CLIENT: <br /> At NOTES: UST ANCHORING bp <br /> WHEN WORKING BELOW GRADE, EXTREME CARE MUST BE TAKEN TO ASSURE 1" <br /> 1� WORKMEN SAFETY. SLOPING AND SHORING SHALL BE PROVIDED TO COMPLY <br /> WITH OSHA CONSTRUCTION INDUSTRY STANDARDS 29 CFR PART 1926 sa , <br /> SUBPART P, OSHA STANDARDS-EXCAVATIONS: FINAL RULE OCTOBER 1, 1989. <br /> HARDHATS SHALL BE WORN BY ALL WORKMEN OPERATING IN EXCAVATION OR <br /> WHERE OVERHEAD WORK IS PROGRESSING. <br /> A22TANK ANCHORING REQUIRED WHEN A HIGH WATER TABLE IS ENCOUNTERED OR <br /> IS REQUIRED BY LOCAL REGULATION. CONSULT WITH OWNER'S <br /> REPRESENTATIVE. <br /> AINSTALL DEADMAN ANCHORS PER TANK MANUFACTURERS INSTALLATION <br /> INSTRUCTIONS, <br /> DIMENSIONS OF MANUFACTURER SUPPLIED DEADMAN FOR 10' DIA. 25,000 GAL. <br /> TANK ARE 18"x8-3/4"x18'L, QTY: (6) EACH TANK. DIMENSIONS OF DEADMAN <br /> FOR 10' DIA. 20,000 GAL. TANK ARE 18"x8-3 4"xl8'L, QTY: 4 EACH TANK, <br /> TOTAL LENGTH OF FIELD CONSTRUCTED DEADMAN IS MIN, 12" GREATER THAN <br /> OVERALL LENGTH OF TANK. <br /> EACH TANK REQUIRES DEADMAN ON EACH SIDE. <br /> HOLD DOWN STRAPS ARE REQUIRED FOR 10,000, 12,000, 20,000, & 25,000 <br /> GALLON TANKS AS SPECIFIED AND SUPPLIED BY TANK MANUFACTURER. ARCO <br /> 88 LOCATE STRAPS ON RIBS WHERE INDICATED ON TANK. <br /> gQFASTEN WIRE WITH AT LEAST THREE CLAMPS AROUND DEADMAN AND BP WEST COAST PRODUCTS,LLC <br /> THROUGH THE END POINT OF THE HOLD DOWN STRAP. CLAMPS SHALL BE <br /> ALTERNATED 180' FROM EACH OTHER. <br /> ATTACH ALL HOLD DOWN STRAPS TO CABLE USING TURNBUCKLES. UNIFORMLY <br /> A10 TIGHTEN ALL STRAPS TO ACHIEVE EQUAL TENSION WITHOUT TANK DEFLECTION. f� <br /> MEASURE TANK DIAMETER BEFORE AND AFTER TIGHTENING STRAPS TO <br /> ENSURE NO TANK DEFLECTION. <br /> 11 WIRE ROPE MINIMUM DIAMETER 1/2". W 2 <br /> 12 TURNBUCKLES: HOOK TYPE - 1-1/4" DIAMETER, JAW TYPE - 3/4" <br /> A m <br /> DIAMETER, EYE TYPE - 3/4" DIAMETER O U <br /> COAT ALL EXPOSED STRAPS, CABLES, TURNBUCKLES, AND REINFORCING BARS <br /> 2 2 <br /> 13 WITH PITCHMASTIC. sGC may' <br /> 14 INSTALL LISTS SO THAT TOP OF TANKS ARE AT SAME HEIGHT. TANG ENGVN<_ <br /> 15 IN UNSTABLE SOIL (AS DEFINED BY SOILS REPORT) THE DIMENSION MUST BE <br /> 4 FT. FROM BOTH SIDES AND ENDS (WITH FIBERGLASS TANKS) 18215 72ND AVENUE SOUTH <br /> FILTER FABRIC (DUPONT TYPAR OR MIRAFI 500X) IS REQUIRED FOR WET HOLE KENT, WA 98032 <br /> 1B INSTALLATIONS ONLY. FABRIC MUST EXTEND TO SLAB AND MAY BE PINNED TO (425)251-6222 <br /> SIDE OF HOLE WITH WIRE, ETC. SEAMS MUST BE LAPPED 1' MINIMUM. (425)251-8782 FAX <br /> CIVIL ENGINEERING, LAND PLANNING, <br /> SURVEYING, ENVIRONMENTAL SERVICES <br /> NO, DATE REVISION DESCRIPTION <br /> 1 9-6-16 PERMIT SUBMITTAL <br /> 2 12-14-16 PERMIT RESUBMITTAL <br /> 3 1-31-17 PERMIT RESUBMITTAL <br /> ® NOTES: UST INSTALLATION -1B-16-17 <br /> 4 a-i6— coNslRucnoN RELEASE <br /> 11-14-17 REV, FOR CONSTRUCTION <br /> OO Q SLOPE CONCRETE AWAY FROM ALL MANHOLES 1" RISE OVER 12" RUN. NOT USED. -- <br /> LAYOUT TANKS & STAGE II VAPOR RECOVERY PIPING SUCH THAT THE STAGE II Q <br /> FIBER REINFORCEMENT TO BE USED. PREMIX UNIFORMLY THROUGHOUT 9OO PIPING DRAINS & ENTERS INTO REGULAR UNLEADED TANK FIRST W 3" e CONCRETE. CONNECTIONS, AND CONTINUES 3" TO OTHER TANKS. / <br /> OREINFORCING BARS TO BE NO LESS THAN 2" AND NO MORE THAN 4" 10 BALL VALVE ON MANIFOLD LINE TO REMAIN OPEN DURING NORMAL OPERATION. <br /> 3 FROM SURFACE. <br /> 11 <br /> OREINFORCE CONCRETE SLAB AROUND MANHOLE WITH (4) #4 REBAR 60" NOT USED. <br /> IN LENGTH, PLACE REBAR 6" FROM SIDES OF BOX. <�> TO ABOVE GROUND VENT RISERS, SEE DETAIL ON SHEET G.0.6.2. D <br /> OSINGLE 1" CONDUIT TO EACH SUBMERSIBLE PUMP. PROVIDE SEAL-OFFSEAL: <br /> AT SUMP & BUILDING WIRING TROUGH. CONTAINS LINE VOLTAGE WIRING. Q TANK PAD MINIMUM 2'-0" OFF OUTSIDE WALLS OF TANKS, AND MUST COVER THE <br /> LAST TWO FEET TO SUMP SHALL BE PVC COATED RIGID. FOOTPRINT OF THE TANKS. REQUIRED TO PROVIDE FOR PROPER TANK HOLD QvgvESsIONq� <br /> DOWN, AND TO PREVENT ACCIDENTAL DRILLING INTO TANK. ��/ Ynyc <br /> ONE STANDARD MONITORING HCUT CORNER WHERE MEETING ASPHALT PAVING ONLY. SQUARE <br /> RUN CONDUIT TO EACH TANK. FOR 14 CORNERS WHERE MEETING CONCRETE. HAL P. GRUBB <br /> STANDARD <br /> LOO <br /> ARD MONITORING DEVICES, LOOP CONTAINMENT SUMP SENSORS, <br /> PLLD, VAC SENSORS & TANK GAUGE TO TANK INTERSTITIAL SENSOR - 67 <br /> LOCATION AND HOMERUN TO BLDG. PROVIDE SEAL-OFFS IN BUILDING & 15 DIESEL OPTION USES JUST ONE PRODUCT LINE TO DIESEL DISPENSER. � <br /> OPRIOR TO LEAVING HAZARDOUS AREA. ROUTE TO INTRINSICALLY SAFE <br /> TROUGH IN BUILDING. CONDUITS SHALL CONTAIN ONLY LOW VOLTAGE REFER TO DIESEL UST INSTALLATION DRAWING FOR STAND-ALONE UST OR AS <br /> WIRING FOR SENSORS. LAST TWO FEET TO SUMPS SHALL BE PVC 16 AN EXTENSION TO THIS UST DESIGN. <br /> COATED RIGID. 0 f V 1 L c�a <br /> SEE SITE SPECIFIC PLANS FOR ACTUAL TANK SIZES, PLACEMENT, AND F OF CAI,\F� (1 <br /> ORIENTATION. FINAL SITE SPECIFIC TANK LAYOUTS SHALL BE APPROVED BY <br /> USE PEA GRAVEL CONSISTING OF NATURALLY ROUNDED AGGREGATE, MIN THE LOCAL DISTRIBUTION TERMINAL MANAGER OR HIS AGENT. FINAL LOCATION <br /> OYa" <br /> & MAX OF 3/4SIGN-OFF SHALL BE DOCUMENTED. <br /> � " IN SIZE, FREE OF CLAY, SLAG, CINDERS, OR DEBRIS. I <br /> ALL SUBSTITUTES MUST BE APPROVED BY MANUFACTURER'S & OWNER'S REFER TO SITE SPECIFIC PLANS FOR ACTUAL PIPE RUNS & NUMBER OF <br /> FIELD REPRESENTATIVE, 18 PRODUCT LINES (1 OR 2 PER UST SUMP). v <br /> X <br /> ASPHALT AND STONE PER z <br /> ASPHALT & STONE AS PROJECT SPECIFICATIONS a <br /> SPECIFIED BY PROJECT <br /> SPECIFICATIONS EXTEND CONTINUOUS 14 <br /> FILTER FABRIC TO SLAB <br /> DEVELOPMENT INFORMATION: o <br /> ARCO NTI <br /> MODIFIED <br /> 3000 am/pm <br /> FILTER FABRIC /\ <br /> 16 <br /> NOTE: �1 / //\// w/ 26x65 CAR WASH Q <br /> SLOPE SIDES OF TANK HOLE /\ — �, —� FUEL CANOPY w/ 8 MPD's N <br /> OR USE SHORING FOR ALL \//\ 15 A // / <br /> cc <br /> TANK EXCAVATIONS IN \\/ 2' 10'-4" 3'-0" 10'-4" 2 // SITE ADDRESS: r <br /> ACCORDANCE WITH OSHA 1926 \\ \ I� Ll \/ .- <br /> SUBPART P, OSHA STANDARDS //\ MIN. YMIN. /\\// o <br /> - EXCAVATIONS; FINAL RULE /\\ / <br /> OCTOBER 1, 1989 TRINITY PARKWAY <br /> @ SCOTT CREEK DRIVE <br /> 7 8 13 \//\\ — — — — / o- PEA LIFT OF <br /> GRAVEL STOCKTON,CA E <br /> co TO TOP OF <br /> 9 13 \\\ <br /> TANK FACILITY # TBD a <br /> DESIGNED BY: ALLIANCE Z&DM: <br /> BP REPM: <br /> OEM <br /> aY: <br /> o X \ \ \// 2nd LIFT OF PEA GRAVEL ro <br /> I g \ ° ° ° \ N DRAWN BY: ALLIANCE PM: o <br /> d �� = a° 1St LIFT OF PEA GRAVEL <br /> ^° y ° - VERSION: PROJECT NO: g <br /> 10 0 MIN: o ego l'-0r MIN' \/ N BED <br /> \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ \ _ 16700 g <br /> 0MIN_ ` 10 12 DRAWING TITLE: <br /> 2 3 4 5 6 FILTER FABRIC ON 6""\N AX. ,1&" UST INSTALLATION Y <br /> 18' BOTTOM & SIDES OF 18 18 ° � (1) 10'0 20K& (1) 10-0 12K/l0K <br /> TANK HOLE (WET 16 11 BLENDING <br /> HOLE ONLY) 7 l'-0" MIN. PEA GRAVELDOUBLE WALL VENT&VAPOR .$ <br /> c <br /> --- INSTALLED OVER COMPACTED SOIL. <br /> NOTE- NOTE: <br /> ALTERNATE ANCHORING BY USE OF DEFLECTION MEASUREMENT BEFORE & AFTER N WET HOLE INSTALLATIONS, <br /> A CONCRETE ANCHORING PAD IS TANK INSTALLATION SHALL BE ACCORDING TO INCREASE TO 18" MINIMUM PER SHEET N0: E <br /> PERMITTED. CONSULT WITH MANUFACTURER'S REQUIREMENTS AND SHALL MANUFACTURER'S RECOMMENDED o0 <br /> OWNER'S REPRESENTATIVE ANDBE WITHIN MANUFACTURER'S TOLERANCES. INSTALLATION GUIDELINES. <br /> SUCH SHALL BE INSTALLED ALL INFORMATION SHALL BE COMPLETED AS AA <br /> ACCORDING TO MANUFACTURER'S PER THE MANUFACTURER'S WARRANTY ,�,�,O� CD <br /> o <br /> RECOMMENDATION. DOCUMENTATION. <br /> G TYPICAL TANK ANCHORING DETAIL NOTE: INDICATES ITEMS FOUND ON MATERIALS i <br /> SCALE: 1/4" = 1'-0" XX LIST SHEETS M.5.3.01 & M.5.3.02 <br /> S <br />