Laserfiche WebLink
� • i • <br /> O Job Steps ® Potential Hazard ® Critical Actions _ <br /> Commence drilling -- — -- Crass-contamination from previous hole Decontaminate sampling after collecting a sample and <br /> back strain,heat or cold,eye injury,noise, decontaminate drilling equipment after each borehole Use <br /> exposure to chemical hazards hitting an proper Fitting techniques Use PPE and monitoring in <br /> underground utility, trip and fall, accordance with HSP(especially note ear protection) <br /> equipment failure Monitor drilling progress Keep work area clear of <br /> tripping or slipping hazards Perform periodic visual <br /> _Ins <br /> ections of drill ng__ <br /> Collect samples in accordance with Cross-contamination,improper labeling or Decontaminate sampling equipment between each <br /> sampling plan storage,exposure to site contaminants sampling run Label samples in accordance with sampling <br /> plan Keep samples stored in proper containers,at correct <br /> temperature,and away from work area Perform air <br /> monitoring and wear proper PPE Inspect hammer cable <br /> prior to the collection of each core <br /> Store cuttings properly in accordance Exposure to public Traffic hazard or Have proper storage containment and labeling available <br /> with site-specific requirements obstruction/inconvenience to station onsite Place matenals in isolated location away from <br /> operation Improper storage or disposal traffic and other site functions Coordinate proper disposal <br /> offsite(where applicable) <br /> Backfill borehole Improper grouting can lead to future Mix grout to specification and completely fill the hole <br /> vertical conduit for contaminant migration Use proper lifting techniques and wear proper PPE Keep <br /> Back strain,trip hazards,eye injury from work area clear of tripping hazards Verify presence or <br /> splashing or release of pressurized grout other authorization by required inspectors for grouting <br /> Unauthorized backfilling causes extra <br /> work_ <br /> Dispose or store purge water(if any) Back strain Exposure to contaminants If Use proper equipment to transport water(pumps,drum <br /> onsite disposing through onsite treatment system, dollies,etc) Wear PPE in accordance with HSP Review <br /> damage or injury from improper use of instructions for use of onsite treatment systems Label <br /> equipment Improper storage or disposal storage containers properly,and locate to isolated area <br /> away from traffic and other site functions Coordinate <br /> offsite disposal(where applicable) <br /> Clean site/demobilize Traffic Safety hazard left on site Lifting Use buddy system as necessary to remove traffic control <br /> hazards Leave site clean of refuse and debns Clearly <br /> mark/barricade any borings that need later topping off or <br /> cunng Notify station personnel of departure,final well <br /> locations and any cuttings/purge water left onsite Use <br /> properlifti techni ues <br /> Package and deliver samples to tab Bottle breakage,back strain Handle and pack bottle carefully(bubble wrap bags are <br /> _helpful) Use proper hftm9 techniques <br /> Task 2 The following table addresses the concerns with Monitoring Well LPH Removal <br /> Field staff must review job-spectfic work plan and coordinate with project manager to verify that all up front logistics are completed prior to starting work including, but not limited to,permitting, <br /> access agreements,and notification to required contacts(e g site managers, inspectors, clients, subcontractors, etc) A tailgate safety meeting must be performed and documented at the beginning of <br /> each workdav Sae Performance Sel Assessment(SPSA)Procedures must be used throe hout the urviect Weather conditions(heal, cold, rain, lightning)must also be considered <br /> ! Job0 3 Polen <br /> Mobilize with proper Gather necessary PPE Reflective vest for Vehicle accident Lifting • Follow safe driving-procedures <br /> SECOR Internattonal Incorporated 15 Genenc HASP <br />