My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0002747
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HARDING
>
16
>
3500 - Local Oversight Program
>
PR0508502
>
ARCHIVED REPORTS XR0002747
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/7/2018 9:17:06 AM
Creation date
11/6/2018 3:36:07 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0002747
RECORD_ID
PR0508502
PE
3526
FACILITY_ID
FA0008117
FACILITY_NAME
ARCO STATION #4932
STREET_NUMBER
16
Direction
E
STREET_NAME
HARDING
STREET_TYPE
WAY
City
STOCKTON
Zip
95204
APN
13902001
CURRENT_STATUS
01
SITE_LOCATION
16 E HARDING WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
60
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
0 <br /> • <br /> 12.0 Detailed List of Stens with Hazard Assessments and Precautions <br /> Traffic Control Plan <br /> (Incidents on sites have shown the need for a well-thought out traffic control plan This plan must consider <br /> ♦ Level of traffic activity on a site and provide for the safety of all workers on the site E g, a gasoline site that is open to the public should require <br /> sawhorse barricades to protect workers <br /> ♦ Cones and caution tape have proven ineffective in a number of situations Other traffic control precautions include candles, oversized cones with <br /> flags, placing vehicles between staff and the public, etc <br /> ♦ We must cordon off as much space as is necessary to ensure our safety This must be discussed with clients as it may mean closing down additional <br /> gasoline pumps or entrances to a factory, etc <br /> ♦ Company and personal vehicles should be parked as far away from potential traffic as possible <br /> ♦ How contractor heavy equipment, e g, vacuum trucks, drill rags, cranes, loader/diggers, etc will be parked and maneuvered around the site All <br /> heavy equipment movements must be coordinated in advance to avoid incidents <br /> ♦ Review local regulations for formally developed traffic control plans signed by licensed individuals, police details,flagmen, hours of activity, <br /> closure of streets to move equipment, etc) <br /> Use traffic cones and tape where necessary for gas station patrons and pedestrians <br /> Work on this project will be conducted during the hours normal business hours <br /> Shutoff valves/switches for utilities and products <br /> Valves and switches located onsite <br /> Personal Safety Concerns and Precautions <br /> Site located downtown <br /> Task 1 The following table addresses the generic concerns of soil and groundwater sampling This also includes installation of wells <br /> O Job Steps _ ® Potential Hazard _ ® Critical Actions _ <br /> Clear drilling locations Traffic hazards,overhead and underground Reference Borehole Clearance Review form and <br /> installations,product releases,property ___ coordinate with Station Manger(or designee)to rmmimze <br /> SECOR International Incorporated 13 Genene HASP <br />
The URL can be used to link to this page
Your browser does not support the video tag.