My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REMOVAL_1997
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
TAM O SHANTER
>
7701
>
2300 - Underground Storage Tank Program
>
PR0231863
>
REMOVAL_1997
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/21/2024 1:48:43 PM
Creation date
11/6/2018 9:48:23 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
REMOVAL
FileName_PostFix
1997
RECORD_ID
PR0231863
PE
2361
FACILITY_ID
FA0004050
FACILITY_NAME
U-Haul Moving & Storage at Hammertown
STREET_NUMBER
7701
STREET_NAME
TAM O SHANTER
City
STOCKTON
Zip
95210
APN
094-030-24
CURRENT_STATUS
02
SITE_LOCATION
7701 TAM O SHANTER
P_LOCATION
01
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\wng
Supplemental fields
FilePath
\MIGRATIONS\T\TAM O'SHANTER\7701\PR0231863\REMOVAL 1997 .PDF
QuestysFileName
REMOVAL 1997
QuestysRecordDate
8/18/2017 5:18:49 PM
QuestysRecordID
3591501
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
94
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
.0-Haul _ <br /> Facility Number 71yrt z3 <br /> California <br /> HEALTH AND SAFETY PLAN <br /> Page 9 <br /> 4.4 SAFETY TRAINING <br /> A. All HBC employees employed in environmental assessment and remediation activities <br /> will have completed 40-hour health and safety training for hazardous site workers, and <br /> required refresher courses, as mandated by Federal OSHA 29 CFR 1910 requirements. <br /> B. Site workers will be required to attend site-specific briefings relating to the operations <br /> and materials to be encountered during the project. These briefings will be conducted by <br /> the Site Safety Officer and may include practical instruction regarding the hazards to be <br /> expected, and protective and preventive measures to be utilized. <br /> C. Employees will be required to have instruction in the use of fire extinguishers and fire <br /> prevention procedures. Included in this training will be: <br /> 1. Names of employees and alternates responsible for safety and health; <br /> 2. Acute and chronic effects of exposure to hazardous substances at the site; <br /> 3. OSHA rights and responsibilities; <br /> 4. Monitoring procedures; <br /> 5. Operating procedures; <br /> b. Personal Protective Equipment; <br /> 7. Decontamination; and, <br /> 8. Emergency Procedures. <br /> D. All subcontractor personnel involved in the project will be required to complete similar <br /> training and to attend all site-specific safety briefings. <br /> E. Specific training methods will stress the need for personal hygiene and decontamination <br /> procedures, use of the "Buddy System" and personal protective equipment. <br /> SECTION >.0 <br />
The URL can be used to link to this page
Your browser does not support the video tag.