My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0002736
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HARDING
>
16
>
3500 - Local Oversight Program
>
PR0508502
>
ARCHIVED REPORTS XR0002736
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/7/2018 10:00:28 AM
Creation date
11/6/2018 3:28:43 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0002736
RECORD_ID
PR0508502
PE
3526
FACILITY_ID
FA0008117
FACILITY_NAME
ARCO STATION #4932
STREET_NUMBER
16
Direction
E
STREET_NAME
HARDING
STREET_TYPE
WAY
City
STOCKTON
Zip
95204
APN
13902001
CURRENT_STATUS
01
SITE_LOCATION
16 E HARDING WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Nage 1 d 2 c <br /> 4QO2 WELL SAMPLING REQUEST - <br /> t7-711 <br /> RCO 493216 East Hardin Wa Stockton <br /> roject No Task# Project Name Release# Project Manager Approval DateLSLeauoia <br /> ab Release# Site Engineer <br /> BP 54932 02 0327 ARCO 4932 28896 Rus Benko 28896 Paul Supple <br /> Well Samp Gauging Sampling Analyses TOB Well Casing Depth to Comments <br /> Number Order Frequency Frequency TOC Depth Dia (in) Top of Screen <br /> MW-1 12 1 Quarterly Quarters TPH TEX/MtBE/0 enates 40 4 1 10 <br /> MW-2 11 Quarterly Quarter) TPH TEX/MIBEIO enates 40 4 10 <br /> MW-3 10 Quartedy Quarter) TPH BTEXIMtBE/O enates 40 4 10 <br /> MW-4 17 Quartedy Quartets TPH TEX/MtBE/O enates 40 1 4 5 <br /> SVE-1 16 Quarterly Quarter) TPH TEXIMtBE10 enates 30 2 5 <br /> MW-5 6 Quarterly Quarter) TPH /BTEXIMtBE/O enates 40 2 20 <br /> MW-6 13 QuarterlyQuarter) TPH BTEX WBE/O enates 40 2 20 <br /> MW-7 1 Quarterly Quarter) TPH TEX/MtSE/O enates 40 2 20 <br /> MW-8 2 Quattedy Quarter) TPH TEX/MtBEIO enates 40 1 2 20 <br /> MW-9 7 Quartetsy Quarter) TPH BTEX/MtBE10 enates 40 2 20 <br /> MW-10 3 Quartedy Quarter) TPH BTEXI"MO enates 40 2 20 <br /> MW-11 4 Quarterly Quarter) TPH- TEX/MtBE/O enates 40 2 20 <br /> EW-1 18 Quartadv Quarter) TPH BTEX/MtBE/Ox enates 41 6 21 <br /> EW-2 14 Quarterly Quarto TPH- BTEXIMtBE/O enates 43 6 20 <br /> EW-6 15 Quarterly Quarterly TPH-gBTEXIMtBE/Oxygenates 35 6 15 New Well Develop and Sample <br /> 11114/02 <br />
The URL can be used to link to this page
Your browser does not support the video tag.