Laserfiche WebLink
5 D See kent Miller, Letter dated 8/4/2005- YES SCCO to contract with electrical contractor to 10/28/2005 <br /> Gas Room Item No. 1 -Emergency power verify circuits Submit report <br /> shal be provided in lieu of standby power <br /> for: 5, Exhaust ventiiabon, including the 11/14/2005 <br /> po r supply for treabnent systems, b. Resolve any <br /> Gas detection systems, c. Emergency alarm deficiencies <br /> sysf ms, and d. temperature-control <br /> syst ms. CFC, Sec: 8003.3.1.4(Emergency <br /> Pa r) <br /> S D See ent Miller, Letter dated 8/4/2005- YES Provide plan to Kent Miller for approval 11/14/2005 <br /> Gas Room Item No. 2-Gas rooms shall be Submit Plan <br /> desi 7ned to: CFL; Sec. 8003.3.1.3.5 <br /> (Tre ilment Systems), a. Operate at a <br /> negi rfive pressure in relation to the <br /> surr,7undIng area, and b. Direct the exhaust <br /> vent iallon to and exhaust system <br /> • <br />