Laserfiche WebLink
• <br />SAN JOAQUIN COUNTY ENVIRONMENTAL HEALTH DEPARTMENT <br />UNDERGROUND STORAGE TANK <br />MONITORING PLAN - PAGE 1 <br />TYPE OF ACTION 1. NEW PLAN ❑ 2. CHANGE OF INFORMATION <br />Mol_ <br />PLAN TYPE MONITORING IS IDENTICAI. FOR ALL USTs AT IT 11 FACILITY. <br />M02_ <br />(Check one item mdy) ❑ TI [IS PLAN COVERS ONLY 'I111: FOLLOWING US I S}Sl EM(S). <br />I. FACILITY INFORMATION <br />FACILITY ID a (.1g,nn Cis, Oniv) <br />FACILITY NAME1 A IS <br />Mm' <br />FACILITY SITE ADDRESS S' N �w Moa. <br />CITY v <br />Mas. <br />Q. EQUIPMENT TESTING AND PREVENTIVE MAINTENANCE <br />Slate law requires that testing, preventive maintenance. and calibration of monitoring equipment (e.g., sensors, probes, line leak detectors, etc.) be performed in <br />Mo6. <br />accordance with the equipment manufacturers' instructions, or annuallywhicheva is more frequent. Such work must be performed by qualified personnel. <br />MONITORING EQUIPMENT IS SERVICED L ANNUALLY [1 99. OTHER (Specify): <br />Mm' <br />III. MONITORING LOCATIONS <br />'Phis monitoring plan must include a Site Plan showing the general tank and piping ]scouts and the locations where monitoring is peilbnncd (i. c., location of cacti sensor. <br />line Teak detector, monitoring system control panel, eta). If you alrcadv have a diaeram N g., corcnt CS'I Monitoring Site Plan li'om a Monitoring Svslcm Certification <br />form, Hazardous Materials Business Plan map, etc) which shows all le uircd inlbnnm lion, include it will this elan. <br />IV. TANK MONITORING <br />MONITORING IS PERFORMED USING THE FOLLOSAING MEIHOD(S): (Check all that appl)9 <br />v°o. <br />❑ L CONTINUOUS ELECTRONIC MONITORING OF TANK ANNULAR (INTERSTITIAL) SPACE(S) OR SECONDARY CONTAINMENT VAULT(S) <br />SECONDARY CONTAINMENT I$: a.. DR/yI El b. LIQUID FILLED [I c. UNDER PRESSURE El d. UNDER VACUUM <br />MTI' <br />PANEL MANUFACTURER: PP GY V -Our "nS X50 M12 MODEL 4: TLS 3-sy <br />M15_ <br />LEAK SENSOR MANUFACTURER: M U09LE55 MIA_ MODEL #(S): _LE2 7,060 <br />M15. <br />El2. AUTOMATIC TANK GAUGING (ATG) SYSTEM USED TO MONITOR SINGLE WALL TANK(5) <br />PANEL MANUFACTURER: M16_ MODEL#: <br />1,417. <br />IN -TANK PROBE MANUFACTURER: MIs. MODEL#(S): <br />M19, <br />LEAK TEST FREQUENCY:I��^a. CONTINUOUS El b. DAILYMIGHTLY ❑ c. 11'E EKLY <br />MLl <br />LJ d. NION'LILY ❑ e. OTHER (Specify): M`21' <br />PROGRAMMED TESTS: ❑ a. 0.1 g.p.h. ❑ It. 0.2 g.p.h. ❑ c. OTHER (Specify): M22. <br />M23. <br />❑ 3. INVENTORY RECONCILIATION ❑ a. MANUAL PER 23 CCR §2646 -h. STATISTICAL PER 23 CCR §2646.1 <br />M24. <br />❑ 4. WEEKLY MANUAL TANK GAUGING (MIG) PER 23 CCR §2645 <br />TESTING PERIOD: ❑ a. 36 HOURS ❑ Is 60 HOURS. <br />M25' <br />❑ 5. INTEGRITY TESTING PER 23 CCR §2643.1 <br />TEST FREQUENCY: ❑ a. ANNUALLY ❑ b. BIENNIALLY ❑ c. OTHER (Specify): Mea <br />M21. <br />❑ 6,VISUAL MONITORING DONE: Lxa. DAILY ❑ b. WEEKLY(Ra3Wreea,oneyappmva0 <br />❑ 99. OTHER (Specify): - <br />M28. <br />m'F • _ , V. PIPE MONITORING <br />MONITORING IS PERFORMED USING THE FOLLO WING METHODS) (Check all that apply) <br />Mao <br />1. CONTINUOUS ELECTRONIC MONITORING OF PIPING SUMP(SYTRENCH(ES) AND OTHER SECONDARY CONTAINMENT <br />SECONDARYCONTAINMENTIS: E4 a. DRY ❑ b. LIQUID FILLED ❑ c. UNDER PRESSURE El d, UNDER VACUUM <br />M31' <br />MJ2. MODEL #: 7!I Sf .�� -T�O� <br />PANEL MANUFACTURER: g �Pe^�---1^cen <br />M53' <br />7C� <br />LEAK SENSOR MANUFACTURER: V CJl'&A `KOO� Mad' MODEL #(S): �+'PYOop <br />M25. <br />WILL APIPING LEAK ALARM TRIGGER AUTOMATIC PUMP (i.e, TURBINE) SHUTDOWN? 19 a. YES ❑ Is NO <br />M36. <br />g/� WILL FAILURE/DISCONNECTION OF THE MONITORING SYSTEM TRIGGER AUTOMATIC PUMP SHUTDOWN? �La. YES [1b. NO <br />MECHANICAL LINE LEAK DETECTOR (MULL) THAT ROUTINELY PERFORMS 3.0 g.p.h. LEAK TESTS AND RESTRICTS OR SHUTS <br />M37."12. <br />OFF <br />PRODUCT FLOW WHEN A LEAK IS DETECTED �a � <br />M38. �, <br />M39, <br />MLLD MANUFACTURER(s): U'6IPo(2.,LP.SS MODEL#(S): LC/Aa <br />❑ 3. ELECTRONIC LINE LEAK DETECTOR (ELLD) THAT ROI!TIMELY PERFORMS 3.0 g.p.b. LEAK TESTS <br />ELLD MANUFACTURER:�"tF95 Moo. MODEL#: '6� <br />M41. <br />PROGRAMMED LINE INTEGRITY TESTS: ❑ a. MINIMUM MONTHLY 0.2 g.p.h. ❑ b. MINIMUM ANNUAL 0.1 g.p.h. <br />M42. <br />WILL ELLD DETECTION OF A PIPING LEAK TRIGGER AUTOMATIC PUMP SHUTDOWN? &-3. YES ❑ Is NO <br />M41. <br />WILL ELLD FAILUIRE/DISCONNECTION TRIGGER AUTOMATIC PUMP SHUTDOWN? PZ a. YES ❑ Is NO <br />M94' <br />❑ 4. INTEGRITY TESTING <br />TEST FREQUENCY: ❑, a. ANNUALLY ❑ b. EVERY 3 YEARS ❑ c. OTHER (Specify) Q(4, M45. <br />M46. <br />❑ 5.VISUAL MONITORING DONE: a. DAILY ❑ b. WEEKLY- ❑ c. MM. MONTHLY & EACH TIME SYSTEM OPERATED-- <br />MV. <br />• notion. W., approval •• Allowed fw montibnng ofunbuned emwgmcy goaeralor toot piping only W HSC 925281.5(b)(3) <br />❑ 6. PIPING IS SUCTION PIPING MEETING ALL REQUIREMENTS FOR EXEMPTION FROM MONITORING PER 23 CCR §2636(aN3) <br />❑ 7. NO PRODUCT OR REMOTE FILL PIPING IS CONNECTED TO THE UST(s) <br />❑ 99. OTHER (Specify) <br />Moa <br />SJCEHD-d (07/03) - 1/4 <br />07/33/03 <br />