My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
INSTALL_2002 DIESEL
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
V
>
VICTOR
>
880
>
2300 - Underground Storage Tank Program
>
PR0231746
>
INSTALL_2002 DIESEL
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/6/2020 4:41:29 PM
Creation date
11/6/2018 11:56:51 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
INSTALL
FileName_PostFix
2002 DIESEL
RECORD_ID
PR0231746
PE
2361
FACILITY_ID
FA0003862
FACILITY_NAME
Marks Fuel & Food, Inc.
STREET_NUMBER
880
Direction
E
STREET_NAME
VICTOR
STREET_TYPE
RD
City
LODI
Zip
95240
APN
049-050-32
CURRENT_STATUS
01
SITE_LOCATION
880 E VICTOR RD
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\V\VICTOR\880\PR0231746\DIESEL INSTALL PLAN 2002.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> T SQ.LOA7nNo II <br /> 6.0 Removable 'screw-in"IiR ng lugs and unused tank <br /> openings. <br /> If your fiberglass coated tank has removable, <br /> 'screw-in- type lifting lugs, remove lifting lug and treat <br /> as an unused opening. Any unused threaded UNUSED OPENING, <br /> opening, shall have a metal pipe plug property doped <br /> and securely installed in the opening. Rough up the I' <br /> area around the threaded opening with sandpaper. <br /> Mix resin and saturate fiberglass trial. Place the SANDED AREA <br /> saturated mat over the unused opening and apply <br /> additional resin, dabbing the mat into place. <br /> I <br /> i <br /> I <br /> i <br /> 7.0 Lug covers for permanent li mng lugs attachments: <br /> If your fiberglass coated tank has permanently welled APPLY SEALANT TO _ PRESS DOWN <br /> lifting lugs, then your kit will include non-metallic lifting UNtrERNEATH l FIRMLY <br /> lug covers and a tube of sealant- Install lug covers SIDE OF LUG <br /> COVERover lifting lugs per the following instructions. <br /> Rough up area around the permanently affixed 1 <br /> Tilting lug. Apply the sealant to the underneath side of SANDED <br /> the lug cover and place lug cover over the lifting AREA <br /> lug. Push lug cover down firmly until sealant <br /> protrudes out around the perimeter of the lug cover. APPLY ANY EXTRA <br /> Apply any extra sealant to outside edges of the lug SEALANT TO oUfSIDE EDGE <br /> Cover to assure a moisture tight seal. OF LUC COVER TO ASSURE <br /> Allow at least two(2) hours for sealant to cure before A MOISTURE TIGHT SEAL <br /> backfilling over lug covers. Care should be exercised <br /> not to hit or damage lug covers during the backfilling <br /> operation. CLEAN PIPE <br /> PRECUT MAT <br /> 8.0 Pipe connection covers: I <br /> I Sand areas where matting is to be placed on tank and <br /> piping. Saturate matting with resin and place mat <br /> around pipe as shown in illustration. SANDED AREA <br /> Dab mat into place with additional resin I required. <br /> Saturate 1'wide fiberglass strips, starling at the base <br /> of the pipe, wrap the fibergtass strip around the pipe, <br /> lapping the mat 112 its width, see illustration. 1'MAT STRIP <br /> Note: Finishing Instructions are not complete until all <br /> exposed steel surfaces on tank are sealed with fiberglass <br /> resin. <br /> n.- Fw z tw. .r.ca,.caw T.11"aoa <br /> 2 �'z <br />
The URL can be used to link to this page
Your browser does not support the video tag.