My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REMOVAL_1997
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
TAM O SHANTER
>
7701
>
2300 - Underground Storage Tank Program
>
PR0231863
>
REMOVAL_1997
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/21/2024 1:48:43 PM
Creation date
11/6/2018 9:48:23 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
REMOVAL
FileName_PostFix
1997
RECORD_ID
PR0231863
PE
2361
FACILITY_ID
FA0004050
FACILITY_NAME
U-Haul Moving & Storage at Hammertown
STREET_NUMBER
7701
STREET_NAME
TAM O SHANTER
City
STOCKTON
Zip
95210
APN
094-030-24
CURRENT_STATUS
02
SITE_LOCATION
7701 TAM O SHANTER
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\wng
Supplemental fields
FilePath
\MIGRATIONS\T\TAM O'SHANTER\7701\PR0231863\REMOVAL 1997 .PDF
QuestysFileName
REMOVAL 1997
QuestysRecordDate
8/18/2017 5:18:49 PM
QuestysRecordID
3591501
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
94
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
U-Haul <br /> Facility Number 761-2-3, - <br /> S�vc"n ., California <br /> HEALTH AND SAFETY PLAN <br /> Page 2 <br /> SITE SPECIFIC HEALTH AND SAFETY PLAN <br /> UNDERGROUND STORAGE TANK REMOVAL ACTIVITIES <br /> U-HAUL/AMERCO REAL ESTATE <br /> Facility Number 704-23,111 'Ti 4 w- <br /> 5-rck.:6 e_, California <br /> SECTION 1.0 <br /> 1.1 INTRODUCTION <br /> This Health and Safety Plan, prepared by H.B. Covey, Inc. (HBC) describes the basic safety <br /> requirements for performing underground storage tank (UST) removals and soil and water <br /> sampling at the U-HaullAmerco Deal Estate (U-Haul) Facility Number 7LYi 2:3 located at-r-7s 1 <br /> T r.,. ©`Skr, I#,-�_,&t S-IrvA�A,, Califomia. <br /> The scope of work for this project includes the removal and disposal of one b,000-gallon <br /> gasoline tank and one 11" tank. Both the waste oil and gasoline tanks are of fiberglass <br /> construction. Tank appurtenances include dispensers, piping, electrical controls, and vent piping. <br /> Site operations will include sawcutting, removal of electrical connections and system <br /> appurtenances, concrete removal, excavation, tank rinsing, soil sampling, tank removal, <br /> backfilling, resurfacing, tank and soil disposal. <br /> The facility is surrounded by a chain link fence that is locked during non-business hours to <br /> prohibit public access. <br /> The provisions herein will apply to the employees of HBC, U-Haul and any subcontractor <br /> working at a subject site. The subcontractors may elect to modify these provisions, but only to <br /> upgrade or increase the safety requirements, and only then with written approval from HBC's <br /> Senior Safety Officer. <br /> This Health and Safety Plan addresses the potential hazards that may arise from performing the <br /> work and from interactions with U-Haul employees at this site and the emergency response <br /> community. In response to changing conditions at the site, HBC will modify the Health and <br /> Safety Plan, to meet new requirements. <br />
The URL can be used to link to this page
Your browser does not support the video tag.