Laserfiche WebLink
1 <br /> Page 2 of 2 <br /> i <br /> 4Q02 WELL SAMPLING REQUEST <br /> ARCO 4932 1 East H rding Way,Stockton <br /> Project No Task# Project Name Release# Project Manager Approval Date Lab Release# Site Engineer <br /> 77BP 54932 02 0327 ARCO 4932 28896 Rusty Benkos Sequoia 28896 Paul Supple <br /> DMW-1 8 Quarterly Quarterly TPH TE)IWBEPO enates 80 2 75 <br /> DMW-2 5 Quarterly Quarter) TPH TEX/MtBEIO enates 82 2 77 <br /> DMW-3 9 Quarterly Quarters TPH TEX/MtBE/0 enates 82 2 77 <br /> QCTB I --- --- --- TPH-WBTEX/MtBE -- -- I -- <br /> Analyze samples for TPHg/BTEX/MtBE by EPA Method 8015/8020, and fuel oxygenates (1,2-DCA, EDB, MtBE,TAME, DIPE, TBA,and EtBE)by EPA Method 8260 <br /> Purge all wells/Measure DO In all wells <br /> EW-6 is anew extraction well Bring a trash pump to develop well Develop on Wednesday 11/20 and sample on Thursday 11121 <br /> Get a TRIP BLANK SAMPLE from the lab prior to sampling <br /> I � <br /> Contact Lori Duncan 48 hrs ahead <br /> Number of wells gauged without sample = F— Total gallons purged <br /> Number of wells sampled (PURGE) _ �6 <br /> Number of wells sampled (NOT PURGE= © Traffic Control (Circle one) YES NO <br /> • + � i vi a�a2 <br />