My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 1993-2002
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
C
>
CLUFF
>
802
>
2200 - Hazardous Waste Program
>
PR0518043
>
COMPLIANCE INFO 1993-2002
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/30/2018 9:07:01 PM
Creation date
11/6/2018 8:38:58 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2200 - Hazardous Waste Program
File Section
COMPLIANCE INFO
FileName_PostFix
1993-2002
RECORD_ID
PR0518043
PE
2220
FACILITY_ID
FA0013664
FACILITY_NAME
PROGRESSIVE EQUIPMENT CO
STREET_NUMBER
802
Direction
N
STREET_NAME
CLUFF
City
LODI
Zip
95240
CURRENT_STATUS
02
SITE_LOCATION
802 N CLUFF
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
WNg
Supplemental fields
FilePath
\MIGRATIONS3\222IAError\IAError\C\CLUFF\802\NO PR\COMPLIANCE INFO\COMPLIANCE INFO.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
596
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Date:3118196 Time:5:11:26 PM Page 3 of 3 <br /> 02/26/1996 11:50 005-03$-4FFF MICHAEL D PARREHT --0' PAGE 02 <br /> - TG 9-100503i-'_05�9 Fj A!+E . 00J%000 <br /> FEB 16 -36 17:37, FF"M <br /> LEVI NEP FRICKE <br /> gNff�S `.'tMU.iF(M!�.t A•a�U[O SO tl.TSTS <br /> Waste Determination i <br /> i <br /> i To determine the waste classification using designated level methodology, the envirorunahLdl <br /> attenuation factors (depth to water and char ristics of the vadose zone) and leachability Of the <br /> b waste material must be assessed. Based on d provided, the vadose zone at the Fink Landfill is <br /> 5 comprised of interbedded silt, clay, and sand intervals down to the saturated sediments at <br /> Approximately 40 to 45 feet below grade. Lsvine'Frlcke was not provided with an attenuation <br /> factor for the Fink Road landfill and we have, therefore, used 100 as the attenuation factor as a <br /> conservative value. <br /> The calculation for this determination is as t 6ws. <br /> Attenuation factor, multiplied times the war quality goal for the constituent of concern, divided <br /> by 10, divided by I(10. <br /> For barium the water quality Zoal is 1,000 p m, therefore the following equation determines the <br /> concentration of barium that the Fink Road ndfill can accept, if their attenuation factor is 100 <br /> 100x 1.000/10/1.000-10 ppm <br /> For copper, the water quality goal is 200 ppm. Therefore, the following equ ioR determines the <br /> concentration of copper that the Fink Road ndfill can accept. if their attenuation factor is 100 <br /> 100 x 200/10/1,000=2 ppm <br /> Based on the anah tical results of the three s mples of bottom ash in comparison to the designated <br /> level methodology, the bottom ash material s not considered a designated waste. <br /> If you have an,. quesnons or need any more information please call me or Maya Rappaport <br /> Sincerely <br /> V � <br /> Ron Ooloubo+v <br /> Senior Project Geologist <br /> enclosure <br /> cit J. Bcnlamt • LeBouet, Lamb 4 <br /> Peter And son - Anderson k Anderson <br /> 3 I <br /> w* TOTAL PFGE.003 +'*. <br /> III � <br />
The URL can be used to link to this page
Your browser does not support the video tag.