Laserfiche WebLink
SWRCB, January 2002 <br />3. SECONDARY PIPE TESTING <br />Page — of <br />Test Method Developed By: ❑ Piping Manufacturer dttstty Standard ❑Professional Engineer <br />0 O�ter (Specify) <br />Test Method Used: Pressure ❑Vacuum 11 Hydrostatic <br />❑ Outer (Specify) <br />Test Equipment Used:Equipment Resolution <br />Piping Run # <br />PipingRun # ping Run # <br />Piping Run # <br />Piping Material: <br />Piping Manufacturer <br />I A(Art <br />1< <br />Piping Diameter: <br />1'' t <br />`L` ` <br />Length of Piping Run: <br />90, <br />Product Stored: <br />HT <br />I?/ <br />Method and location of <br />piping -run isolation: <br />j i i S" Ap <br />130C—) n✓,y,AApP % I I ���01,e <br />Wait time between applcing <br />pressure/cacuum/Avater and <br />starting test: <br />f G MIA <br />/0 .�: K 16t :�r-( <br />Test Start Time: <br />/000 <br />/001 j U r) v <br />initial Reading (R,): <br />PSi <br />05 <br />Test End Time: <br />000 <br />1160 ! O D <br />Final Reading(RgY <br />Test Duration: <br />, <br />h <br />Change in Reading (RF -R`): <br />et <br />Pass/Fad Threshold or <br />Criteria: <br />�y <br />Test Result: <br />Pass ❑ Fail <br />Pass ❑ Fad Wp4ass ❑ Fail 1 <br />tJ Pass ❑ Fail <br />COWMentS —(include information on repairs made prior to testing, and recommended follow-ap for failed tests) <br />