Laserfiche WebLink
Attachment 6a <br /> SECOR <br /> Action Level Table For Chemical Monitoring <br /> (Add or delete contaminant from the following table as appropriate for the site) <br /> • The level for respirator use indicated below is that concentration at which a respirator must be put on. It does not require the,lob to <br /> stop The respirator is a tool to be used while determining why the exposure has reached that concentration. Take action to reduce <br /> the concentration by engineering controls such as water mist, spray foam,plastic cover, etc. <br /> • The level for work stoppage indicated below is that concentration at which work on the job must stop Determine why exposures <br /> have reached that concentration and how they can be reduced Site evacuation is not necessary at this level It does not mean that <br /> stopping operations should reduce the hkelthood that the concentration will continue to rise Implement engineering controls to <br /> reduce the concentration, then resume work. <br /> • These values can be modified with particular knowledge of contaminants and site conditions. Contact Director of Industrial Hygiene <br /> & Health and Safety, Philip Platcow to discuss (617)232-7355. <br /> CHEMICAL MONITORING TASK MONITORING LEVEL FOR <br /> (OR CLASS) EQUIPMENT FREQUENCY/ LEVEL FOR WORK <br /> LOCATION RESPIRATOR USE STOPPAGE <br /> Volatile Organic FID/PID as appropriate From start of 20 ppm above 50 ppm above <br /> Vapors for chetmproject <br /> cals of concern mobilization to Sampling shouldhile disturbing <br /> bing potentially continuous during the background sustained in background in <br /> project w <br /> Read manual to completion and breathing zone for 2 breathing zone and <br /> determine demobilization tacontaminateds andip soil or uncovering/removing ringddrilling <br /> tle mutes,and no benzene no vinyl chloride or <br /> tanks and piping,or during drilling At least and/or vinyl chloride benzene tube <br /> Draeger Tube for vinyl every 15 minutes m the breathing zone tube discoloration if a discoloration Stop <br /> chloride(model Va part Sample to at the exclusion zone boundaries color change appears on work if tube <br /> number 67 2803 1) every 30 minutes Continuously sample tube for benzene or vinyl indicates> I ppm <br /> during each soil and groundwater sampling chloride at 10ppm on for benzene or vinyl <br /> Draeger Tube for benzene interval If 10 ppm in breathing zone,collect FID/PID,don respirator chloride <br /> (model 0 5/a) a Draeger tube for benzene and/or vinyl <br /> chloride(depending upon contaminants of If no Draeger Tubes are If no Draeger Tube <br /> concern) available,the level for available,stop work <br /> respirator use will be at 25 ppm <br /> 5ppm <br /> SECOR International Incorporated 26 Genenc HASP 6-14 01 <br />