the EHD <br /> inspection and approval. <br /> `' 4_ Since concrete will be broken near the UST and piping,a secondary containment test <br /> must be performed on the UST and piping once concrete is poured in accordance with <br /> the manufacturers guidelines. <br /> 5. Quakfied service technicians must possess or work under the direct and personal <br /> supervision of an individual physcany present at the work site who possesses all of the <br /> following: <br /> a. One of several permissible valid,current contractors licenses issued by the <br /> Contractors State License Board(may be issued to the installation company),or a <br /> i Tank Tester's license issued to the individual by the State Water Board,and <br /> b. A valid,current Califomla UST Service Technician certificate issued by the <br /> International Code Cowl(ICC),and <br /> a A valid,current certificate of training from the manufacturer(s)of the component(s) <br /> being tested,repaired,or serviced. <br /> 6. Qualified installers must possess or work under the direct and personal supervision of an <br /> individual physically present at the work site who possesses all of the following: <br /> �.. a. A valid,current contractor's license issued by the Contractors State License Board, <br /> and <br /> b. A valid,current certificate of.training from the manufacturer(s)of the component(s) <br /> being installed,and <br /> Q A valid.current UST Instakation/Retrofrtting certificate issued by the International <br /> Code Council(ICC). <br /> 7. Update and submit a copy of the"UST Monitoring Plan"for EHD approval. An approved <br /> copy will be returned for on site records. <br /> 8. A`UST Certification of InstaliationlModificalion'form shall be submitted by the owner or <br /> the owner's agent(CCR Section 2635(d))before this upgrade is considered complete by <br /> - EHD. <br /> 9. All components must be oertified by an independent testing organization and labeled as <br /> raged by the organization(UL,ULC,ANSI,API,ASTM, etc.). See California Code of <br /> L Regulations(CCR)Title 23, Chapter 16.Table 8 for a complete W. <br /> .� 2 <br /> s <br />