Laserfiche WebLink
a <br />F_I <br />SJCEHD-d (07/03)- 114 uncarw <br />SAN JOAQUIN COUNTY ENVIRONMENTAL HEALTH DEPARTMENT <br />UNDERGROUND STORAGE TANK <br />MONITORING PLAN - PAGE 1 <br />MOt. <br />TYPE OF ACTION I. NEW PLAN ❑ 2 CHANGE OF INFORMATION <br />Mm <br />PLAN TYPE MONITORING IS IDENTICAL FOR ALL USTs AT THIS FACILITY. <br />(Check ane item only) ❑ TRIS PLAN COVERS ONLY THE FOLLOWING UST SYSTEM(S): <br />I. FACILITY INFORMATION <br />FACILITY ID # (Agency Use Only) "'=d <br />Mm. <br />FAC[LITYNAME 0 M N 5 <br />MOS. <br />` CITY <br />FACILITY STPE ADDRESS S tZ 4 1l0.) Mw s <br />II, Q NT TESTING AND PREtrJK-NT MA TENANCE <br />Slate -law that testing. Pro%entive maintenance, and calibration or monitoring egwpmeat (e.g., sensors, probes, Ime kali detectors, etc.) be performed in <br />Such be by qualified personnel. <br />Ma: <br />accordance with the equipment manufaetmers' instructions, or annuallyy`ehieheeer a more frequent. work most performed <br />1107 <br />MONITORING EQUIPMENT IS SERVICED �1. ANNUALLY ❑ 99. OTHER (Specif)): <br />. MC�IiIORTNG LOCA<)�1S <br />This mnmtorma plan must include a Site Plan showing the general tank and piping la)'omt and the locations where monitoring is performed (i.e., location of each seasoy <br />UST Monitoring Site Plan from a Monitoring Systern Certification <br />line Irak detector. monitoring system control panel, etc.). If you already have a diagram (c.e.. current <br />Ian. <br />form. hazardous Materials Business Plan map. etc.) which shows all fired information. include it with this <br />IV. TANKMONITORING <br />MOt TrORING IS PERFORMED USING THE FOLLOWING METHOD(S): (Cbeck all that appty) <br />❑ 1. CONTINUOUS ELECTRONIC MONITORING OF TANK ANNULAR (INTERSTITIAL) SPACE(S) OR SECONDARY CONTAINMENT VAULTS) <br />Mlt <br />SECONDARY CONTAINMENT 7 DRx ❑ b. LIQUID FILLED ❑ - (16IDER PRESSURE ❑ d. UNDER VACUUM <br />,,a/. <br />PANEL MANUFACTURER: � P(' cA I.fkiT Ins MODEL #: "n S 3_5V <br />Mu. <br />Mls. <br />LEAK SENSOR MANUFACTURER: ,r n.Alh1 MODEL #(S): L17 Z.DOO <br />❑ 2. AUTOMATIC TANK GAUGING (ATG) SYSTEM USED TO MONITOR SINGLE WALLTAN➢Ca5) <br />Mtz <br />PANEL MANUFACTURER: MODEL #: <br />M19. <br />MIs. MODEL #(S); <br />IN -TANK PROBE MANUFACTURER: <br />M2o. <br />LEAK TEST FREQUENCY: {y�'`�` CONTINUOUS ❑ b. DAILY/NIGHTLY E] c. WEEKLY <br />❑ d. MONTHLY ❑ e. OTHER (Spemfy): M21. <br />M22. <br />PROGRAbhM[IED TESTS: a. 0.1 g.p.h. El b. 02h [I¢.p.a OTHER (Specify):❑ <br />MN3 <br />M1° <br />3. INVENTORY RECONCILIATION ❑ a. MANUAL PER ti CCR §2646 in L. STATISTICAL PER 23 CCR §2646-1 <br />❑ 4. WEEKLY MANUAL TANK GAUGING (MTG) PER 23 CCR §2645 <br />M 5 <br />TESTING PERIOD: ❑ a. 36 HOURS ❑ b. 60 HOURS <br />❑ 5. INTEGRITY TESTING PER 23 CCR §2643.1���(�/ ( M26. <br />M21. <br />TEST FREQUENCY: ❑ a. ANNUALLY ❑ b. BIENNIALLY 11c. OTHER (Specify): <br />❑ 6.VISUAL MONITORING DONE: [Xa.DAILY ❑ b- WEEKLY Ot�mo.amyawwaU <br />Mza. <br />❑ 99. OTHER (Speeify): <br />MONITORING IS PERFORMED USING THE FOLLOWING METHOD(S) (Check all that apply) <br />j4 L CONTINUOUS ELECTRONIC MONITORING OF PIPING SUMP(SyTRENCH(ES) AND OTHER SECONDARY CONTAINMENT <br />FHLED ❑ c. UNDER PRESSURE ❑ d. UNDER VACUUM <br />/ SECONDARY CONTAINMENT I�Sp: �' a.DRY� ❑ b. LIVACUUMVACUUMM" <br />� '^ <br />- PANEL MANUFACTURER: \t 90'DZ MilMODEL #: ^:7!1 c � zce <br />W1. <br />LEAK SENSOR MANUFACTURER: VPYiWi/ 9061 Mia' MODEL #(S): LpZOou <br />ams. <br />WILL A PIPING LEAK ALARM TRIGGER AUTOMATIC PUM]a (Le., TURBINE) SHUTDOWN? a. YES ❑ b. NO <br />Mia' <br />WILL FAILURE/DISCONNECTION OF THE MONITORING SYSTEM TRIGGER AUTOMATIC PUMP SHUTDOWN? �La. YES ❑ b. NO <br />Ma'' <br />2. MECHANICAL LINE LEAK DETECTOR (MLLD) THAT ROUTINELY PERFORMS 3.0 g.p.h. LEAK TESTS AND RESTRICTS OR SHUTS <br />OFF <br />PRODUCT FLOW WHEN A LEAK IS DETEC�T�EDs,, 1j �,�, <br />M33' <br />M39 <br />MLLD MANUFACTURER(s): QCs' oAktSS <br />❑ 3. ELECTRONIC LINE LEAK DETECTOR (ELLD) THAT ROUTINELY PERFORMS 3.0 g.p.h. LEAK TEST'S <br />ss - .e... _.S Mao. MODEL#: <br />ELLD MANUFACTURER: b•rs�rv.�u-�- <br />M41. <br />M42. <br />PROGRAMMED LINE INTEGRITY TESTS: ❑ a. MINRMIiM MONTHLY 01 gp.h. ❑ b. MINIMUM ANNUAL 0.1 g.p.h. <br />WILL ELLD DETECTION OF A PIPING LEAK TRIGGER AUTOMATIC PUMP SHUTDOWN? &14- YES ❑ b. NO <br />M43. <br />WILL ELLD FAHLURE/DISCONNECTION TRIGGER AUTOMATIC PUIv1P SHUTDOWN? jka. YES ❑ b. NO <br />Mu. <br />❑ 4. INTEGRITY TESTING <br />a, Mas. <br />Mab. <br />TEST FREQUENCY: ❑. s. ANNUALLY ❑ b. EVERY 3 YEARS ❑ e. OTHER (Specify) W: <br />❑ i.VISUAL MONITORING DONE: a. DAILY ❑ b. WEEKLY' ❑ c. MLN. MONTHLY fi EACH TIME SYSTEM OPERATED'" <br />•pegory apmy approval -AOovMf mwiiotirigafmbmiebumd d emnBwTBaenrorihd PPeB e^tY err HSC §2a281.5@x3) <br />Mn. <br />❑ 6. PIPING IS SUCTION PIPING MEETING ALI, REQUIREMENTS FOR EXEMPTION FROM MONITORING PER 23 CCR §2636(ax3) <br />❑ 7. NO PRODUCT OR REMOTE FILL PIPING IS CONNECTED TO THE UST(s) <br />Mas. <br />❑ 99. OTHER (Specify) <br />SJCEHD-d (07/03)- 114 uncarw <br />