Laserfiche WebLink
SWRCB, January 2002 <br />0 i <br />6. PIPING SUMP TXSTING <br />Page _ of <br />'Test Method Developed By: 0 Sump Manufacturer fnndustry Standard D Professional Engineer <br />0 Other (Specify) <br />Test Method Used: 0 Pressure O Vacuum Hydrostatic <br />17 Other (Specify) <br />Test Equipment Used: <br />Equipment Resolution: <br />..Sump <br />" •.: _., <br />Sump <br />Sum # 1 �j, <br />#2 9 ! <br />Su mp # , _ ,, <br />Sump # <br />Sump Diameter: <br />W1 <br />L( Zt ` <br />Ll 'L <br />Sump Depth: <br />" <br />It <br />Sump Material: <br />Height front Tank Top to Top ofi <br />Highest Piping Penetration: <br />1, r <br />1 , t <br />f 2" <br />Height from Tank Top to Lowest <br />Electrical Penetration: <br />C� <br />Condition of sump prior to testing: <br />ng, <br />Portionof Sump Tested' <br />" <br />'L% <br />Does turbine shut down when// <br />sump sensor detects liquid (both <br />product and water)'? <br />Yes 0 N DNA <br />9N/es ONo DNA <br />❑Yes ONo ONA <br />❑Yes ONo DNA <br />Turbine shutdown response time <br />1 <br />1s system programmed for fail-safe <br />shutdown?' <br />es 0 No DNA <br />,/ <br />t9'Yes ONo DNA <br />es ONo DNA <br />0 Yes O No 0 NA <br />Was fail-safe verified to be <br />orational?" <br />0 Yes o DNA <br />O Yes No DNA <br />�/ <br />❑Yes E7 o O NA <br />D Yes ONo [INA <br />Wait time between applying <br />pressure/vacuum/water and starting <br />test: <br />0 ✓tt `N <br />[ f3 vl l! <br />Test Stan Time: <br />jn 7o <br />Q �U <br />initial Rmdmg (Ril: <br />5'! • <br />22 <br />2 <br />Test End Time: <br />14 745) <br />l 30 <br />0 <br />Final Reading (Rn): <br />z3r ire <br />)S, <br />Test Duration: <br />h <br />Change in Reading (R„Ru): <br />– �– <br />Pass/Fad Threshold or Criteria: <br />70— <br />Test Result: <br />Ofass D Fail <br />ass O Fail <br />RIPASS 0 Fail <br />0 Pass 0 Fail <br />Was sensor removed for testing? <br />Yes ONo ONA// <br />es ONo DNA <br />es ONo DNA <br />Dyes ONO ONA <br />Was sensor properly replaced aud <br />verified timetionai after testing'' <br />yes ONo DNA <br />1RYes ONo DNA <br />ta'Yes ONo CNA <br />❑Yes ONo LINA <br />Comments– (include information on repairs made prior to testing and recomrnendedfollow-up for failed tests) <br />' If the entire depth of the sump is not tested, specify how much was tested. R the answer to any of the questions indicated with an <br />asterisk(*) is "NO” or "NA'; the entire sump must be tested. (See SWRCB LG -160) <br />