Laserfiche WebLink
Attachment 5 <br /> . UTILITY CLEARANCE LOGS <br /> Project <br /> Location Date <br /> Instructions This checklist has to be completed by a SECOR staff member as a safety measure <br /> to insure that all underground utility lines, other underground structures as well as above-ground <br /> power lines are clearly marked out in the area selected for boring or excavation DRILLING <br /> OR EXCAVATION WORK MAY NOT PROCEED UNTIL Cruz Bros. (fill in the name of <br /> the utility service) HAS BEEN CONTACTED, FACILITY OPERATORS HAVE <br /> LOCATED UTILITIES WITHIN THE FACILITY, UTILITIES AND STRUCTURES <br /> ARE MARKED, AND THIS CHECKLIST HAS BEEN COMPLETED As a final measure <br /> to prevent hitting buned utilities during drilling, field personnel must hand auger or post hole dig <br /> a five-foot hole at the potential drilling location before commencing drilling Alternate <br /> techniques such as vacuum excavation are acceptable provided they will not damage any boned <br /> utilities <br /> Assignment of Responsibility SECOR is responsible for having underground utilities and <br /> structures located and marked Preferably, the utility companies themselves should mark out the <br /> lines <br /> Drilling or Excavation Sites. Attach a map of the property showing the drilling or excavation <br /> sites, if sites are widely separated, several map(s) clearly indicating the area(s) checked for <br /> underground utilities or underground structures and the location of above-ground power lines <br /> Utilities and Structures <br /> TYPE PRESENT NT PRESENT HOW MARKED' <br /> Petroleum products line <br /> Natural izas line <br /> Steam line <br /> Water line <br /> Sewer line <br /> Storm drain <br /> Telephone cable <br /> Electric power line <br /> Product tank <br /> Septic tank/drain field <br /> Other <br /> Flags, paint on pavement, wooden stakes, etc <br /> Client Approval <br /> (with attached map) NAME COMPANY PHONE <br /> Name and affiliation of person who marked out underground lines or structures <br /> NAME COMPANY PHONE <br /> SECOR International Incorporated (SECOR) <br /> Field Team Leader Date Completed <br /> SECOR International Incorporated 25 Generic HASP 6-14-01 <br />