Laserfiche WebLink
r r <br /> L MpY 0 2 2016 <br /> o , <br /> Sta[e%f4j�,, <br /> Im,�y�rp��fe'.rnia Enviro�enlal Protection Agency Department of Toxic Substances Control <br /> vi -TABLE 2: SPECIFIC WASTE STREAM INFORMATION DATE <br /> It <br /> ELComplete and submit a separate Table 2 for each major hazardous waste stream and for each minor hazardous waste <br /> Estream for which a source reduction measure was selected. <br /> vj IDENTIFICATION <br /> 4. (19)N ME OF GENERATOR,FACILITY,or BUSINESS (20)EPA ID NO. <br /> (19) ME e +ec CAD DY&/ 7 (P <br /> i' (21)HAZARESOUS WASTE STREAM DESCRIPTION (22)CALIFORNIA WASTE CODE <br /> QJ <br /> 42fy C-Af/ CWC <br /> (23)THIS HAZARDOUS WASTE IS(please check one): <br /> it <br /> V _Processed onsite in a wastewater treatment unit for discharge to POTW or NP DES permit(Category A) <br /> Other SB 14 hazardous waste(Category B) <br /> Extremely hazardous waste <br /> acro ACCOMPLISHMENTS <br /> YOUt;-2BBEtSB 14 Plan,Performance Report,or Compliance Checklist,has this information. <br /> (24)Provide.the following information for this waste stream: <br /> How much waste was generated in the 2006 Reporting Year? l 3 y J pounds <br /> Describe She source reduction measure implemented since I <br /> 2006(add page if needed): Re— LOC <br /> Estimate when this source reduction measure was implemented: Month year <br /> For this measure,what source reduction quantitywas projected <br /> in the 2006 Plan: pounds per year <br /> Estimate the quantity of waste reduced annually by this measure <br /> since implementation: pounds per year <br /> (See Summary Progress Report publication or SB 14 Guidance Manual Chapter 6,to help estimate hazardous waste reduced.) <br /> Q'011PROJECTIONS <br /> Your B 14 Plan or Compliance Checklist has this information. <br /> (25)Provide the following information for this waste stream: 11 <br /> How much waste was generated in the 2010 Reporting Year? L pounds <br /> Describe the source reduction measure selected to be implemented <br /> By 2014: (Add page if needed.) <br /> Lti i p co d tA ct t <br /> Estimate when this source reduction measure will be implemented: j I I month year <br /> What is the annual projected source reduction quantity identified <br /> in the 2010 Plan? pounds per year <br /> DTSC 1262(11114106) Page 2 of 2 <br /> 62 <br />