Laserfiche WebLink
IUR I *dN <br /> Mr.Kyung Park <br /> October 11,2009 <br /> Page 4 of 4 <br /> P.E.Certification Statement <br /> I certify under penalty of perjury that this document and all attachments were prepared under my direction <br /> or supervision in accordance with a system designed to assure that qualified personnel properly gather <br /> and evaluate the information submitted. Based on my inquiry of the person or persons who manage the <br /> system,the information submitted is,to the best of my knowledge and belief,true,accurate,and <br /> complete. I am aware that there are significant penalties for submitting false information, including the <br /> possibility of fines and imprisonment for knowing violations[22 CCR Section 66270.11(d)]. <br /> Sincerely, <br /> HDR I e'M a HDR company Qt IIEUS o, <br /> E <br /> w No.Q61268 z m <br /> Gregory P. Meyer Al Williamson, P.E. oc <br /> Senior Engineer Project Engineer/Manager Exp 6 `I <br /> CIV1x- <br /> Enclosure: Figure I—Site Plan <br /> Figure 2-500-gallon Waste Oil Tank - --- <br /> C: Walter H.Kim,HDR I e2M <br /> Project File <br /> HDR I erM om Cu.'a.r Lv..,r.�'�e,ro�: <br />