Laserfiche WebLink
5 . Pzepare a surrtj report outlining pro-14*es, resul�;c and <br /> recommendations for further work, if warra�ited. <br /> WaterWork estimates the total cost to perform the preliminary <br /> subsurface investigation to be 813 , 39x. 00 based on the data <br /> currently available. <br /> During the drilling of roil borings and monitoring wells , <br /> Waterwork will make every effort to avoid underground utilities <br /> or improvements at the site. however, we cannot be responsible <br /> for damage to any underground utility or improvement whose <br /> location is not accurately depicted on plans provided, or whose <br /> existence and location we have not been previously apprised of. <br /> if you have any further questions or comment, regarding the <br /> proposed work steps or cost estimates, please contact me at your <br /> convenience . <br /> Respectfully, <br /> WaterWork <br /> V <br /> -�f <br /> Bill Channell <br /> Senior Geologist <br /> BC/tp <br /> Attachment <br />