3�Feel <br /> Tank <br /> VIII <br /> INSTAL <br /> 1.0 EXCAVATION AND BEDDING JANUARY 2001 <br /> ANCHOR OPTIONAL <br /> 1.1 The bottom of the excavation shall be covered STRAP THREADED <br /> with a minimum of 12 inches305 mm oADJUSTM <br /> inches (305 INSULATING <br /> bedding, suitably graded and leveled. Bedding MATERIAL �++ R00 <br /> and backfill material surrounding the tank, to a <br /> width and depth of 12 inches (305 mm)all r <br /> around the tank,shall be clean material. ,.` <br /> 1.2 ANCHOR t�J <br /> Where anchoring by means of a concrete pad, BOLT <br /> the tank shall not be placed directly on the pad. \ <br /> Bedding material at least 6 Inches(152.4 mm) °1 <br /> deep must be spread evenly over the ( MINIMUM <br /> dimensions of the pad to separate the tank from <br /> the pad. <br /> REMOVE LARGE ROCK <br /> FROM EXCAVi <br /> 1.6 If earthen material from the site. or other earthen <br /> iMu <br /> IM 11 MINImaterial, is to be used as bedding or backfill <br /> material, a minimum of four 1 cu.ft, samples shall <br /> be taken from different locations which are <br /> representative of the backfill material and the <br /> SLOPE AS @ ® site. Samples shall be sieved to determine if the <br /> D � material complies with this specification. <br /> ACEW <br /> 1.7 In a tidal area, the tank`bedding"material shall <br /> v v Fa be crushed stone or pea gravel. Sand and <br /> > d�' natural earthen material may be used only If <br /> measures are taken to prevent washout of.. <br /> material during the design life of the systebi. <br /> f <br /> , <br /> 1.3 Bedding and backfill material shall consist of pea 2.0 AIR TEST AT JOB SITE <br /> gravel, crushed stone, dean sand or natural 2.1 Temporary plugs and thread protectors Installed <br /> earthen materials. Crushed stone, clean sand by the manufacturer shall be removed. Apply <br /> and natural earthen materials shall be capable of compatible, non-hardening pipe sealant to <br /> passing 100%through a 1/2 inch (13 mm)sieve internal bushing threads. Permanent metal <br /> and no more than 12% by dry weight through a plugs shall be installed at all unused openings. <br /> #200 sieve(0.0029 inch(0.0754 mm)). Pea <br /> gravel shall be no larger than 3/4-inch (19 mm). 2.2 The nylon bushings in the tanks shall not be <br /> The materials shall be free of all foreign removed from the unused openings. Plugs used <br /> materials, such as but not limited to, bricks, to temporarily seal the tank for the aboveground <br /> metals, concrete and plastics, air test, but later removed for pipe installation, <br /> 1.4 The backfill material may be from the tank site if shall not be overtightened. Do not cross thread <br /> it meets this description,or it may be delivered to plugs oar instage lling nylon re bushings <br /> tank when <br /> replacing <br /> the site from another source, <br /> plugs g Q piping. <br /> 2.3 Test pressure shall be maintained at, without <br /> 1.5 Sand or natural earthen materials used as exceeding, 5 psig (34.5 kPa)while a soap, <br /> backfill shall be placed into the excavation in 12- solution is applied to the area of pipe <br /> 18 inch (305-458 mm)vertical lifts, compacted connections and welds. <br /> after each lift, at least 60% up the vertical height <br /> of the tank. <br />