My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS XR0002747
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
H
>
HARDING
>
16
>
3500 - Local Oversight Program
>
PR0508502
>
ARCHIVED REPORTS XR0002747
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/7/2018 9:17:06 AM
Creation date
11/6/2018 3:36:07 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
3500 - Local Oversight Program
File Section
ARCHIVED REPORTS
FileName_PostFix
XR0002747
RECORD_ID
PR0508502
PE
3526
FACILITY_ID
FA0008117
FACILITY_NAME
ARCO STATION #4932
STREET_NUMBER
16
Direction
E
STREET_NAME
HARDING
STREET_TYPE
WAY
City
STOCKTON
Zip
95204
APN
13902001
CURRENT_STATUS
01
SITE_LOCATION
16 E HARDING WAY
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
WNg
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
60
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Attachment 5 <br /> . UTILITY CLEARANCE LOGS <br /> Project <br /> Location Date <br /> Instructions This checklist has to be completed by a SECOR staff member as a safety measure <br /> to insure that all underground utility lines, other underground structures as well as above-ground <br /> power lines are clearly marked out in the area selected for boring or excavation DRILLING <br /> OR EXCAVATION WORK MAY NOT PROCEED UNTIL Cruz Bros. (fill in the name of <br /> the utility service) HAS BEEN CONTACTED, FACILITY OPERATORS HAVE <br /> LOCATED UTILITIES WITHIN THE FACILITY, UTILITIES AND STRUCTURES <br /> ARE MARKED, AND THIS CHECKLIST HAS BEEN COMPLETED As a final measure <br /> to prevent hitting buned utilities during drilling, field personnel must hand auger or post hole dig <br /> a five-foot hole at the potential drilling location before commencing drilling Alternate <br /> techniques such as vacuum excavation are acceptable provided they will not damage any boned <br /> utilities <br /> Assignment of Responsibility SECOR is responsible for having underground utilities and <br /> structures located and marked Preferably, the utility companies themselves should mark out the <br /> lines <br /> Drilling or Excavation Sites. Attach a map of the property showing the drilling or excavation <br /> sites, if sites are widely separated, several map(s) clearly indicating the area(s) checked for <br /> underground utilities or underground structures and the location of above-ground power lines <br /> Utilities and Structures <br /> TYPE PRESENT NT PRESENT HOW MARKED' <br /> Petroleum products line <br /> Natural izas line <br /> Steam line <br /> Water line <br /> Sewer line <br /> Storm drain <br /> Telephone cable <br /> Electric power line <br /> Product tank <br /> Septic tank/drain field <br /> Other <br /> Flags, paint on pavement, wooden stakes, etc <br /> Client Approval <br /> (with attached map) NAME COMPANY PHONE <br /> Name and affiliation of person who marked out underground lines or structures <br /> NAME COMPANY PHONE <br /> SECOR International Incorporated (SECOR) <br /> Field Team Leader Date Completed <br /> SECOR International Incorporated 25 Generic HASP 6-14-01 <br />
The URL can be used to link to this page
Your browser does not support the video tag.