My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1996 - 2016
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
A
>
AUTO CENTER
>
3282
>
2200 - Hazardous Waste Program
>
PR0505926
>
COMPLIANCE INFO_1996 - 2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/5/2018 10:39:00 AM
Creation date
11/6/2018 8:36:51 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2200 - Hazardous Waste Program
File Section
COMPLIANCE INFO_1996 - 2016
FileName_PostFix
1996 - 2016
RECORD_ID
PR0505926
PE
2229
FACILITY_ID
FA0007087
FACILITY_NAME
BIG VALLEY FORD
STREET_NUMBER
3282
STREET_NAME
AUTO CENTER
STREET_TYPE
CIR
City
STOCKTON
Zip
95212
APN
12802025
CURRENT_STATUS
01
SITE_LOCATION
3282 AUTO CENTER CIR
P_LOCATION
01
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS3\222IAError\IAError\A\AUTO CENTER\3282\PR0505926\COMPLIANCE INFO PRE 2016.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
229
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Big Valley Ford Lincoln Mercury <br /> Hazardous Waste Inspection & Compliance Process <br /> Daily <br /> Every Business Day <br /> sa 12:00 Noon - Shop Foreman walks all shops/stalls and storage areas to visually <br /> inspect that all work and storage areas are in compliance. During this inspection he <br /> completes the "shop foreman" inspection report and submits it to Mike Baltzer for <br /> review and correction. If any specific employee infractions are found he completes <br /> an employee warning report in duplicate. One copy is to be kept with the daily <br /> inspection report and the other turned over to Mike Baltzer for counseling the <br /> employee with the appropriate department manager. Once any necessary employee <br /> counseling is completed the warning report is submitted to Darlene Gibbons for <br /> reference and filing in the appropriate employee file. <br /> ;s 4:30 pm - Designated compliance personnel begin the two hour process of <br /> inspecting all hazardous waste containers and clean out of satellite containers. <br /> Please refer to the "Hazardous Waste Daily Inspection and Clean Out Audit Report". <br /> Once this report is completed the report is placed on Mike Baltzer's desk for morning <br /> review and action. If necessary Mr. Baltzer completes an employee warning report in <br /> duplicate. One copy stays with the Audit report and the other is used for counseling <br /> the employee with the appropriate department manager. Once any necessary <br /> employee counseling is completed the warning report is submitted to Darlene <br /> Gibbons for reference andfiling in the appropriate employee file. <br /> Weekly <br /> Monday Mornings <br /> Hazardous Waste Pumping & Hauling Days <br /> Various times & dates <br /> sa On the dates that our waste is pumped and hauled away our compliance personnel <br /> will be pulled from retail jobs to shadow the hauler employees and verb that all <br /> materials are collected and that all labeling is replaced on long term replacement <br /> containers left by the hauler. <br /> i* A copy of the hauler record will be turned into Mike Baltzer for verification and <br /> manifests matching. <br />
The URL can be used to link to this page
Your browser does not support the video tag.