Laserfiche WebLink
o. uougWilson PublicHealthServices From:albeit navarro 209 462-6501 9/12/96 8:06:34 Page 2 of 3 <br /> ITEM <br /> 94 Outside building parking lot soil contamination removal/remediation due to tank rapture <br /> and chemical/mix acid spill on 9/6/96 of approximate 50 gallons. ( Mostly absorbed by <br /> absorbent material used to contain spill). <br /> Scheduled <br /> a). Continuelcomplete exploratory excavation 2 Days 9/12/96 <br /> b). Collect/submit soils samples (chain/custody) 1 Day 9/13/96 <br /> c). Await for lab results(Typical turnaround 2weeks) 10 Days <br /> d). If lab results are positive, area can be filled with <br /> clean fill dirt and packed, 10-12 inches depth. 2 Days <br /> e). If lab results are negative, additional excavation <br /> work will need to be done, I do not expect this, since <br /> preliminary field soil analysis look positive at< 10 in. depth. <br /> TOTAL 15 Days <br /> ITEM <br /> #5 Final solid waste consolidation from heavy metal sludge, acidified absorbent and <br /> contaminated soil, plus any floor cleaning and miscellaneous solid waste to be shipped <br /> to 21st Century Environmental for final disposal.- FINAL HAZ. WASTE SHIPMENT <br /> ESTIMATED AT 4-5 CUBIC YARDS OF SOLID WASTE AT A COST OF$590.00 ea. <br /> ESTIMATED NECESSARY TIME TO PREPARE SOLID WASTE 20 Days <br /> TIME TO SCHEDULE FINAL PICK UP 5 Days <br /> TOTAL 25 Days <br /> I feel confident and capable of completing this project in a period of 30 Days. All items listed will <br /> be completed on time as estimated. Any questions and or concerns please call me at <br /> (209)546-9219. <br /> Sincerely <br />