My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REMOVAL REMOVAL 1990
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
S
>
SHELTON
>
25499
>
2300 - Underground Storage Tank Program
>
PR0503150
>
REMOVAL REMOVAL 1990
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/6/2020 4:42:42 PM
Creation date
11/6/2018 1:34:12 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
REMOVAL
FileName_PostFix
REMOVAL 1990
RECORD_ID
PR0503150
PE
2333
FACILITY_ID
FA0005702
FACILITY_NAME
PODESTA LAND PARTNERSHIP ONE
STREET_NUMBER
25499
STREET_NAME
SHELTON
STREET_TYPE
RD
City
LINDEN
Zip
95236
APN
09318014
CURRENT_STATUS
02
SITE_LOCATION
25499 SHELTON RD
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\S\SHELTON\25499\PR0503150\REMOVAL 1990 .PDF
QuestysFileName
REMOVAL 1990
QuestysRecordDate
10/23/2017 5:17:34 PM
QuestysRecordID
3694422
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
9 0 <br />SAN JO21-S2UIN LOL L HEP.LTIi DISrrRICT <br />SAMPLING PROTOCAL FOR ROUTINE TANK REMOVALS <br />The following re resents minimum sampling criterion required for closure compliance. Soil <br />samples collected shall be representative of native soils beneath the tank s <br />invert (tank's bottom) at a collection depth not be exceed 2 - 9 feet. If contamination <br />is <br />stS <br />documented <br />during clojLHD sure, <br />r <br />an Unauthorized Release notification must be filled out and <br />submitted <br />on <br />WATER NOT PRESENT IN THE, TANK PIT <br />........._._ <br />TANK SIZE MINIMUM NUMBER ON LOCATION OC SOIL SAMPLES <br />SOIL SAMPLES <br />Less than 1000 gallons ONE per tank Fill or pump end of tank <br />1000 - 10,000 gallons TWO per tank One at each end of tank <br />10,001 gallons and up THREE OR MORE Ends and Middle or <br />per tank generally spaced along <br />Piping <br />he leng h of e an <br />ONE EVERY 20 LINEAL FEET <br />WATER IS PRESENT IN TANK PIT <br />TANK SIZE - 1 MINIM[MNO OF LOCATION OF SOIL MINIMUM NUMBER <br />L SOIL SAMPLESSAMPLES OF WATER SAMPLES <br />10,000 GALLONS From wall next to <br />OR LESS tank ends at soil/ <br />(Single Tank) TWO groundwater ONE <br />interface <br />GREATER THAN From wall next to ONE <br />10,000 GALLONS tank ends at soil/ <br />OR groundwater <br />TANK CLUSTER FOUR interface <br />OTHER SPEC I AT. CONDITIONS <br />SLAB PRESENT IN TANK PIT <br />Soil samples shall be obtained beneath the slab within native soils. Penetration through <br />the obstruction will be required in order to collect the samples. (Physical removal of the <br />obstruction will then allow sampling according to the above conditions.) <br />TANK SIZE <br />Less than 1000 gallons <br />1000 - 10,000 gallons <br />10,001 gallons and up <br />EH 23 097 12/88 <br />REVISED 1/89 <br />MINIMUM NUMBER OF <br />SOIL SAMPLES <br />THREE per tank <br />FIVE per tank <br />FIVE OR MORE per <br />tank <br />LOCATION OF SOIL SAMPLES <br />Center and ends or sides <br />Center and ends or sides <br />Ends and Middle and <br />generally spaced along <br />Ehe length of the tank <br />
The URL can be used to link to this page
Your browser does not support the video tag.