My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
I
>
INDUSTRIAL
>
1010
>
2200 - Hazardous Waste Program
>
PR0518741
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/5/2018 11:46:56 AM
Creation date
11/6/2018 8:39:33 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2200 - Hazardous Waste Program
File Section
COMPLIANCE INFO_PRE 2019
FileName_PostFix
PRE 2019
RECORD_ID
PR0518741
PE
2228
FACILITY_ID
FA0010456
FACILITY_NAME
THATCHER COMPANY OF CALIFORNIA INC
STREET_NUMBER
1010
STREET_NAME
INDUSTRIAL
STREET_TYPE
DR
City
STOCKTON
Zip
95206
APN
17728053
CURRENT_STATUS
01
SITE_LOCATION
1010 INDUSTRIAL DR
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS3\222IAError\IAError\I\INDUSTRIAL\1010\PR0518741\COMPLIANCE INFO 1999 - 2016.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
943
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
411 <br /> Page 2... <br /> #12 Continued: <br /> (d) Spill has been cleaned up and containerized <br /> (e) Oil stain cleaned up and containerized <br /> Control Room <br /> (a) Re: #10 (e) Complete <br /> (b) Cleaned up <br /> (c) Being monitored and cleaned up daily until pump is repaired. <br /> (d) Leaking product is put back into process (re: #10 (f) <br /> Treatment Area <br /> (a) Secondary containment is monitored and cleaned daily <br /> (b) Cleaned up <br /> (c) Administrative controls in process. Engineering control options being looked at. <br /> Hydrochloric Acid Packaging <br /> (a) Containment being monitored and cleaned up daily <br /> (b) See (a). Engineering and cost estimates for refurbishment in process <br /> #16 Eyewash Stations. Covers have been installed and inspection tags at each unit. <br /> #19 Removal of 5 gallon buckets. Ref: #10 (a) (h) (i) <br /> #20 Proper labels for 5 gallon buckets (sample provided). Richard has procured <br /> additional labels. <br /> #21 No lid on one 5 gallon bucket. Ref: #10 (a) (h) (i) <br /> #32 Used oil receipts for 3 years. Copies for recent activity attached. In process of <br /> researching in conjunction with vendor on previous activity. <br /> #39 Waste Analysis <br /> (a) DE sludge. In Process <br /> (b) Concrete Pipe. Attached Ref: #10 (k) <br /> #45 and #47 Complete <br /> #49 Hazardous Waste Training. Copy of Title 22 has been ordered. At least three <br /> individuals are scheduled in a Title 22 class to be held on October 10. <br /> No Number. Provide Process Flow Charts. In Process <br /> In closing I would like to mention that starting October 1, We have hired an additional <br /> person to work with me in Regulatory Compliance/Environmental. I can assure you that <br /> our top priority is to continue to work on these issues and work closely with the <br /> Stockton management in the development and implementation of a comprehensive <br /> Waste Management Program. <br />
The URL can be used to link to this page
Your browser does not support the video tag.