Laserfiche WebLink
• . LL w y <br /> S L:r`v.1y lit: <br /> MAY 0 2 2016 <br /> o state of California—California Environmental Protection Agency Department of Tonic Substances Control <br /> J <br /> TABLE 2: SPECIFIC WASTE STREAM INFORMATION DATE <br /> Complete and submit a separate Table 2 for each major hazardous waste stream and for each minor hazardous waste <br /> stream for which a source reduction.measure was selected. <br /> IDENTIFICATION <br /> d (19)NAME OF GENERATOR,FACILITY or BUSINESS (20)EPA ID NO. <br /> l/.'LI,,. e C 0 479098 736 <br /> L (21)HAZARDOUS WASTE STREAM DESCRIPTION <br /> � (22)CALIFORNIA WASTE CODE <br /> •'' V�CL�il CWC <br /> it (23)THIS HAZARDOUS WASTE IS(please check one): <br /> U _Processed onsite in a wastewater treatment unit for discharge to POTW or NPDES permit(Category A) <br /> XOther SB 14 hazardous waste(Category B) <br /> Extremely hazardous waste <br /> Wto ACCOMPLISHMENTS <br /> Yourf2M SB 14 Plan, Performance Report,or Compliance Checklist, has this information. <br /> (24)Provide.the following information for this waste stream: <br /> How much waste was generated in the 2006 Reporting Year? / 5 -1J pounds <br /> Describe the source reduction measure(s)implemented since <br /> 2006(add page if needed): (1`('� f t( 6.e I"I/tc-ir 1� Qr 1 <br /> Estimate when this source reduction measure was implemented: Month 2—" W year <br /> For this measure,what source reduction quantity was projected <br /> in the 2006 Plan: pounds per year <br /> Estimate the quantity of waste reduced annually by this measure <br /> since implementation: pounds per year <br /> (See Summary Progress Report publication or S6 14 Guidance Manual Chapter 6,to help estimate hazardous waste reduced.) <br /> o2Dl-/ PROJECTIONS <br /> Your 241111511SB 14 Plan or Compliance Checklist has this information. <br /> (25)Provide the following information for this waste stream: <br /> How much waste was generated in the 2010 Reporting Year? TI 7✓ pounds <br /> Describe the source reduction measure selected to be implemented <br /> By 2014: (Add page if needed.) <br /> Atl�tuld yervtc Ale r kta l <br /> Estimate when this source reduction measure will be implemented: month year <br /> What is the annual projected source reduction quantity identified <br /> in the 2010 Plan? pounds per year <br /> DTSC 1262(11114106) Page 2 of 2 <br /> 62 <br />