Laserfiche WebLink
- damage,dealer inconvenience potential conflicts Review proposed locations against ` <br /> available construction drawings and known utilities,tanks, <br /> product lines,etc Mark out the proposed borehole <br /> locations Call underground utility locating service for <br /> public line location clearance and get list of utilities being <br /> contacted If necessary,coordinate private line locator for <br /> Mobilize with proper Vehicle accident Lifting hazards Delay Follow safe driving procedures Employ safe lifting <br /> equipment/supplies for drilling or improper performance of work due to procedures Make sure sub-contractors are aware of their <br /> improper equipment onsite responsibilities for labor,equipment and supplies Review <br /> HSP andpermit conditions and gather necessary PPE <br /> Visually clear proposed drilling Underground and overhead installations Complete Pre-Mobilization section of Borehole Clearance <br /> locations _ _ -Review form and adjust drilling locations as necessary___ <br /> Set up necessary traffic control - �� Struck by vehicle during placement Use buddy system for placing traffic control Reference <br /> Vehicle accident as a result of improper traffic control plan section of HSP(may include specific <br /> _--- --- --_-_ traffic control equipment placement —_ requirements based onyi rmgt ) — <br /> Assist with set up of rig Vehicle accident during ng movement Verify clear pathway to drilling location and clearance for <br /> Damage caused by ng while accessing set- raising mast Provide as-needed hand signals and guidance <br /> up location Contact with overhead to driver to place ng Visually inspect rig(fire <br /> installations Soft terrain Rig movement extinguisher on board,no oil or other fluid leaks,cabling <br /> and associated equipment in good condition,pressurized <br /> hoses secured with whip-checks or adequate substitute, <br /> jacks in good condition9) If necessary,use wooden blocks <br /> _underaacks t ad load-_Chock wheels <br /> Set up exclusion zone(s)and work Struck by vehicle during set up Slip/fall Implement exclusion zone set-up instructions of HSP Set <br /> stations(drilling and loggingisample hazards up work stations with clear walking paths to and from ng <br /> collection) <br /> Clear upper five feet of boring using _ Back strain,exposure to chemical hazards, Don required PPE and initiate air quality monitoring in <br /> post-hole digger or bucket auger hitting an underground utility,repetitive accordance with the HSP Use proper lifting techniques <br /> motion and tools Complete the Pre-Drilling section of the <br /> Borehole Clearance Review form <br /> I <br /> SECOR International Incorporated 14 Generic HASP <br />