My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2010 REPAIR
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
S
>
SAN JOAQUIN
>
345
>
2300 - Underground Storage Tank Program
>
PR0231867
>
COMPLIANCE INFO_2010 REPAIR
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/7/2023 4:17:01 PM
Creation date
11/6/2018 12:09:04 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2010 REPAIR
RECORD_ID
PR0231867
PE
2361
FACILITY_ID
FA0003959
FACILITY_NAME
AT&T CALIFORNIA - UE042
STREET_NUMBER
345
Direction
N
STREET_NAME
SAN JOAQUIN
STREET_TYPE
ST
City
STOCKTON
Zip
95202
CURRENT_STATUS
01
SITE_LOCATION
345 N SAN JOAQUIN ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
KBlackwell
Supplemental fields
FilePath
\MIGRATIONS\S\SAN JOAQUIN\345\PR0231867\REPAIR PLAN 2010.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
245
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
----------- <br /> INSTALLATION PLAN SCALE: 1/4'=I'-0" <br /> (E) UNDERGROUND -TELEPHONE Ll IN lj �) Ay S T R <br /> CABLES PROTECT AS <br /> REQUIRED BY PACIFIC BELL ................... .... ............... ........ (E) PARKING METER (TYP.) ---.. <br /> CABLE MAINTENANCE X <br /> .... ..................... <br /> C) <br /> T <br /> CD ------ <br /> (E) SIGN AREA OF WORK <br /> ..................... .............. ------- .................. .......... <br /> F /3 <br /> ............................ ....................................... <br /> ........... <br /> -------------- <br /> (E) S U P P LY <br /> PIPING SUMP <br /> 70 ................ .......................... ...... ...... ................................... ........... L............ ........ -—------------------------------------------------------- <br /> X <br /> (E) DRAIN INLET-- <br /> rf 0 <br /> —(E) 3' 0 F.G. F.O.V. LINE <br /> FILI.------M� -1 8 F� <br /> ENT 1 Q <br /> L L 7 <br /> (R <br /> --------------------------------------_- ------ ---------------------------------------------------- <br /> (E) FILL/VENT/RETURN/TL M SUMP <br /> —Z <br /> II <br /> (E) BACKFILL PORT A <br /> F <br /> @ <br /> (E) 3" STEEL PRIMARY INSIDE <br /> 4" STEEL SECONDARY <br /> VE AT N E F P E <br /> 4 <br /> (E) CABLE VAULT (BASEMENT) 5 12 8 (REPLACE W/ 6 PIPE CHASE <br /> (ALL WORK INSIDE OF VAULT SHALL IF NEEDED) <br /> REQUIRE PROTECTION OF (E) TELEPHONE <br /> CABLES AND CONDUITS, CABLES SHALL BE <br /> LLJ COVERED WITH 3/4" PLYWOOD EXTENDING <br /> AT LEAST FIVE FEET BEYOND THE AREA OF WORK) 16 <br /> 2 4 <br /> 0- (E) SECONDARY— <br /> (E) 1 -1/4" 0 F.O.D. <br /> PIPING <br /> TERMINATION <br /> -FUEL OIL T S B 0 <br /> 0 3 STRAINERS (E) 1 -1/4" 0 F.O.D. LINE ABANDONED REPLACE AND <br /> I N P LACE RETEST VENT <br /> E) SUMP PUMP-- (E) PUMP ROOM -�SEC.ONDARY) . ..................... <br /> 4 <br /> T1 <br /> T <br /> (BASEMENT) <br /> (E) FIRE HYDRANT ( ) PANEL MPBA \— (E) DAY TANK CONTROL PANEL <br /> 2-- <br /> 6 13 15 <br /> T <br /> 0 <br /> (E) TLS-350 TANK MONITOR LINE(E) 3(TO BE F.0.V. CONSULTANT STAMP <br /> REPLACED) <br /> BUILDING WALL <br /> " T1 BUILD INU <br /> E I <br /> -015 <br /> (BASEMENT) <br /> (E) F.O.D. 'TO ROOF <br /> CONSULTANT STAMP <br /> IEN <br /> LAS <br /> ENGINEERS, INC <br /> 305 South 11th Street <br /> San Jose, CA 95112 2218 <br /> 436 14th Street, Suite 200 <br /> (E) 3" 0 F.O.V. PIPING <br /> PARTIAL SITE P LAN Oakland, CA 94612-2725 <br /> TO ROOF (TO REMAIN). 498 Foarn Street <br /> SCALE: 1/4Monterey, CA 93940-1410 <br /> =V-0" <br /> " <br /> (408) 282)—1500 <br /> FAX: (408297-2995 <br /> www.salasobi-icn.com <br /> E <br /> REVISIONS / AUTHORIZATIONS <br /> NQ TE: <br /> NO. DAVE BY <br /> EXISTING UNDERGROUND TELEPHONE CABLE OR CONDUIT: RMS&S / AUTHORIZATXM --- <br /> Ci <br /> USE EXTREME CAUTION WHEN EXCAVATING IN ANY SUCH 80% ISSUED FOR CLIENT REVIEW 9/28/09 CSB <br /> 0 AREA. HAND DIGGING WILL THE TELEPHONE BE REQUIRED. RESPONSE TO CLIENT COMMENI-S 10/6/09 CSB <br /> 0 <br /> E COORDINATOR MUST BE NOTIFIED 72 HOURS PRIOR "TO TRANSITION BOX ADDITION 10113109 CSB <br /> START OF ANY EXCAVATING. <br /> 0 RESPONSE TO CLIENT COMMENTS/ADD VENT LINE SCOPE 11/02/09 CS13 <br /> A-I <br /> RESPONSE "TO COMMENTS (95%) 11/16/09 CSB <br /> CUPA RESUBMITTAL 11/23/09 CSB <br /> PIPING LNSTAI-1ATION NOTES plIpT) F Ll WING UIREMENTS <br /> �G DEMOLHION NOTES THE '0 jO Uj PIPING INSTALLATION NOTES IMPORTANT NOTICE <br /> Section 4216 / 4217 of the PROPRIETARY AT&T INFORMATION <br /> OT FOR GENERAL USE OR DISCLOSURE OUTSIDE OF AT&T <br /> AR.-Ir TO BE MEI : <br /> —-------- Government Code requires a Dig Alert N <br /> t-i'UEL, SUPPLY PIPING REPAIRS VENT LIN.Ed` REPAIR REPLACEMENT FUEL SUPPLY PIPING REPAIRS Identification Number be issued before THIS INFORMATION MAY ONLY BE USED BY AUTHORIZED <br /> E <br /> a. 72 HOUR N011FICAT10N PRIOR TO TANK INSTALLATION, INSTALL ALL PIPING PER MANUFACTURER'S MINIMUM BEND RADIUS AND ALL a Permit to Excavate will be valid For PERSONNEL OF THE LOCAL GOVERNMENT AGENCY IN CONNECTION <br /> EXIS)M EMAIN. Old REPLACE VENT LINE SECONDARY CONTAINMENT TEST BOOT AND RE-TEST THE --;O�N�TALL TEMPORARY BARRIERS (CALTRANS TYPE K) AND 6' HIGH PORTABLE OTHER MANUFACTURER'S INSTALLA11ON SPECIFICATIONS. TAIT ENVIRONMENTAL <br /> "' I INS LE b. TAN K SYSTEMS TO BE INSPECTED BY CUPA your Dig Alert ID Number Call WITH APPLICATION THE <br /> PERMIT'S AND AUTHORIZATIONS FOR <br /> 01 VENT SECONDARY CONTAINMENT PIPING. IF THE SECONDARY PIPING STILL FAILS THE CHAIN LINK FENCE AROUND WORK AREk BUILDINGS, CONSTRUCTION, AND/ OR ZONING CHANGES, <br /> 3SHAII AIR PRESSURE TEST ALL PRIMARY & SECONDARY PIPING PBIQE-JQ <br /> ENSURE TANK IS 90% FULL OF PRODUCT PRIOR TO WORK. TEST, PROCEED WITH REPLACEMENT OF U.G. VENT PRIMARY AND SECONDARY PIPING. <br /> AT (3) THREE SEPARATE CONSTRUC11ON PHASES: Underground <br /> DKEDILM. OR CONNECTING TO TANKS AND GENERATORS. ISOLATE AND CAP DRAWINGS PREPARED FOR <br /> DISABLE ONE OF THE EXISTING FUEL PUMPS. ONE PUMP AND FUEL 1. PRIMARY PIPING HYDROSTATICALLY OR <br /> co E (3) INSTALL (2) (N) 1-1/2" 0 SUPPLY WESTERN FIBERGLASS COAXIAL FLEX PIPING (B) INSTALL (N) 4" OVER 3" FRP UNDERGROUND VENT/DAY TANK OVERFLOW PIPING FROM <�> ALL PEN&Y PIPING RUNS & PRESSURIZE TO 75 P.S.I. (MIN.) FOR 30 Service Alert <br /> SUPPLY LINE SHALL REMAIN IN SERVICE AT ALL TIMES WHILE PIPING IS PNEUMATICALLY TESTED FOR 30 MINUTES. <br /> IN' <br /> PIPING <br /> SECON <br /> STILL <br /> DA <br /> FAILS AILS <br /> P P U.G.-T <br /> INH <br /> G <br /> E <br /> 0 LO <br /> ERF PIPING FROM <br /> V W Mj <br /> Y MINUTES (MIN.), OR LONGER AS REQUIRED BY LOCAL AGENCY. SOAP TEST <br /> 0 FUEL LINES IN (E) CHASE PIPES FROM (E) TANK SUMP TO (E) PUMP ROOM. TANK SUMP TO (N) FIREBOX INSIDE BUILDING BASEMENT LOBBY. BEING REPLACED. <br /> at&t <br /> 2. INSPECTION OF ALL SECONDARY CONTAINMENT, ALL JOINTS AND INSPECT FOR LEAKS. REPAIR ANY LEAKS DISCOVERED AS CALL- TOLL MEE CAL: TOLL MEE CORPORATE <br /> ONE SUPPLY LINE AND (1) FUEL PUMP SHALL REMAIN OPERATIONAL AT ALL <br /> INCLUDING TESTING, IN ACCORDANCE Wn REQUIRED. HQQhM PIPING TO BE AIR TESTED AFTER CONNECTION IN 1-800-422--4133 1-800-642-2444 <br /> co TIMES DURING THE INSTALLATION. SLOPE 1/4- PER FOOT DOWN TO TANK. @ INSTALL (N) 4* OVER 3" FRIP VENT/DAY TANK OVERFLOW PIPING INSIDE OF (N) 6'0 DIA. <,3> REMOVE (2) EXISTING 1-1/2" 0 ENVIROFLEX F.O.S. LINES FROM (E) IN SOUTHERN CALIFORNIA IN NORTHERN CALIFORNIA <br /> MANUFACTURER'S GUIDELINES. CONTAINMENT SUMP AND IN BUILDING PIPE TRENCH AT 3 P.S.I. (MIN.) TO 5 REAL ESTATE <br /> 00 STEEL CHASE PIPE FROM U.G. TRANSITION OUTSIDE BUILDING THROUGH CABLE VAULT CHASE PIPES. REMOVE SUPPLY LINES E AT A TIME WHILE KEEPING THE <br /> 410 AND INTO BASEMENT LOBBY. TERMINATE SECONDARY PIPING IN BASEMENT LOBBY WITH 3. FINAL. INSPECIFION, INCLUDING ALL PORTIONS OF P.S.I. (MAX.) FOR 30 MINUTES IN. OR LONGER AS REQUIRED BY LOCAL <br /> n (D INSTALL WESTERN FIBERGLASS TEST FITTINGS AND LOCKABLE FULI. PORT BALL OTHER LINE OPERATIONAL- SEE THE EXISTING CHASE PIPE Two Working Days Before You Dig PROJECT 1TTLE: <br /> co <br /> P, NOTE <br /> AGENCY. SOAP TEST ALL CONNECTIONS AND JOINTS AND INSPECT' FOR <br /> 0 VALVES ON NEW CO-FLEX PIPING IN TANK SUMP. SECONDARY CONTAINMENT TEST BOOT INSIDE OF (N) FIREBOX. NEW PIPING SHALL BE UNDER THE SID IS TO REMAIN BE RE-USED TO PULL THE NEW THE LEAK DETECTION SYSTEM. <br /> 0 LEAKS. REPAIR ANY LEAKS DISCOVERED AS REQUIRED. MAINTAIN THE AIR <br /> IN INSTALLED IN SAME LOCATION AS PREVIOUS PIPING. PIPING. <br /> X c. T SYSTEM INTEGRffY TESTS FORWARDED & APPROVED TEST ON THE SECONDARY CONTAINMENT PIPING DURING THE BACKFILLING Engineers Note to Contractor STANDBY SYSTEM UPGRADES <br /> a @ CONTRACTOR TO APPLY "sEALTrrE* SEALANT TO ALL JOINTS IN WESTERN BY CUPA PRIOR TO T SYSTEM PROCESS AND VERIFY THAT NO PRESSURE DROP OCCURRED IN THE <br /> FIBERGLASS SECONDARY CONTAINMENT SYSTEM AND AT ENDS. @ INSTALL (N) 3" WELDED STEEL SCH 40 VENT/DAY TANK RETURN PIPING FROM ONCE THE FIRST SUPPLY LINE HAS BEE INSTALLED AND TESTED, AND IS BEING PLACED IN OPERATION. SECONDARY PIPING. INSPECT FOR LEAKS. REPAIR ANY LEAKS DISCOVERED. <br /> SECONDARY PIPING TERMINATION IN BASEMENT LOBBY TO PIPING CHASE TO BUILDING OPERATIONAL, REPEAT ITEMS��2 AND 3 FOR REPLACEMENT OF THE The existence and location of any underground utilities, pipes, 345 N. SAN JOAQUIN STREET <br /> 00 CONTRACTOR TO REPLACE ANY CONCRETE DAMAGED DURING TANK SYSTEM ROOF. SUPPORT PIPING FROM CEILING EVERY 10 FT MIN AND AT ALL CHANGES IN SECOND FUEL SUPPE®Y LINE &HEL569911M PIPING RUNS, BOTH PRIMARY AND SECONDARY PIPING and/or structures shown on these plans were obtained by a search <br /> 04 sp -- d. STATE WATER RESOURCES FORMS (FORMALLY A, B, AND SYSTEMS TO BE RETESTED PER AFOREMENT10NED PROCEDURES. THE TESTING <br /> a ' TO MATCH EXISTING IN SECTION® SLOPE, DIRECTION. of available records. The contractor shall ascertain the true vertical <br /> 0 C MODIFICATION WITH NEW CONCRETE STOCKTON <br /> CR C) MUST BE COMPLETED & SUBMITTED PRIOR TO TANK OF THE PRIMARY AND SECONDARY PIPING MUST BE WITNESSED BY <br /> 9� COLOR & KIND. <br /> CO <br /> r�- a. VENT LINE REPAIRS OPERATION. ENVIRONMENTAL MANAGEMENT AND LOCAL REGULATORY AGENCIES. AFTER and horizontal location and size of those underground utilities to <br /> 8Z 104 PERFORM PRESSURE TESTS ON ALL NEW PIPING. be used and shall be responsible for any damage to any public or CA us <br /> I (DRE-LABEL PIPING IN SUPPLY PIPING SUMP. BOTH SHOULD BE LABELED SUCCESSFUL COP ON OF PIPING TEST, CONTRACTOR TO PULL BACK private utilities® shown or not shown hereon. <br /> >R "SUPPLY". ONE IS CURRENTLY LABELED INCORRECTLY AS "RETURNO. <�> ISOLATE RETURN (DAY TANK OVERFLOW) LINE BY DISCONNECTING AND e. AN UNAUTHORIZED RELEASE RESPONSE PLAN MUST BE REDUCING BOOT FROM SECONDARY PIPING INTANK SUMP TO ALLOW <br /> is a @ LABEL ALL ABOVEGROUND PIPING RELATED TO FUEL SYSTEM WITH CONTENTS AND CAPPING RETURN PIPING AT DAY TANKS ON ROOF. SUBMITTED & APPROVED BY CUPA UNRESTRICTED DRAINAGE FROM SECONDARY PIPING SYSTEM INTO THE SKTNCA01 UE-042 <br /> • <br /> DIRECTIONAL ARROWS EVERY 10 FT IN, PRIOR TO TANK OPERATIONS. CONSTANTLY MONrTORED TANK SUMP. SHEIET TITLE- UNDERGROUND FUEL TANK <br /> 8 08 'TAIT ENVIRONMENTAL SERVICES (TES) TO COMPLETE ALL EQUIPMENT TESTS —N1111 4 <br /> K REQUIRED BY GOVERNMENTAL AGENCIES AS SPECIFIED IN GENERAL INSTALLATION 16 INSTALL (N) FIREBOX WHERE PIPING ENTERS BASEMENT LOBBY FOR TRANSITION FRO <�> REMOVE (E) 3- STEEL PRIMARY VENT/DAY TANK OVERFLOW PIPING f. EVIDENCE OF FINANCIAL RESPONSIBILITY SUBMITTED TO SUCTION SYSTEM <br /> w d FROM SECONDARY PIPING TERMINATION LOCATION (IN BASEMENT CUPA. <br /> Z N NOTE 12; SHEET Fl. G.C. 'TO COMPLETE ALL OTHER TESTING. DOUBLE WALL FRIP PIPING TO SINGLE WALL STEEL PIPING. <br /> A ELEVATOR LOBBY) TO PIPE CHASE WHERE PIPE BEGINS VERTICAL RUN <br /> Z 3_\ NQF.--; LOCAL MODIFICATION NOTES <br /> @INSTALL FIREBOX WHERE PIPING ENTERS PUMP ROOM WALL FOR TRANSITION TOWARDS ROOF. IMPLEMENTING AGENCIES MAY HAVE ADDITIONAL ALL NEW SUMPS OR NEW HARDWARE THAT ENTERS OR EXITS A SUMP ARE AT&T PROJECT NUMBER: DATE: 9/21/09 SCALE: NOTED <br /> FROM CO-FLEX TO STEEL PIPING. REQUIREMENTS TO BE HYDROSTATICALLY TESTED WITH A HEAD OF WATER ONE FOOT ABOVE <br /> .2 <br /> 10- CLIF VENT LINE FAILS SECONDARY CONTAINMENT TEST, EXCAVATE AND 7510405 DRAWN BY: NDP CHECKED BY: CSB REMOVE (E) U.G. 3- F.G. F.O.V. LINE IN 4- F.G. CONTAINMENT. THE HIGHEST POINT OF PENETRATION OR JOINT. TER LY, SUMPS MAY AT&T AUTHOR17ATION: <br /> BE VACUUM TESTED PER MANUFACTURE'S INSTRUCTIONS. Stantec Architecture Inc. Tel. 707.765.1660 SHELT: OF: 4 SHEM SHEET NO. <br /> 2 <br /> �> <br /> 8 IF VENT LINE FAILS SECONDARY CONTAINMENT TEST, REMOVE (E) 4- AT&T DRAWING NO.: <br /> < 1137 N. McDowell Blvd. Fox.707.765.9908 AL JEFFERSON <br /> OVER 3' STEEL VENT/DAY TANK OVERFLOW PIPING FROM CABLE VAULT. Petaluma, CA U.S.A. 94954 www.stantec.com SKTNOl -01 - 1109 F2 <br /> Fi\Pr,)jr�ct\M-N-0-P\OFI-1\2007839028\D'Wl",S\3-Peiii�it\2007839028-F2d,,Yg 11/23/2009 10A8 AM Bm.wn, Chris <br /> ____n_____._.......____.._ <br /> ----------- ----------- ---------------------- ------ ----- ------- -—------ <br />
The URL can be used to link to this page
Your browser does not support the video tag.