Laserfiche WebLink
SVEIGWE SYSTEM <br /> FIELD MONITORING DATA SHEETS <br /> t <br /> Date W Time of Arrival tJ�© <br /> Technician _ 12� W Time of Departure <br /> Site Engineer Rush Benkoskv „ Was Site Engineer contacted from field? Yes No <br /> PART A GENERAL INFORMATION <br /> Site Location ARCO 4932, 46 Harding Way, Stockton Prolect No 77BP 54932 03 0336 <br /> Abatement Equip ThermTech Vac 50 -540 cfm Thermal/Catalytic pxidizer Serial No <br /> SVE Blower.29 HP Travrni 4R with Choke Max AMP Rating <br /> Telemetry NA MAX AMP Rating <br /> Electrical Power 239V 3 phase—200 amp __ _ <br /> Elect Meter Reading ,3 <br /> Supplemental Fuel 5 psi Natural gas <br /> — <br /> . y Supp Fuel Meter Reading <br /> No of K10 barrels at site _. —Full Empty <br /> PART B SVIE SYSTEM DATA <br /> System up or down upon arrival JC7 (If down please complete PART E) <br /> Hourmeter Reading _Q2263., At time r� <br /> Flow Data Before Ad ustment After Ad ustment Final <br /> %Dilution air valva open <br /> K/O Content al <br /> Va mum Cower{in H2O) <br /> nin <br /> AMPS drawn U blower motor AMPS <br /> Total System Flow(A P,in H2O) <br /> Pip2 Size <br /> Well Size 0 Air Flow(e P,In H2O) <br /> Dilution Air Flow(A P."H2O) <br /> Pipe Size <br /> 11) <br /> FID Data <br /> System Influent my ell Field <br /> S tem Influentmy Air Stripper) <br /> System Effluent my <br /> Fleid Instrument Used Last Calibrated <br /> 3¢ V,4C �.•`l•c/l r�v,�s p ��ov�. e <br /> I4ry <br /> ►�,�.c �.s iC�a <br /> Completed By Date ©- <br />