My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2002 - 2008
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
26 (STATE ROUTE 26)
>
18754
>
2300 - Underground Storage Tank Program
>
PR0507164
>
COMPLIANCE INFO_2002 - 2008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/20/2024 8:48:35 AM
Creation date
11/6/2018 9:27:42 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2002 - 2008
RECORD_ID
PR0507164
PE
2361
FACILITY_ID
FA0007722
FACILITY_NAME
ORLANDOS
STREET_NUMBER
18754
Direction
E
STREET_NAME
STATE ROUTE 26
City
LINDEN
Zip
95236
APN
10517048
CURRENT_STATUS
01
SITE_LOCATION
18754 E HWY 26
P_LOCATION
99
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\T\HWY 26\18754\PR0507164\COMPLIANCE INFO 2002 - 2008 .PDF
QuestysFileName
COMPLIANCE INFO 2002 - 2008
QuestysRecordDate
1/17/2017 5:26:41 PM
QuestysRecordID
3312375
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
207
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB, January 2002 <br />3. SECONDARY PIPE TESTING <br />Page — of <br />Test Method Developed By: ❑ Piping Manufacturer dttstty Standard ❑Professional Engineer <br />0 O�ter (Specify) <br />Test Method Used: Pressure ❑Vacuum 11 Hydrostatic <br />❑ Outer (Specify) <br />Test Equipment Used:Equipment Resolution <br />Piping Run # <br />PipingRun # ping Run # <br />Piping Run # <br />Piping Material: <br />Piping Manufacturer <br />I A(Art <br />1< <br />Piping Diameter: <br />1'' t <br />`L` ` <br />Length of Piping Run: <br />90, <br />Product Stored: <br />HT <br />I?/ <br />Method and location of <br />piping -run isolation: <br />j i i S" Ap <br />130C—) n✓,y,AApP % I I ���01,e <br />Wait time between applcing <br />pressure/cacuum/Avater and <br />starting test: <br />f G MIA <br />/0 .�: K 16t :�r-( <br />Test Start Time: <br />/000 <br />/001 j U r) v <br />initial Reading (R,): <br />PSi <br />05 <br />Test End Time: <br />000 <br />1160 ! O D <br />Final Reading(RgY <br />Test Duration: <br />, <br />h <br />Change in Reading (RF -R`): <br />et <br />Pass/Fad Threshold or <br />Criteria: <br />�y <br />Test Result: <br />Pass ❑ Fail <br />Pass ❑ Fad Wp4ass ❑ Fail 1 <br />tJ Pass ❑ Fail <br />COWMentS —(include information on repairs made prior to testing, and recommended follow-ap for failed tests) <br />
The URL can be used to link to this page
Your browser does not support the video tag.