My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 1993-2002
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CLUFF
>
802
>
2200 - Hazardous Waste Program
>
PR0518043
>
COMPLIANCE INFO 1993-2002
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/30/2018 9:07:01 PM
Creation date
11/6/2018 8:38:58 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2200 - Hazardous Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
1993-2002
RECORD_ID
PR0518043
PE
2220
FACILITY_ID
FA0013664
FACILITY_NAME
PROGRESSIVE EQUIPMENT CO
STREET_NUMBER
802
Direction
N
STREET_NAME
CLUFF
City
LODI
Zip
95240
CURRENT_STATUS
02
SITE_LOCATION
802 N CLUFF
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
WNg
Supplemental fields
FilePath
\MIGRATIONS3\222IAError\IAError\C\CLUFF\802\NO PR\COMPLIANCE INFO\COMPLIANCE INFO.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
596
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
S-07-1997 12=56PM FROM ENGEO INC 510 838 7425 P- 2 <br /> DRAFT <br /> ENGEO GEOTECHNICAL AND ENVIRONMENTAL CONSULTANT5 <br /> I N C O R P O R A T E D MATERIALS TESTING <br /> Project No. <br /> 420.347 <br /> May 5, 1997 <br /> Mr Robert Fowler <br /> Frank C. Alegre Trucking Company,Inc. <br /> 5100 West State Route Hwy 12 <br /> Lodi, CA 95242 <br /> Subject. Former Trucking Facility <br /> 802 North Cluff <br /> Lodi,California <br /> DRAINAGE POND REMEDIATION WORK PLAN <br /> Dear Mr. Fowler: <br /> ENGEO Incorporated is pleased to present this work plan for soil remediation at the former drainage <br /> pond site, located on the subject property in Lodi, California (Figure 1). The proposed scope of <br /> services includes the following: <br /> • Excavation of petroleum impacted fill material within the former pond area <br /> • Segregation of inert materials from the fiU,where'feasib e <br /> • Field screening of soils for petroleum hydrocarbons using a photoionization detector <br /> • Recovery of confirmation soil samples from the base and sidewalls of the excavation. <br /> • Recovery of composite soil samples,if necessary, from the excavated soil stockpiles <br /> • Laboratory analysis of the discrete and composite soil samples. <br /> • Loading and transportation of the excavated material o the Forward,Inc disposal facility <br /> • Preparation of a final report documenting field and lab ratory work <br /> _� 4I10�a�j <br /> Health and Safety Plan <br /> A site-specific safety plan is provided as an attachment. The safety plan addresses physical and <br /> chemical hazards, identifies site personnel, and provides emergency response information. Based on <br /> 2401 Crow Canyon Road•5tute 200•5an Ramon,CA 94583.1545•(510)836.1600•Fax(510)838-7425 <br /> &mail.enptatfQengR -com•WWW:linp://s w.hwked.net/engeo <br />
The URL can be used to link to this page
Your browser does not support the video tag.