My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CENTER
>
916
>
2200 - Hazardous Waste Program
>
PR0220091
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/5/2018 10:43:28 AM
Creation date
11/6/2018 8:38:20 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2200 - Hazardous Waste Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0220091
PE
2228
FACILITY_ID
FA0002862
FACILITY_NAME
R V CIRCUITS INC
STREET_NUMBER
916
Direction
S
STREET_NAME
CENTER
STREET_TYPE
ST
City
STOCKTON
Zip
95206
APN
14714036
CURRENT_STATUS
02
SITE_LOCATION
916 S CENTER ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS3\222IAError\IAError\C\CENTER\916\PR0220091\COMPLIANCE INFO\COMPLIANCE INFO.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
900
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
08 September 2000 <br />AGE -NC Project No. 97-0372 <br />Page 12 of 18 <br />Sample duplicates will be collected and analyzed as appropriate to ensure data validity. Two <br />co -located soil samples will be collected to check laboratory precision, one laboratory - <br />prepared travel blank will be utilized to detect cross -contamination of the VOC sample, and <br />an equipment blank will be prepared in the field to check, if necessary, for cross - <br />contamination resulting from inadequate decontamination procedures. <br />The site-specific health and safety plan will be reviewed in the field prior to initiation of field <br />work. <br />Field work will be conducted under the supervision of a California Registered Geologist <br />experienced with environmental investigations. <br />5.0. PROCEDURES <br />To complete the scope of work given above, the following tasks must be completed: <br />• Pre -Field Work Activities <br />• Soil Sampling <br />• Ground Water Sampling <br />• Laboratory Analysis of Selected Samples <br />• Report Preparation <br />5.1. PERMITTING AND PRE -FIELD WORK ACTIVITIES <br />Upon approval of this work plan by the DTSC, applicable site assessment permits will be obtained <br />from the PHS-EHD. Prior to mobilization, each soil probe location will be clearly marked and a <br />utility clearance obtained through Underground Service Alert. A site safety plan (SSP) prepared in <br />accordance with Occupational Safety and Health Guidance Manual for Hazardous Waste Site <br />Activities (National Institute for Occupational Safety and Health Administration, U.S. Coast Guard <br />and U.S. Environmental Protection Agency, 1985) is in Appendix B of this work plan. <br />5.2. SOIL SAMPLING <br />As stated above, AGE intends to advance the soil borings utilizing a truck -mounted Geoprobe 5400 <br />soil sampling machine in accessible areas and to advance soil borings utilizing a hand -auger in areas <br />Advanced Ge•Enviranmental, Inc <br />
The URL can be used to link to this page
Your browser does not support the video tag.