My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CENTER
>
916
>
2200 - Hazardous Waste Program
>
PR0220091
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/5/2018 10:43:28 AM
Creation date
11/6/2018 8:38:20 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2200 - Hazardous Waste Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0220091
PE
2228
FACILITY_ID
FA0002862
FACILITY_NAME
R V CIRCUITS INC
STREET_NUMBER
916
Direction
S
STREET_NAME
CENTER
STREET_TYPE
ST
City
STOCKTON
Zip
95206
APN
14714036
CURRENT_STATUS
02
SITE_LOCATION
916 S CENTER ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS3\222IAError\IAError\C\CENTER\916\PR0220091\COMPLIANCE INFO\COMPLIANCE INFO.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
900
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
To: Doug Wilson Public Health Services From:albert navarro 209 462-6501 9/12196 8:05:48 Page 1 of 3 <br /> ...i <br /> R.V. CIRCUITS <br /> PROJECT STATUS REPORT <br /> ESTIMATED COMPLETION SCHEDULE <br /> 9/11/96 <br /> ESTIMATED PROJECT COMPLETION : 30 DAYS <br /> Items necessary for complete removal of hazardous waste material and facility decontamination at <br /> R.V. Circuits Inc. located at 916 S. Center Street, Stockton CA 95206. <br /> ITEM <br /> #1. Final cleaning and decontamination of (5)tanks, which held concentrated hazardous <br /> liquid materials, these waste was recently shipped (9/10/96)off site for recycling <br /> purposes leaving behind settled hazardous semi-solid material (sludge). <br /> ESTIMATED CLEAN UP/DECONTAMINATION TIME; 5 Days <br /> ITEM <br /> 92. Final discharge of 3,800 Gallons (approx.)of treated water to city sewer. Currently <br /> awaiting City of Stockton Municipal Utility's Lab results. Sample collected/ <br /> submitted to M.U.D.on 9/3/96. Analytical results will determine the actual time <br /> necessary to complete this item. <br /> a). If results are positive I expect to discharge within 3-5 days of notice. <br /> b). If results come back negative, we will need to reprocessffnal filter this water <br /> and would have to resubmit new sample for final analysis to the City of Stockton. <br /> (My own preliminary lab results showed negative results, indicating the need for <br /> additional treatment, reprocessing/Final filtration). Note,tank is sealed per MUD. <br /> A. ESTIMATED DISCHARGE TIME (scheduling) 3-5 Days (actual discharge 3-4 hrs.) <br /> B. ESTIMATED REPROCESSING/FILTRATION 2-3 Days <br /> C. ESTIMATED ADDITIONAL LAB ANALYSIS 10 Days <br /> TOTAL 15-18 Days <br /> ITEM <br /> #3 Final surface concrete floor decontamination for plating and waste water area along with <br /> plating area wall decontamination. Sumps clean up and decontamination. <br /> ESTIMATED TIME TO COMPLETE FLOORSNVALL 2 Days (in process-80%complete) <br />
The URL can be used to link to this page
Your browser does not support the video tag.