My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_PRE 2019
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
K
>
KELLY
>
214
>
2200 - Hazardous Waste Program
>
PR0517911
>
COMPLIANCE INFO_PRE 2019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/26/2024 2:41:56 PM
Creation date
11/6/2018 8:40:12 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2200 - Hazardous Waste Program
File Section
COMPLIANCE INFO_PRE 2019
FileName_PostFix
PRE 2019
RECORD_ID
PR0517911
PE
2227
FACILITY_ID
FA0010183
FACILITY_NAME
SPACERAK
STREET_NUMBER
214
Direction
S
STREET_NAME
KELLY
STREET_TYPE
ST
City
LODI
Zip
95240
APN
04906026
CURRENT_STATUS
01
SITE_LOCATION
214 S KELLY ST
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
WNg
Supplemental fields
FilePath
\MIGRATIONS3\222IAError\IAError\K\KELLY\214\PR0517911\COMPLIANCE 2000 - 2015.PDF
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
523
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Lodi Metal Tech, Inc. <br /> Chronology of Events <br /> Wastewater Release 8/24/2006 <br /> 08/25/06 14:40 <br /> The City of Lodi Public Works Department Permit issued an encroachment permit. Mr. <br /> Merrill returned with it to the Beckman Rd./E. Pine St. intersection. Ed Gomez, a City of <br /> Lodi employee, had just arrived on site and was setting up traffic diversion. At the Kelly <br /> SUE. Pine St. intersection, water flowing into the through the storm drain system into the <br /> sump, and water being pumped from the storm drain sump into the sewer were very clear. <br /> Therefore the access covers were replaced and the pumping operation was moved to the <br /> Beckman Rd./Pine St. intersection. <br /> 08/25/06 14:50 <br /> The storm drain system sump at the intersection of Beckman Rd. and E. Pine St. was <br /> pumped dry. <br /> 08/25/06 15:05 <br /> Flush water coming from LMT storm drain#8 began flowing into the storm drain sump <br /> at the Beckman Rd./E. Pine St. intersection. When the sump was almost full, it was <br /> pumped directly to the sanitary sewer system. This process was repeated several times. <br /> 08/25/06 16:00 <br /> Mr. Merrill and Jamie of Jim Thorpe Oil determine the water flowing into the sump was <br /> clean. Rather than rush the process, they continued to flush the storm drain system and <br /> pumped the sump two more times. <br /> 08/25/06 16:20 <br /> Mr. Merrill asked Mr. Ed Gomez of the City of Lodi to check the water clarity. Mr. <br /> Gomez agreed the water was indeed clean. The pumping was stopped, the hoses were <br /> removed, and access hatches are replaced. Traffic cones are picked up and all <br /> participants departed. <br /> 08/25/06 16:35 <br /> Mr. Merrill called Mr. George Bradley to inform him that the flushing and pumping <br /> process was complete. Mr. Bradley had already been told about the completion of the <br /> flushing and pumping process by Mr. Gomez. Mr. Bradley was satisfied that LMT had <br /> responded correctly to the situation. <br /> 08/25/06 16:50 <br /> Mr. Merrill called Raul Lomeli of the State Fish and Game Department and summarized <br /> the operation, again noting that none of the released wastewater had entered the Delta <br /> watershed. Mr. Lomeli thanked Mr. Merrill for his call and for following through with <br /> the clean up process. <br /> 6 of 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.