VENT STACK DETAILS WITH VEEDER-ROOT CARBON CANISTER VAPOR POLISHER TYPICAL DOUBLE WALL SCALE: 1" = 1'-0"
<br /> 90 1/2" 10 1/2"
<br /> D 23 CAPS (SEE NOTE BELOW) ADDITIONAL INSTALLATIO
<br /> PRESSURE VACUUM VENT CLIENT.
<br /> N NOTES, ��
<br /> SERVICEABLE VAPOR SENSOR GROUP PRESSURE VACUUM VENT CAP
<br /> 23 1. ALL INSTALLATIONS OF VEEDER ROOT CARBON CANISTER VAPOR POLISHER LOCATION OF VAPOR PROCESSING EQ IPM NT(SEE NOTE BELOW) INSTALLATIONS SHALL BE REVIEWED BY BP LOGISTICS FOR APPROVAL AFIRE CODE:
<br /> PRIOR TO SUBMITTALS TO AUTHORITIES HAVING JURISDICTION AND CFC 2007 §2206.7.9.2.2 LOCATION
<br /> RE-REVIEWED BY BP LOGISTICS AFTER PERMIT APPROVALS ARE OBTAINED.
<br /> ADDITIONALLY INDIVIDUAL SITE PLANS NEED TO BE REVIEWED BY THE ECS EQUIPMENT VAPOR-PROCESSING EQUIPMENT SHALL BE LOCATED AT OR ABOVE .
<br /> TO MAKE SURE THERE ARE NO SENSITIVE RECEPTORS WITHIN 1000 FEET GRADE. SOURCES OF IGNITION SHALL BE LOCATED NOT LESS THAN 50 FEET
<br /> AIR
<br /> O I OF THE EQUIPMENT LOCATION. (15240MM) FROM FUEL-TRANSFER AREAS AND NOT LESS THAN 18 INCHES
<br /> 24 VENT RAIN CAP 2. THE VENT DISCHARGE SHALL BE LOCATED AND DIRECTED SO THAT VAPORS (457.2MM) ABOVE TANK FILL OPENINGS AND TOPS OF DISPENSER ISLANDS.
<br /> O I 0 0 VEEDER-ROOT CARBON CANISTER 67 WILL DISPERSE, VAPORS SHALL BE DIRECTED UPWARD AND HORIZONTALLY
<br /> VAPOR POLISHER AWAY FROM ADJACENT WALLS. VENT OUTLETS SHALL BE LOCATED SO AS VAPOR-PROCESSING UNITS SHALL BE LOCATED NOT LESS THAN 10 FEET
<br /> OR OTHER OBSTRUCTIONS AND SHALL BE (3048MM) FROM THE NEAREST BUILDING OR PROPERTY LINE OF A PROPERTY
<br /> CANISTER WEIGHT APPROX. 70 LBS, NOT TO BE TRAPPED BY EAVES
<br /> SEE FOUNDATION DESIGN CRITERIA AT LEAST 5 FEET FROM BUILDING OPENINGS. DISCHARGE SHALL NOT BE WHICH CAN BE BUILT UPON.
<br /> BELOW I I I EXCEPTION: WHERE THE REQUIRED DISTANCES TO BUILDINGS, PROPERTY
<br /> LESS THAN 12' FROM FINISH GRADE. VENTS SHALL BE INSTALLED IN
<br /> 3 INSTALL ONLY ON THE OCTANE ACCORDANCE WITH NFPA 30 (2008). LINES OR FUEL-TRANSFER AREAS CANNOT BE OBTAINED, MEANS SHALL BE
<br /> INS
<br /> CANISTER SUPPORT BRACKET VENT RISER. DO NOT INSTALL ON PROVIDED TO PROTECT EQUIPMENT AGAINST FIRE EXPOSURE. ACCEPTABLEAd
<br /> AND FASTENERS (FROM KIT) DIESEL RISER IF EXISTING M�
<br /> NS INCLUDE:
<br /> 3. VENT RISERS SHOULD STAND NO LESS THAN 3' FROM THE OUTSIDE OF 1. APPROVED PROTECTIVE ENCLOSURES, WHICH EXTEND AT LEASE 18
<br /> ° CANISTER SUPPORT STUDS W/ CURB. INCHES (457.2MM) ABOVE THE EQUIPMENT, CONSTRUCTED OF FIRE-RESISTANT '
<br /> O NUTS (3 EACH SIDE) EXPLOSION PROOF J-BOX
<br /> 4. THE CONTRACTOR IS RESPONSIBLE FOR SHORING AND THE PROTECTION IN OR NON-COMBUSTIBLE MATERIALS OR
<br /> 2. FIRE PROTECTION USING AN APPROVED WATER-SPRAY SYSTEM. CO
<br /> I MOUNTED TO POST 9 PLACE OF EXISTING FACILITIES. j`
<br /> 2" U-BOLTS `� VAPOR-PROCESSING EQUIPMENT SHALL BE LOCATED A MINIMUM OF 20 FEET AR
<br /> 5. MAINTAIN 5 FEET CLEAR AROUND CARBON CANISTER VAPOR POLISHER (6096MM) FROM DISPENSING DEVICES. PROCESSING EQUIPMENT SHALL BE
<br /> O oa FOOTPRINT TO GRADE. PROTECTED AGAINST PHYSICAL DAMAGE BY GUARDRAILS BS PROTECTIVE
<br /> BP WEST COAST PRODUCTS,LEC
<br /> Wo ECTIVE
<br /> w z 6. BALL FLOAT VALVES ARE CURRENTLY INSTALLED AS BP STANDARD ENCLOSURES OR FENCING. WHEN APPROVED PROTECTIVE ENCLOSURES ARE
<br /> 2" VENT PIPE EXTENSION MANUFACTURER SUPPLIED 11 I I I PRACTICE FOR PROTECTION OF WETTING OF THE VENT AND STAGE II VAPOR USED, APPROVED MEANS SHALL BE PROVIDED TO VENTILATE THE VOLUME
<br /> z MOUNTING TUBING i ~ PIPING. WITHIN THE ENCLOSURE TO PREVENT POCKETING OF FLAMMABLE VAPORS. u
<br /> INSTALLING CANISTER ONTO BRACKET � GROUP U - r1^!
<br /> w
<br /> X.
<br /> 7. CONTRACTOR SHALL CONFIRM AND LABEL ALL VENT STACKS WITH CORRECT IF A DOWNSLOPE EXISTS TOWARD THE LOCATION OF THE VAPOR-PROCESSING
<br /> 0 O -o0 PRODUCT VENT TIE IN TO AVOID PRODUCT CONTAMINATION AND IMPROPER UNIT FROM AFUEL-TRANSFER AREA, THE CHIEF IS AUTHORIZED TO REQUIRE
<br /> I I 1 K'm Cn PROCESSOR TIE-IN. PROVIDE CONFIRMATION ON PIPE AND TANK CHECKLIST ADDITIONAL SEPARATION BY DISTANCE AND HEIGHT. //yy7 A
<br /> I N az
<br /> o (LABEL MAKER OK). "DO NOT INSTALL ON DIESEL" CFC 2007 §2206.7.9.2.3 INSTALLATION
<br /> 2" REDUCING TEE I I w z ¢ VAPOR-PROCESSING UNITS SHALL BE SECURELY MOUNTED ON CONCRETE,
<br /> CANISTER OPERABILITY TEST PORT ( I o w z w w 8. THERE SHALL BE NO POCKETS OR LIQUID TRAPS IN ANY OF THE MASONRY OR STRUCTURAL STEEL SUPPORTS ON CONCRETE OR OTHER O U
<br /> 2" SCH. 40 GALV. STEEL a w CONNECTED PIPING FROM THE VEEDER ROOT CARBON CANISTER VAPOR NON-COMBUSTIBLE FOUNDATIONS. 2s ?
<br /> *MAINTAIN CLEARANCE INA VENT RISER PAINT TO 8 D a a Lo
<br /> o w POLISHER TO THE VENT STACK TIE-IN POINT. 5'
<br /> DIRECT LINE, TO ALLOW FOR MATCH SITE CONDITIONS w
<br /> CONNECTION OF TESTING NOTE: BP DO NO PE IT EVAPOR-P CE IN EQUIPMENT T BE GST ��
<br /> APPARATUS. I " F O w� 9. THE VENT STACK RACK AND RISERS SHALL BE GROUNDED. TIE THE /N E
<br /> C)
<br /> ¢ w GROUND WIRE FROM THE VENT STACKS TO THE UST SYSTEM GROUND. INSTALLED ON ROOFS OF BUILDINGS OR CANOPY STRUCTURES SEE ALTERNATE �+ ENGEN
<br /> 3-WAY LOCKING BALL VALVE I w I W C� o a MOUNTING DETAILS FOR EXISTING SITES WHERE VENT RISERS AR MOUNTED AT
<br /> v, FASTEN VENT RISER , FRAME W = = w U 0 10. PRIOR TO PERFORMING MAINTENANCE, TEST PORT VALVE MUST BE VENTED ROOFS.
<br /> TO BE LOCKED IN OPEN I /
<br /> n 2" BRONZE U-BOLT, 3/8"0 HOLE ( 18215 72ND AVENUE SOUTH
<br /> POSITION IN NORMAL OPERATING i z ¢ TO ATMOSPHERE. KENT, WA 98032
<br /> MODE. o W/ LOCK WASHER HEX NUT. TEST
<br /> o EACH RISER FOR ELECTRICAL I I X z Z w 11. VEEDER ROOT SYSTEM TO BE LEAK-TESTED PRIOR TO START-UP TO AVOID (425)251-6222
<br /> 0 o CONTINUITY TO VENT RACK (TYP.) II o
<br /> BRANCH CONNECTION FROM 1 z U J 11 II II011 m Z = LEAKAGE TO ATMOSPHERE. (425)251-8782 FAX
<br /> VENT RIDER MUST BE INSTALLED w ° II
<br /> LEVEL OR SLOPED BACK TO THE m I o0 0 12. ANY SPENT CARBON FROM CANISTER SHALL BE TREATED AS HAZARDOUS CIVIL ENGINEERING, LAND PLANNING,
<br /> TANKS I ( o a k' 2" TEE WITH 1/4" TEST =
<br /> z 0 I W WASTE AND DISPOSED OF PROPERLY SURVEYING, ENVIRONMENTAL SERVICES
<br /> W Z PORT FITTING AND 1/4" w N0. DATE REVISION DESCRIPTION
<br /> W PLUG (TYP.) = 13. INSPECT FOR VEEDER ROOT CARBON CANISTER VAPOR POLISHER FOR
<br /> 2" SCH. 40 GALVANIZED STEEL a_I " w o
<br /> 1 _w o DAMAGE PRIOR TO START UP OR RE-COMMISIONING AFTER SERVICE. t s-s-is PERMIT SUBMITTAL
<br /> RISER. PAINT PER SPECS (TYP.) 8 ^ 2-IN-1 SENSOR 1
<br /> w
<br /> 2" TEE WITH 1/4" TEST PORT I I 2 12-14-16 PERMIT RESUBMITTAL
<br /> I (D< BOX i 3 1-37-17 PERMIT RESUBMITTAL
<br /> TTING AND 1 PLUG (TYP.) ¢ 3 EXPLOSION PROOF J-BOX 1$ I I I I
<br /> MOUNT TO POST
<br /> 1/4' BALL VALVE AND VACUUM I a e-1s-n CONSTRUCT ON RELEASE
<br /> TUBING FOR TEST 1/4" BALL VALVE AND VACUUM BOLTED GROUND CONNECTION TO
<br /> SQ 11-74-17 REV. FOR CONSTRUCTION
<br /> x TUBING TO TEST CONTINUITY I I I ( VENT RACK
<br /> 2-IN-1 SENSOR 1 189 EXPLOSION PROOF m 9 I 2" OPENINGS WATERTIGHT
<br /> J-BOX MOUNTED TO
<br /> BOX I POST INSTALL (1) 1" CONDUIT I I COMPRESSION PASS THRU (TYP.) Q
<br /> MANOMETER W/ PULL ROPE FOR S 3 s
<br /> FUTURE TANK DIAGNOSTIC RESERVOIR TO TEST CONTINUITY
<br /> HOUSING 19 SEAL OFF REQUIREMENTS ROUTE TO 8 ( 1 ST I
<br /> HYDROSTATIC MONITOR SENSOR - MONITORING PANEL IN FOR DOUBLE WALL VENT 1 I OPTIONAL 6" THICK BUILDING DI - - _ - 0 FOR DOUBLE WALL VENT Q
<br /> TRANSITION CONTAINMENT SUMP = - - I CONCRETE SLAB OPTIONAL 6" THICK - I TRANSITION CONTAINMENT SUMP TESTING NOTES: 1
<br /> GRADE GRADE CONCRETE SLABA TYPICAL SPILL 2
<br /> 2" BELLxMALE ADAPTER 4 / I o X BUCKET AT PER CARB E.O. VR-204 ALL EXISTING SINGLE WALL VENT AND VAPOR PIPING SEAL•.
<br /> (TYP.) j\\ I I \//\\//\\//\\/, \\\% "_ / / / / // / III I I HIGHEST INSTALLATIONS AND NEW DOUBLE WALL VENT AND VAPOR INSTALLATIONS SHALL
<br /> 3" FRP BONDED FITTING T - - - -
<br /> - \ \ \ \ \ I) II \ \ ELEVATION LEVEL HAVE THE FOLLOWING TESTS TO BE COMPLETED WITHIN 60 DAYS AFTER QROFESS/Ok.
<br /> W/ TEST PORT TYP.) 3 \ \ � III // // // // / / // // // // // / ° - a - ISI - START-UP AND AT LEAST ONCE IN EACH 12 MONTH PERIOD USING THE 0 �F
<br /> ( I I \\/\\/\\/\\/\\/\\ /\\/\\/\\/\\/\\/\\ I III / GRADE FOLLOWING TEST PROCEDURES. �� '1
<br /> 2" INSIDE 3„ �\ \ I III° \//\//\//\//\//\� /\//\//\//\//\//\/ III f III14
<br /> \\/\\/ �- = ci
<br /> 4 4 �`° I I �\�\/\/\/\/\/ �\/\ ° 1 / / / w HAL P. G 11BB
<br /> DOUBLE WALL FRP III TP-201.3 DETERMINATION OF 2-INCH WC STATIC PRESSURE m
<br /> VENT LINE. SEE ° a RACK FOUNDATION TO 4 II \ \\ \\ \ \ PERFORMANCE OF VAPOR RECOVERY SYSTEMS OF DISPENSING FACILITIES -'
<br /> �° III BE ENCASED IN 2,500 TO INTRINSICALLY SAFE Ia I I a 1 I / (March 17, 1999);
<br /> NOTE BELOW. � a
<br /> PSI CONCRETE WIREWAY IN BUILDING
<br /> a 11TP-201.4 DYNAMIC BACK PRESSURE (July 3, 2002) IN ACCORDANCE 2" FLEX CONNECTOR 1�
<br /> d Q
<br /> WITH THE CONDITION LISTED IN ITEM 1 OF THE VAPOR COLLECTION 9 C V 9 ?
<br /> 39 \//\\/ / \/\\/\\/ ° 1 0 o z 2" INSIDE 3" DOUBLE WALL I I d J d SECTION OF EXHIBIT 2 OF THE VR-204 EXECUTIVE ORDER; IN ADDITION TF OpW-
<br /> -DISCRIMINATING
<br /> 4"x3' CONCENTRIC LIQUID SENSOR BP PROCEDURES REQUIRE THE EXECUTION OF METHODOLOGY 6 CAS (I 1
<br /> REDUCER TYP. \//\/ \//\//\/ NON-DISCRIMINATING ;I 4 14 °
<br /> (TYP.) a I j � FRP VENT LINE. SLOPE TO 42 I
<br /> 0 4 EXHIBIT 4 OF THE VR-204 EXECUTIVE ORDER, REQUIRED ITEMS IN
<br /> ° TANK AT 1/8" PER FOOT ° (1011 a #4 BARE STRANDED CU CONDUCTING TP-201.3;
<br /> MINIMUM. SEE NOTE BELOW. 74 2" FLEX CONNECTOR GROUND WIRE TO TANK
<br /> BRINE FILLED DOUBLE 11
<br /> WALL VENT LINE I (TYP.) I I (TYP.) I, FIELD GROUNDING EXHIBIT 5 OF THE VR-204 EXECUTIVE ORDER, LIQUID REMOVAL TEST
<br /> ° SYSTEM PROCEDURE; x
<br /> TRANSITION SUMP ( d BRINE FILLED
<br /> (TYPICAL) 1
<br /> COMPACTED OR NATIVE SOIL ( 4 11 DOUBLE WALL VENT I I 4 EXHIBIT 6 OF THE VR-204 EXECUTIVE ORDER, HYDROCARBON SENSOR
<br /> I I I
<br /> ° 1 ° LINETRANSITION I VERIFICATION TEST; z
<br /> SUMP
<br /> ° v EXHIBIT 8 OF THE VR-204 EXECUTIVE ORDER, VAPOR
<br /> A ° \ PRESSURE SENSOR VERIFICATION TEST; DEVELOPMENT INFORMATION:
<br /> rn
<br /> 0
<br /> ° SECTION A.A ° ° \//\ EXHIBIT 9 OF THE VR-204 EXECUTIVE ORDER, DETERMINATION OF VST ARCO NTI
<br /> ELECTRICAL INSTALLATION NOTES: PROCESSOR ACTIVATION PRESSURE;
<br /> MODIFIED
<br /> - - - 1. ALL ELECTRICAL INSTALLATIONS ARE TO BE PER NEC/SEC CODE FOR THE AND EXHIBIT 11 OF THE VR-204 EXECUTIVE ORDER, OPERABILITY TEST 3000 am/pm
<br /> AREA INSTALLED. INSTALLATION IN A CLASSIFIED AREA IS AN EXCEPTION PROCEDURE FOR THE VEEDER-ROOT ISD FLOW METER. N
<br /> VENT PIPING - - - - - - - W/ 26 X65 CAR WASH SECTION C-C OPTIONAL 6" THICK- �� MOUNTING RACK I 12"m 2500 PSI CONCRETE TO THE NORMAL SITING AND SHALL REQUIRE FURTHER REVIEW OF BP SHORTER TIME PERIODS MAY BE SPECIFIED IN ACCORDANCE WITH LOCAL FUEL CANOPY W/ $ MPD'S
<br /> SEE DETAIL 'A' ° 1 FOUNDATION PROJECT MANAGER. DISTRICT REQUIREMENTS. NOTIFICATION OF TESTING, AND SUBMITTAL OF TEST a
<br /> CONCRETE SLAB
<br /> - - - - - - - - - I 2. ENSURE THE VEEDER ROOT CARBON CANISTER VAPOR POLISHER IS RESULTS, SHALL BE DONE IN ACCORDANCE WITH LOCAL DISTRICT
<br /> VAPOR SENSOR 0 II ° I REQUIREMENTS AND PURSUANT TO POLICIES ESTABLISHED BY THAT DISTRICT. sITE ADDRESS:
<br /> BONDED AND GROUNDED TO THE SITE SYSTEM AND TO THE SITE TANK
<br /> OPERABILITY EXPLOSION PROOF J-BOX I r O O 1 Q I1 II GROUNDING SYSTEM TO ELIMINATE THE POSSIBILITY OF ELECTRICAL ALTERNATIVE TEST PROCEDURES, INCLUDING MOST RECENT VERSIONS OF THE o
<br /> INTRINSICALLY SAFE TEST PORT MOUNTED TO POST 18 II I I DISCHARGE AS AN IGNITION SOURCE. TEST PROCEDURES LISTED ABOVE, MAY BE USED IF DETERMINED BY THE ARB TRINITY PARKWAY
<br /> - - - - - - I I EXECUTIVE OFFICER OR EXECUTIVE OFFICER DELEGATE, IN WRITING, TO YIELD @ SCOTT CREEK DRIVE
<br /> VALVE ASSEMBLY
<br /> LIQUID SENSOR 0 1 II 3. BONDING AND GROUNDING: BONDING AND GROUNDING GUIDELINES FOR EQUIVALENT RESULTS. IT IS FURTHER ORDERED THAT THE FOLLOWING STOCKTON,CA
<br /> NON-DISCRIMINATING I • CONSTRUCTION REGARDING DISPENSING EQUIPMENT ARE TO BE IN PLACE REQUIREMENTS ARE MADE A CONDITION OF CERTIFICATION. THE OWNER OR
<br /> MINI HYDROSTATIC AND IN ACCORDANCE WITH PETROLEUM EQUIPMENT INSTITUTE (PEI). OPERATOR OF THE VST PHASE II EVR SYSTEM INCLUDING VEEDER-ROOT ISD
<br /> TEST PORT I II 1
<br /> VALVE ACTIVATED 2" BELLxMALE ADAPTER 41D4 -4,-_ II I II MONITOR SENSOR IN SHALL CONDUCT, AND PASS, THE FOLLOWING TESTS NO LATER THAN 60 DAYS FACILITY # TBD
<br /> CARBON BEDI(TYP.) HOUSING AFTER STARTUP USING THE FOLLOWING TEST PROCEDURE: EXHIBIT 10, NOZZLE a
<br /> SERVICEABLE II II BAG TEST PROCEDURE. NOTIFICATION OF TESTING, AND SUBMITTAL OF TEST DESIGNED BY: ALLIANCE Z&DM:
<br /> VAPOR SENSOR 11 BRINE FILLED DOUBLE NOTES: RESULTS, SHALL BE DONE IN ACCORDANCE WITH LOCAL DISTRICT o
<br /> 3" FRP BONDED FITTING 3 1 WALL VENT LINE IN ORDER TO PROVIDE MECHANICAL FLEXIBILITY WITHIN THE RIGID FRP PIPING C CKED BY: BP REPM: 3
<br /> 1 i II it TRANSITION SUMP REQUIREMENTS AND PURSUANT TO THE POLICIES ESTABLISHED BY THAT a
<br /> W/ TEST PORT (TYP.) _ - - = SYSTEM, PROVIDE AT LEAST 4 FEET OF STRAIGHT PIPE RUN BEFORE A CHANGE DISTRICT. ALTERNATIVE TEST PROCEDURES, INCLUDING MOST RECENT VERSIONS DRAWN BY: ALLIANCE PM:
<br /> - IN DIRECTION OF 30 DEGREES OR MORE. (NEPA 30A (2000 & 2003) OF THE TEST PROCEDURES LISTED ABOVE, MAY BE USED IF DETERMINED BY o
<br /> 4"x3" CONCENTRIC 39 I §5.3.3(2)), CFC (2007) §3403.6.9.1) THE ARB EXECUTIVE OFFICER OR EXECUTIVE OFFICER DELEGATE, IN WRITING, VERSION: PROJECT Na
<br /> SERVICEABLE ° ° ° ° TO YIELD EQUIVALENT _ 16700 0
<br /> FILTER ELEMENT 1- REDUCER (TYP.) _ THE VENT CONFIGURATION SHOWN IS IN ACCORDANCE WITH CP-201 THE NUMBER RESULTS. o^
<br /> ° ° ° ° ° ° I OF VENT CAPS AT ANY GDF SHALL NOT PERMIT AN ADDITIVE LEAK RATE OF DRAWING TITLE.
<br /> 2" INSIDE 3" DOUBLE 4 _ _ _ _ MORE THAN .17 CHF AT 2" OF WATER COLUMN. MAX ALLOWED WITHOUT
<br /> WALL FRP VENT LINES - - - - - - - - -{ - - - - - - J
<br /> (VACUUM MONITORED) 4 I MANIFOLDING IS (3). DESIGN CRITERIA - PER 2007 rar DESIGN INTENT: NEW VENT STACK
<br /> THE VENT DISCHARGE SHALL BE LOCATED SO THAT VAPORS ARE RELEASED ATA INSTALLATION DETAILS W/ VEEDER•ROO o
<br /> NOTE: SAFE POINT OUTSIDE OF BUILDINGS AND NOT LESS THAN 3.6 M ((12 FT) ABOVE THE 5-MMIC LOADSCARBON CANISTER VAPOR POLISHER
<br /> VEEDER ROOT CARBON CANISTER VAPOR ADJACENT GROUND LEVEL. VAPORS SHALL BE DISCHARGED UPWARI) OR (CALIFORNIA ONLY)
<br /> NOTE: POLISHER TO BE LOCATED IN HORIZONTALLY AWAY FROM ADJACENT WALLS. VENT OUTLETS SHALL BE LOCATED SO SITE INFORMATION IMPORTANCE: 1 SITE CLASS = D
<br /> CONFORMANCE WITH MANUFACTURERS THAT VAPORS WILL NOT BE TRAPPED BY EAVES OR OTHER OBSTRUCTIONS AND SHEET N0: u
<br /> CANISTER MAINTAIN A 5 FOOT CLEARANCE TO ZI Z ZI Z Z z SHALL BE AT LEAST 1.5 M (5 FT ) FROM BUILDING OPENINGS. VENTS SHALL BE BASIC RESISTING E
<br /> OPERABILITY GRADE AROUND CARBON CANISTER j > > INSTALLATION MANUAL, CARE EXECUTIVE INSTALLED IN ACCORDANCE WITH NFPA 30 2003 §5.7.2 SYSTEM: o
<br /> VAPOR POLISHER FOOTPRINT ( ORDER VR-204 AND ALL APPLICABLE ( ( ) ), (UFC (2000) §7902.13). R=2 R=2 SD1=1.0 SDS=1.83
<br /> TEST PORT STATE AND LOCAL CODES. (IFC/CFC (2007) §3404.2.7.3.3). (REF: ASCE 7-05 Cd=2.5
<br /> DETAIL 'A' SECTION D-D I VENT RISERS SHOULD STAND NO LESS THAN 3' FROM OUTSIDE EDGE OF CURB TABLE 15.4-2)
<br /> SCALE: NONE ,A� THE ACTUAL NUMBER OF VENT RISERS IS DETERMINED BY THE NUMBER OF BASE SHEAR EQ. GA6.2
<br /> SCALE: NONE PLAN VIE . I DESIGN BASE ( (MAX. BASE SHEAR (MIN. BASE SHEAR o
<br /> UNDERGROUND STORAGE TANKS. THE DIESEL VENT RISER IF INSTALLED IS 12.8-2) EQ. 12.8-/) EQ. 12.8-5&6
<br /> ALWAYS SEPARATE. ( ) SHEAR: 0.92W V=Cs V=SD1W/TR/I V=.5S1W/R/I
<br /> V=0.92W V=1. 5W V=0.2 W
<br /> L�
<br />
|