My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE HISTORY
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HARDING
>
16
>
3500 - Local Oversight Program
>
PR0508502
>
SITE HISTORY
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/6/2018 8:23:15 PM
Creation date
11/6/2018 3:17:36 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
SITE HISTORY
RECORD_ID
PR0508502
PE
3526
FACILITY_ID
FA0008117
FACILITY_NAME
ARCO STATION #4932
STREET_NUMBER
16
Direction
E
STREET_NAME
HARDING
STREET_TYPE
WAY
City
STOCKTON
Zip
95204
APN
13902001
CURRENT_STATUS
01
SITE_LOCATION
16 E HARDING WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
72
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
y • • <br /> SECOR <br /> International Incorporated <br /> April 13, 1999 <br /> Project 7G600-042-01 <br /> Ms. Lori Duncan <br /> San Joaquin County Environmental Health Department <br /> 304 East Weber Avenue <br /> Stockton, California 95202 <br /> Re: Work Plan for Soil Sampling <br /> during Product Line/Dispenser Upgrade <br /> ARCO Service Station#4932 <br /> 16 East Harding Way <br /> Stockton, California <br /> Dear M4. Duncan: <br /> On behalf of ARCO Products Company (ARCO), SECOR International Incorporated <br /> (SECOR) will be performing environmental services associated with product <br /> line/dispenser upgrade activities at the above referenced site (Figure 1). An ARCO- <br /> approved contractor will be responsible for all construction activities associated with <br /> product line/dispenser upgrade activities. Construction activities are tentatively <br /> scheduled to begin in April of 1999. The purpose of this Work Plan is to notify the San <br /> Joaquin County Environmental Health Department(SJCEHD) of the upcoming product <br /> line/dispenser upgrade activities and briefly discuss the sampling procedures to be <br /> followed. <br /> SITE BACKGROUND <br /> The site is located at 16 East Harding Way in Stockton, California (Figure 1). The site is <br /> an operating ARCO service station and mini-mart that retails gasoline fuel. The site <br /> currently contains three gasoline underground storage tanks (USTs) and associated <br /> product lines and dispensers. Two pump islands are present at the site, one on the <br /> northern portion of the site and one on the western portion of the site (Figure 2). <br /> PROPOSED SCOPE OF WORK <br /> Compliance soil samples will be collected from below the product lines and dispensers <br /> per the Tri Regional Board Staff Recommendations for Preliminary Evaluation and <br /> Investigation of Underground Tank Sites. Field and laboratory procedures are included <br /> as Attachment A. <br /> 9912 Business Park Drive, Suite 100, Sacramento, CA 95827 (916)364-1880(916)364-1889 FAX u4twsecorcom <br />
The URL can be used to link to this page
Your browser does not support the video tag.