Laserfiche WebLink
h : <br /> January through August tear out, construction ofr <br /> temporary bridge, and construction of permanent <br /> concrete bridge. <br /> September through November full time clean up will <br /> continue until that years old bridge is completely <br /> cleaned up. <br /> (/JaCr f <br /> y Craft <br /> �cc: <br /> Art Ramirez <br /> P.O. Box 445 <br /> Tracy Ca. 95376-0445 <br /> G.D. Lake <br /> Region Manager Maintenance <br /> San Bernardino <br /> C.G. Armenta <br /> Supervisor Structures <br /> Fresno <br /> �rfef <br /> f <br /> .�y <br /> T� <br /> h. <br /> fa_ <br /> lel <br /> ;�Jf <br />