My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2010 REPAIR
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
S
>
SAN JOAQUIN
>
345
>
2300 - Underground Storage Tank Program
>
PR0231867
>
COMPLIANCE INFO_2010 REPAIR
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/7/2023 4:17:01 PM
Creation date
11/6/2018 12:09:04 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2010 REPAIR
RECORD_ID
PR0231867
PE
2361
FACILITY_ID
FA0003959
FACILITY_NAME
AT&T CALIFORNIA - UE042
STREET_NUMBER
345
Direction
N
STREET_NAME
SAN JOAQUIN
STREET_TYPE
ST
City
STOCKTON
Zip
95202
CURRENT_STATUS
01
SITE_LOCATION
345 N SAN JOAQUIN ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
KBlackwell
Supplemental fields
FilePath
\MIGRATIONS\S\SAN JOAQUIN\345\PR0231867\REPAIR PLAN 2010.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
245
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
L <br /> L AT&T,345 N.San Joaquin St,Stockton,CA(SR0058480) <br /> a. Primary piping soap test:One dour pneumatic pressure test at 110%of operating <br /> pressure,or 40 psi,whichever is greater. <br /> b. Secondary piping soap Hest:One hoar pressure test per mane€acturees guidelines. If <br /> there are no manufachnWs guidelines,test shall be perforned using an applicable <br /> method specified in an industry code or engineering standard. <br /> c. 24-hour hydrostatic test(or equivalent)on piping sump. <br /> d. Secondary containment besting on the new fuel pipe run after installation,and six <br /> months after installation. <br /> �- e. Submit updated Form 8 to EHD within 30 days of piping replacement <br /> L EHD inspector must be present to witness removal of piping,decontamination of <br /> Lremoved piping,management of the rkrsate,and any soft sample collection. <br /> Please be aware that the facility cannot operate the UST system prior to the EHD <br /> inspection and approval. <br /> `' 4_ Since concrete will be broken near the UST and piping,a secondary containment test <br /> must be performed on the UST and piping once concrete is poured in accordance with <br /> the manufacturers guidelines. <br /> 5. Quakfied service technicians must possess or work under the direct and personal <br /> supervision of an individual physcany present at the work site who possesses all of the <br /> following: <br /> a. One of several permissible valid,current contractors licenses issued by the <br /> Contractors State License Board(may be issued to the installation company),or a <br /> i Tank Tester's license issued to the individual by the State Water Board,and <br /> b. A valid,current Califomla UST Service Technician certificate issued by the <br /> International Code Cowl(ICC),and <br /> a A valid,current certificate of training from the manufacturer(s)of the component(s) <br /> being tested,repaired,or serviced. <br /> 6. Qualified installers must possess or work under the direct and personal supervision of an <br /> individual physically present at the work site who possesses all of the following: <br /> �.. a. A valid,current contractor's license issued by the Contractors State License Board, <br /> and <br /> b. A valid,current certificate of.training from the manufacturer(s)of the component(s) <br /> being installed,and <br /> Q A valid.current UST Instakation/Retrofrtting certificate issued by the International <br /> Code Council(ICC). <br /> 7. Update and submit a copy of the"UST Monitoring Plan"for EHD approval. An approved <br /> copy will be returned for on site records. <br /> 8. A`UST Certification of InstaliationlModificalion'form shall be submitted by the owner or <br /> the owner's agent(CCR Section 2635(d))before this upgrade is considered complete by <br /> - EHD. <br /> 9. All components must be oertified by an independent testing organization and labeled as <br /> raged by the organization(UL,ULC,ANSI,API,ASTM, etc.). See California Code of <br /> L Regulations(CCR)Title 23, Chapter 16.Table 8 for a complete W. <br /> .� 2 <br /> s <br />
The URL can be used to link to this page
Your browser does not support the video tag.