Laserfiche WebLink
Monitoring System Certification <br /> Address: 345 N.SAN JOAQUIN STOCKTON 95202 Service Date: 05/13/2010 <br /> UST mon itoring Site Plan <br /> . . . . . 51L* VVA t A <br /> 14 <br /> IT s� $. <br /> r <br /> Date map was drawn.05/13/2010 <br /> Instructions <br /> If you already have a diagram that shows all required Information, you may Include it, rather than this page, <br /> with your Monitoring System Certification. On your site plan, show the general layout of tanks and piping. <br /> Clearly identify locations of the following equipment, if installed: monitoring system control panels; sensors <br /> monitoring tank annular spaces, sumps, dispenser pans, spill containers, or other secondary containment <br /> areas; mechanical or electronic line leak detectors; and in-tank liquid level probes (if used for leak detection). <br /> In the space provided, note the date this Site Plan was inspected. <br /> Monitoring System Certification Page 4 of 4 12107 <br />