Laserfiche WebLink
0 <br /> • <br /> 12.0 Detailed List of Stens with Hazard Assessments and Precautions <br /> Traffic Control Plan <br /> (Incidents on sites have shown the need for a well-thought out traffic control plan This plan must consider <br /> ♦ Level of traffic activity on a site and provide for the safety of all workers on the site E g, a gasoline site that is open to the public should require <br /> sawhorse barricades to protect workers <br /> ♦ Cones and caution tape have proven ineffective in a number of situations Other traffic control precautions include candles, oversized cones with <br /> flags, placing vehicles between staff and the public, etc <br /> ♦ We must cordon off as much space as is necessary to ensure our safety This must be discussed with clients as it may mean closing down additional <br /> gasoline pumps or entrances to a factory, etc <br /> ♦ Company and personal vehicles should be parked as far away from potential traffic as possible <br /> ♦ How contractor heavy equipment, e g, vacuum trucks, drill rags, cranes, loader/diggers, etc will be parked and maneuvered around the site All <br /> heavy equipment movements must be coordinated in advance to avoid incidents <br /> ♦ Review local regulations for formally developed traffic control plans signed by licensed individuals, police details,flagmen, hours of activity, <br /> closure of streets to move equipment, etc) <br /> Use traffic cones and tape where necessary for gas station patrons and pedestrians <br /> Work on this project will be conducted during the hours normal business hours <br /> Shutoff valves/switches for utilities and products <br /> Valves and switches located onsite <br /> Personal Safety Concerns and Precautions <br /> Site located downtown <br /> Task 1 The following table addresses the generic concerns of soil and groundwater sampling This also includes installation of wells <br /> O Job Steps _ ® Potential Hazard _ ® Critical Actions _ <br /> Clear drilling locations Traffic hazards,overhead and underground Reference Borehole Clearance Review form and <br /> installations,product releases,property ___ coordinate with Station Manger(or designee)to rmmimze <br /> SECOR International Incorporated 13 Genene HASP <br />