Laserfiche WebLink
SAMPLE SITE PLAN SCALE: I"=3Q'-D" SAMPLE ENLARGED SITE PLAN SCALE: 1/8"=V—O" TANK INSTALLATION NOTES GENERAL ELECTRICAL NOTES <br /> (LOCAL ENGINEER TO PREPARE SITE SPECFIC PLAN) (D INSTALL XX,000 GALLON MODERN WELDING-ENVIRO 16 DOUBLE WALL STEEL TANK WITH VEEDER-ROOT TLS-350 ALARM SYSTEM, TANK INSULATED FLANGES & KIT OR SHORT SECTION OF PVC CONDUIT TO <br /> TO BE SET 48" MINIMUM BELOW FIN. GRD. CONTRACTOR TO FIELD DETERMINE EXACT BURY DEPTH. BACKFILL WITH CLEAN WASHED BE USED ON ALL UNDERGROUND PIPING & CONDUITS. AFTER BUILDING <br /> SAND. PENETRATION. <br /> ( INSTALL AN 8" REINFORCED CONCRETE TANK SLAB WITH #4 @ 12 BOTH WAYS. SET MANHOLE COVERS 3" ABOVE OUTER EDGE OF <br /> — _ _ _ SLAB. (SEE TANK SECTION) ALL CONDUITS TO HAVE SEAL-OFFS PER LATEST EDITION OF THE 3 R SPACE MONITOR. (MANHOLE COVER BE LOCKABLE & WATERTIGHT. SEE TANK SECTION) KILIARK #CRSS-2 OR CROUSE-HINDS GOA SERIES. <br /> 4 4" FILL RISER. (MANHOLE COVER TO BE WATERTIGHT, <br /> IGHT, SEE TANK SECTION). <br /> CONCRETE 4" FILLNATIONAL ELECTRIC CODE. ALL J-BOXES TO BE EXPLOSION PROOF, <br /> MECO. EQUIP. I BY OTHERS 5' S 4" VENT RISER. (MANHOLE COVER TO BE WATERTIGHT. SEE TANK SECTION) USE CABLE CONNECTOR FITTINGS (CROUSE-HINDS COB OR <br /> BY OTHERS SEE 6 4" ELECTRONIC TANK GAUGE PROBE RISER. (MANHOLE COVER TO BE LOCKABLE AND WATERTIGHT. SEE TANK SECTION) <br /> (TYP. EQUIVALENT) AT MONITOR & LEVEL GAUGE CABLE CONNECTIONS TO <br /> ENLARGED 0 VEEDER-ROOT #790091-001 OVERFILL ALARM & VEEDER-ROOT #790095-001 OVERFILL ALARM ACKNOWLEDGMENT SWITCH (MUST BE J-BOXES & PIPE FITTINGS IN SUMP BOXES. <br /> LAJ AREA PLACED IN VIEW OF FILL). EXACT LOCATION TO BE FIELD DETERMINED. ALARM SHALL ACTIVATE AT 907 TANK CAPACITY. PROVIDE <br /> PLAN / ` 3 4 B 1 2 5 CLASS 1 DIV. 2 ELECTRICAL FEED FROM 20 AMP BREAKER IN ELECTRICAL PANEL "LG" USING 3/4" CONDUIT. ALL UNDERGROUND CONDUITS AND CONDUITS INSTALLED OUTDOORS TO <br /> © INSTALL VEEDER-ROOT TLS-350 MONITORING PANEL, EXACT LOCATION TO BE FIELD DETERMINED. PROVIDE ELECTRICAL FEED FROM 20 BE PVC COATED RIGID. ALL CONDUITS INSTALLED INSIDE BUILDING MAY <br /> _ _ _ _ AMP BREAKER IN EXISTING ELECTRICAL PANEL "LB", BE EMT (COMPRESSION TYPE FITTINGS ONLY). <br /> w <br /> 1%S RTI i'-0" O9 INSTALL 3/4" SUPPLY AND 1" RETURN WESTERN FIBERGLASS FLEXIBLE FUEL LINES. SLOPE 1/4" PER FOOT DOWN TO TANK. RUN IN <br /> hm A/C BY OTHERS CLASS 1 DIVISION 2 0 SAME SECONDARY. CONTRACTOR TO PROVIDE & INSTALL PULL BOXES AS REQUIRED TO <br /> <� FACILITATE WIRE PULUNG. <br /> OS I HAZARDOUS AREA (TYP.) 10 RUN (2) #12 AND (1) #12 GND. FROM ELECTRICAL PANEL "LG" TO VEEDER-ROOT OVERFILL ALARM. <br /> Y IO- I 11 INSTALL 2" DOUBLE WALL VENT LINE. SLOPE 1/8" TO 1/4" PER FOOT DOWN TO TANK. (SEE DETAILS). ALL EQUIPMENT, HARDWARE AND SYSTEM COMPONENTS MUST BE <br /> 12 INSTALLED IN STRICT CONFORMANCE WITH MANUFACTURER'S <br /> INSTALL NEW VENT RISER. TERMINATE 18" ABOVE ROOF LINE. INSTALL NEW IMPACT TANK BREATHER ON TOP OF VENT RISER. PAINT TO <br /> Of m 7 ) --- I MATCH BUILDING WALL. INSTRUCTIONS AND SPECIFICATIONS. <br /> BUILDING CONTRACTOR TO COMPLETE ALL EQUIPMENT TESTS REQUIRED BY GOVERNMENTAL AGENCIES. ALL CONDUCTORS TO BE THWN CU. <br /> f ® <br /> BY 13 RS 1 14 ALL MANHOLES AND BOXES TO BE INSTALLED STRAIGHT TRUE AND IN-LINE, AND 3" ABOVE OUTER EDGE OF SLAB.J ALL CONDUITS TO BE MINIMUM 3/4" UNLESS NOTED OTHERWISE.I 15 CONTRACTOR TO APPLY "SEALTITE" SEALANT TO ALL JOINTS IN WESTERN FIBERGLASS SECONDARY CONTAINMENT SYSTEM AND AT ENDS <br /> 6'-0" OF VAULT CONDUIT SLEEVE. <br /> LJ ° 1g CONDUIT RUN FROM TANK TO VEEDER-ROOT HOUSING (1) 12 CONDUCTOR AND (2) 3 CONDUCTOR BELDEN BELDFOIL 100% SHIELDED <br /> O CABLES. r7 T T w <br /> GENERATIOR DISCHARGE I 11 CONTRACTOR TO RUN SHIELDED SENSOR / GAUGE CABLE FROM TANK FILL SUMP J-BOX TO VEEDER-ROOT PANEL. CABLE MUST BE 16 HAZARDOUS S AREA NOTES <br /> A/C BY OTHERS A/� \HERS PLENUM BY OTHERS 1 AWG. MIN. USE BELDEN #83712 BELDFOIL 1007 SHIELDED CABLE WITH (12) TWELVE CONDUCTORS. <br /> I' II CONTRACTOR TO RUN SHIELDED SENSOR CABLES TO VEEDER ROOT PANEL BY WAY OF PIPING VAULT AND TANK. CABLE MUST BE 16 <br /> AWG MIN. USE BELDEN ,# 3� BELDFOIL 100% SHIELDED CABLE WITH (3) THREE CONDUCTORS. (OR ADDITIONAL CONDUCTORS AS IN AN OUTSIDE LOCATION, ANY AREA WITHIN 5'-0" HORIZONTALLY <br /> 5 REQUIRED TO MEET FIELD CONDITIONS). FROM ANY TIGHT TANK FILL PIPE SHALL BE CLASSIFIED AS A CLASS <br /> O PLANTING I <br /> BY OTHERS 9 17 CONSTRUCT OC DETAIL 5, SHEET P-4. <br /> 1 DIVISION 2 HAZARDOUS AREA, <br /> NORTH BY OTHERS 18 CONTRACTORRTO REPLACE REINFORCED COR <br /> ENY A/C PAVING DAMAGED DURING FUELING SYSTEM INSTALLATION WITH NEW 4" PAVING OVER 8" ORE. <br /> SLURRY SEAL-COAT ALL NEW A/C PAVING. THE SPHERICAL VOLUME WITHIN A 3'-0" RADIUS OF ANY TANK <br /> PLANTING 1" = 30'-0 I PLANTING I 79 CONTRACTOR TO REPLACE ANY CONCRETE DAMAGED DURING TANK SYSTEM INSTALLATION WITH NEW CONCRETE TO MATCH EXISTING IN HAZARDOUS SHALL AREA.LBE CLASSIFIED AS CLASS 1 DIVISION 1 <br /> LJUU VENT PIPE BY OTHERS <br /> BY OTHERS a❑❑ SECTION, SLOPE, COLOR & KIND. <br /> ©0 CONTRACTOR TO LOOSELY WRAP WESTERN FIBERGLASS SECONDARY WITH INSULATED 12 GAUGE COPPER WIRE FROM ALL ELECTRICAL CONDUITS, FITTINGS, ETC. IN THESE AREAS SHALL <br /> TANK PIPING SUMP EXIT POINT TO PIPING VAULT TRACER TERMINATION BOLT ATTACHMENT PER DETAIL 3 ON SHEET CONFORM TO THE LATEST EDITION OF N.E.C. ARTICLE 514. <br /> 15'-4" P-4, BOTH TRACER WIRES TO BE ATTACHED TO BOLT CAST IN VAULT WALL. ATTACH PLASTIC SIGN INSCRIBED WITH ELECTRICAL WIRING AND EQUIPMENT BELOW A HAZARDOUS AREA <br /> 1" BLACK LETTERS ON A WHITE BACK-GROUND IN VAULT. SIGN TO READ "FUEL PIPE TRACER". SHALL BE RATED FOR CLASS 1 DIVISION 1. PROVIDE SEAL-OFF <br /> FITTINGS ON ALL CONDUITS ENTERING OR LEAVING A HAZARDOUS <br /> '^ 21 TANK INSTALLATION CONTRACTOR TO WORK IN CONCERT WITH GENERAL CONTRACTOR TO INCORPORATE PIPING VAULT REBAR❑ CAGE, (1) AREA. <br /> CONDUIT SLEEVE & (2) PIPING SLEEVES IN GENERATOR ROOM CONCRETE FOUNDATION PRIOR TO POURING Of GENERATOR ROOM <br /> GENERATOR BREAKER FLOOR. <br /> © CONTRACTOR TO RUN SHIELDED SENSOR CABLE FROM GENERATOR ROOM PIPING TRANSITION VAULT J-BOX TO VEEDER-ROOT BY WAY <br /> _S� — 4 BY OTHERS GENERATOR OF TANK. CABLE MUST BE 16 AWG MIN. USE BELDEN #83703 BELDFOIL 100% SHIELDED CABLE WITH (3) THREE CONDUCTORS. <br /> THE FOLLOWING REQUIREMENTS ARE TO BE MET: BY OTHERS © NOT USED IMPORTANT NOTICE <br /> 4 CONTACTOR TO INSTALL UNI-STRUT SENSOR SUPPORT IN CONCRETE PIPING VAULT TO MAINTAIN VERTICAL POSTION Of LEAK SENSOR Section 4216 / 4217 of the Government <br /> T <br /> a. ANK SYSTEMS TO BE INSPECTED BY CUPA AGENCIES MAY HAVE ADDITIONAL BY OTHERS PER PIPING VAULT PLAN HOUR NOTIFICATION PRIOR TO TANK INSTALLATION. NOTE : LOCAL IMPLEMENTING CONCRETE © Code requires a Dig Alert Identification <br /> b. TAAGVIEW PER DETAILS, SHEET P4 Number be issued before a <br /> AT (3) THREE SEPARATE CONSTRUCTION PHASES: REQUIREMENTS 5 NOT© USED Permit to Excavate will be valid <br /> _ __ For your Dig Alert ID Number Call <br /> 1. TANK & PRIMARY PIPING HYDROSTATICALLY OR © <br /> PNEUMATICALLY TESTED FOR 30 MINUTES. RUN (2) #12 (CONTROLS) FROM VEEDER-ROOT TANK MONITORING PANEL TO VEEDER-ROOT OVERFILL ALARM ACKNOWLEDGEMENT Underrouad <br /> SWITCH. Service Alert <br /> 2. INSPECTION OF ALL SECONDARY CONTAINMENT, © NOT USED CALL: TOLL FREE CALL: TOLL FREE <br /> INCLUDING TESTING, IN ACCORDANCE WITH I-800-422-4133 1-800-642-2444 <br /> MANUFACTURER'S GUIDELINES. EXIST. ELECT. e \ ® RUN (2) #12 AND (2) #12 SLID. FROM ELECTRICAL PANEL "LB" TO VEEDER-ROOT TANK MONIITORING PANEL IN SOUTHERN CAUFORNIA IN NORTHERN CALIFORNIA <br /> 3. FINAL INSPECTION, INCLUDING ALL PORTIONS OF PANEL 1 Two wondog Days Before You Dig <br /> THE LEAK DETECTION SYSTEM. <br /> w <br /> c. TANK SYSTEM INTEGRITY TESTS FORWARDED & APPROVED <br /> Engineers Note to Contractor: <br /> BY CUPA PRIOR TO TANK SYSTEM The existence and location of any underground utilities, pipes, <br /> BEING PLACED IN OPERATION. and/or structures shown on these pions were obtained by a <br /> d, STATE WATER RESOURCES FORMS (FORMALLY A, B, AND search of available records. To the best of our knowledge, <br /> there are no existing utilities except as shown on these plans. <br /> C) MUST BE COMPLETED & SUBMITTED PRIOR TO TANK The contractor shall ascertain the true vertical and horizontal <br /> OPERATION. location and size of those underground utilities to be used ISSUE DATE# 00-00-00 <br /> and shall be responsible for any damage to any public or DRWG# CLLC##-##-YRMO <br /> e. AN UNAUTHORIZED RELEASE RESPONSE PLAN MUST BE private utilities, shown or not shown hereon. $HT Al, t St <br /> SUBMITTED & APPROVED BY CUPA r r <br /> Iffiff <br /> PRIOR TO TANK OPERATIONS. <br /> I. EVIDENCE OF FINANCIAL RESPONSIBILITY SUBMITTED TO ISSUE DATE 00 <br /> DRWG# CLLC##—##—YRMO#—YRMO <br /> CUPA, SHT Al, M1, St <br /> UNDERGROUND TANK REMOVAL PROCEDURE PIPING INSTALLATION NOTES REVISIONS / AUTHORIZATIONS <br /> NO. REMM /NIIIO11SOU N$ WE gy <br /> 1. Contractor shall call U.S.A. and have utilities field marked 11. Shore the edge of the tank hole, if regwired. All shoring is 18. If excavation is left open overnight, Contractor to completely <br /> prior to any excavation. In addition, Contractor shall make to be in place before excavating tank. fence off the tank hole with six (6) foot high temporary chain UNDERGROUND FUEL SYSTEM PIPING <br /> link fencing, no exceptions. A lockable gate shall be <br /> visual and magnetic inspection of work area for any 12. Dig down to. the top of the tank. provided on all excavations left open more than 2 days. <br /> possible underground utilities and conduits. Contractor is See plans for location. INSTALL ALL PIPING PER MANUFACTURER'S MINIMUM BEND RADIUS AND ALL OTHER MANUFACTURER'S INSTALLATION SPECIFICATIONS. <br /> responsible for restoring any underground utilities 13. Remove the fill (drop) tube and TLS proobe. Disconnect the CONTRACTOR SHALL AIR PRESSURE TEST ALL PRIMARY & SECONDARY PIPING PRIOR TO BACKFILLING OR CONNECTING TO TANKS AND UPDATED 08/17/00 <br /> damaged during construction. fill, gauge, and product and vent lines. Cap or plug open 19. Upon approval of SBC Facility Engineer and SBC GENERATORS. ISOLATE AND CAP ALL PRIMARY PIPING RUNS & PRESSURIZE TO 75 P.S.I. (MIN.) FOR 30 MINUTES (MIN.), OR LONGER <br /> PROPRIETARY SBC INFORMATION <br /> 2. Notify SBC Facilities Engineer, ends of the lines which are not to be used further. Environmental Manager, Contractor shall install new AS REQUIRED BY LOCAL AGENCY. SOAP TEST ALL JOINTS AND INSPECT FOR LEAKS. REPAIR ANY LEAKS DISCOVERED AS REQUIRED. D DW <br /> I%F'OR GENERAL USE ��RR ISCLORgUREg 0 IPDF OF SBC <br /> Site Contact, and U.S.A. Remove any remaining liquid from the delivery line tank. SECONDARY PIPING TO BE AIR TESTED AFTER CONNECTION IN CONTAINMENT SUMP AND IN BUILDING PIPE TRENCH AT 3 P.S.I. (MIN.) ENVIRONMENTAL MANAGEMENT UNDER EXEMP110N$ SET FORTH IN <br /> forty-eight (48) hours prior to start of tank removal or using care to avoid spillage. TO 5 P.S.I. (MAX.) FOR 30 MINUTES (MIN.), OR LONGER AS REQUIRED BY LOCAL AGENCY. SOAP TEST ALL CONNECTIONS AND JOINTS THE CALIFORNIA PUBLIC RECORDS ACT. THIS INFORMATION MAY <br /> 20. Replace or restore any existing site condition damaged or AND INSPECT FOR LEAKS REPAIR ANY LEAKS DISCOVERED AS REQUIRED. MAINTAIN THE AIR TEST ON THE SECONDARY CONTAINMENT ONLY BE USED BY AUTHORIZED PERSONNEL OF THE LOCAL <br /> any excavation. 14. Plug all tank openings with one plug. to have 1/8 inch vent altered during the tank removal and installation, remove PIPING DURING THE BACKFILLING PROCESS AND VERIFY THAT NO PRESSURE DROP OCCURRED IN THE SECONDARY PIPING. INSPECT FOR GOVERNMENT AGENCY R��IN CONNECTION WITH APPLICATION FOR <br /> hold for temperature expansion. sheet Pt� T�RAt�t� I TL�HANG (�NS FOR BUILDINGS, CONSTRUCTION, <br /> 3. Fuel d existing underground tank shall be removed piling LEAKS. REPAIR ANY LEAKS DISCOVERED. AFTER BACKFILLING PIPING RUNS, BOTH PRIMARY AND SECONDARY PIPING SYSTEMS TO BE <br /> and disposed of by SBC. 15. The tank shall he mode inert by using thirty pounds of dry RETESTED PER AFOREMENTIONED PROCEDURES. THE TESTING OF THE PRIMARY AND SECONDARY PIPING MUST BE WITNESSED BY <br /> ice per thousand gallons of tank capacity or as required 21. All water and soil tests shall have results submitted to the ENVIRONMENTAL MANAGEMENT AND LOCAL REGULATORY AGENCIES. AFTER SUCCESSFUL COMPLETION OF PIPING TEST, CONTRACTOR TO DRAWINGS PREPARED FOR <br /> 4. _ will o for and a for tank removal permits. b local authorities. environmental management department of SBC within 24 hours <br /> apply pay p y PULL BACK REDUCING BOOT FROM SECONDARY PIPING IN TANK SUMP TO ALLOW UNRESTRICTED DRAINAGE FROM SECONDARY PIPING <br /> P arranging P 16. After tank has been inspected by local health and fire after the samples are taken. <br /> Contactor is responsible is b for t ran in inspections. All tank P SYSTEM INTO THE CONSTANTLY MONITORED TANK SUMP. ENVIRONMENTAL MANAGEMENT <br /> and piping removal is by Contractor, Contractor shall inspectors, excavate and remove tank sand piping. <br /> II cooperate with "Environmental Contractor" for soil/water Contractor to load tank and piping on transport provided <br /> sampling and disposal of tank. by others. Disposal of tank and piping by Enviro. Contractor. PACIFIC REGION <br /> m 5. Provide fire extinguishers of size and rating specified by Contractor to remove and dispose of existing concrete <br /> local fire departments. tie-down slab beneath tank if specified in Scope of Work PROJECT III <br /> on sheet P-1. <br /> 6. There shall be no welding or other sources of ignition in TANK SUMP HYDROSTATIC TEST <br /> a 17, After the existing tank is removed, soil and/or water samples <br /> Z the area while the removal operations are in progress. g p <br /> a There shall be no smoking on the job site. "NO will be taken from the tank hole by the Environmental ALL NEWLY INSTALLED TANKS AND TANKS RETROFITTED WITH NEW SUMPS OR NEW HARDWARE THAT ENTERS OR EXITS A SUMP ARE TO <br /> a SMOKING" signs shall be posted. Contractor. If the soil/water samples are clean, then soil BE HYDROSTATICALLY TESTED WITH A HEAD OF WATER ONE FOOT ABOVE THE HIGHEST POINT OF PENETRATION OR JOIN. <br /> shall be disposed of by Contractor. If contamination is <br /> 7. Provide barricades with flashing yellow lights and warning discovered, Contractor to notify SBC Environtmental Manager <br /> signs to protect pedestrians and/or motor vehicles from immediately. Contaminated soil is to be stacked separately <br /> work area and tank hole. on visqueen and covered with visqueen and anchored firmly SHEET TITLE: <br /> 8. Drain, and when appropriate, flush product in the piping to prevent it from being blown off. Provide an asphalt, EMERGENCY GENERATOR SUCTION SYSTEM <br /> g into the tank. concrete sandbag berm around all dirt stack. piles to SITE PLAN TANK REMOVAL, & INSTALLATION <br /> prevent runoff, <br /> , <br /> off. Disposal of contaminated soil will be under <br /> 9. The Rinse Contractor shall remove all remaining flammable separate contract. NOTES <br /> liquid from the tank which can be pumped out. It may be <br /> necessary to use a hand pump to remove the bottom few, ES11MA1Tf ROUTINE ORDER: <br /> Inches of product and rinsate. All residual liquid or sludge, Disposal of contaminated soil will be by Environmental Contractor. ORK4 DATE. � 1 <br /> P 9 9 ORA:AN Br: afEcxEo Br: <br /> including rinstate will be disposed of by Environmental Contractor. Contractor shall load contaminated soill on truck provided by SecZFH Tm. -__ <br /> Environmental Contractor. SNEEr: 2 OF. 8 sHET:-rs SHEET No. <br /> � 10. Sawcut and remove concrete or A.C. cover for access to ARC®TBLTGRB • BNGQiB�Il4C • BiVIltGNY�ITAL SIVICBS _ <br /> tank, dispose of concrete and A.C. debris. 1137 N. McDOKU. BLVD. PETALUMA, CA 94954 (707) 765-1660 SBC DRWN' NO.: <br /> DIC JOHN W. JOHNSON, ARCHITECT JAMES H. RAY, CIML ENGINEER P2 <br />