Laserfiche WebLink
Monitoring System Certification <br /> Address: 345 N. SAN JOAQUIN STOCKTON 95202 Service Date:05113/2010 <br /> F. In-Tank Gauging/SIR Equipment ®Check this box if tank gauging is used only for inventory control <br /> ❑Check this box if no tank gauging or SIR Equipment is installed <br /> This section must be completed if in-tank gauging equipment is used to perform leak detection monitoring <br /> Complete the fol owing checklist <br /> ❑Yes ❑No* Has all input wiring been inspected for proper entry and termination,including testing for ground <br /> faults? <br /> ❑Yes ❑No* Were all tank gauging probes visually inspected for damage and residue buildup? <br /> ❑Yes ❑No' Was accuracy of system product level readings tested? <br /> ❑Yes ❑No` Was accuracy of system water level readings tested? <br /> ❑Yes ❑No* Were all probes reinstalled properly? <br /> ❑Yes ❑No' Were all items on the equipment manufacturer's maintenance checklist completed? <br /> *In the Section H below,describe how and when these deficiencies were or will be corrected <br /> G. Line Leak Detectors (LLD): ®Check this box if LLDs are not installed <br /> Complete the fol owing checklist <br /> []Yes ❑No' For equipment start-up or annual equipment certification,was a leak simulated to verify LLD <br /> performance? <br /> ❑NIA Simulated Leak Rate(check all that apply) ❑ 3.0 g.p.h ❑0A g.p.h ❑0.2 g.p.h <br /> ❑Yes ❑No` Were all LLDs confinned operational and accurate within regulatory requirements? <br /> ❑Yes ❑No' Was the testing apparatus properly calibrated? <br /> ❑Yes ❑No* For mechanical LLDs,does the LLD restrict product flow if it detects a leak? <br /> ❑NIA <br /> ❑Yes ❑No" For electronic LLDs,does the turbine automatically shut off if the LLD detects a leak? <br /> ❑N/A <br /> ❑Yes ❑No* For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system is <br /> disabled or disconnected? <br /> ❑NIA <br /> I Yes ❑No' For electronic LLDs,does the turbine automatically shut off if any portion of the monitoring system <br /> malfunctions or fails a test? <br /> ❑NIA <br /> ❑Yes ❑No* For electronic LLDs, have all accessible wiring connections been visually inspected? <br /> ❑NIA <br /> ❑Yes ❑No* I Were all items on the equipment manufacturer's maintenance checklist completed? <br /> In the Section H below,describe how and when these deficiencies were or will be corrected <br /> H. Comments <br /> Suction system. <br /> I <br /> Monitoring System Certification Page 3 of 4 12107 <br />