Laserfiche WebLink
PART C ABATEMENT EQUIPMENT DATA <br /> THERMAL OXIDIZER <br /> Before Ad ustment Final <br /> Mode Thermal <br /> Oxidizer Setpoint °F <br /> Inlet Tem erature °F <br /> High Tamp Setpoint °F <br /> Auto Dilution Set Point std v <br /> Exhaust Tem erature(01=1 3N <br /> PART D GWE SYSTEM DATA <br /> Effluent Totalizer Reading At time � <br /> Please Note The Flow Totalizer was calibrated on 5/29/03 and is periodically Cleaned to remove mineral scale <br /> S tem Data Before Adjustment Final <br /> Ban Filter Inlet/Outlet Pressures(psi) <br /> Carbon Vessel C-4 (psi) <br /> Carbon Vessel C-2 sl <br /> Carbon Vessel C-3 si <br /> Air Stripper System Data Before Ad ustment Final <br /> Vacuum at Air Shipper H20 <br /> Air StjM Flow rate <br /> Air SM r Valve Seta —� <br /> Air SW r FID Data <br /> Air Stripper Effluent my <br /> Field Instrument Used Last Calibrated <br />