1/2' PVC DRAIN PIPEx 121 LG. 2 H.P. TURBINE PUMP 42' 0 EASY LIFT MANHQWC •INE ,., .. •, + • r.^r
<br /> I Ix�c O 60X TYP• OF 2 IW/ 12' OBSERVAT �? � 3' SECONDARY CONTAINMENT till
<br /> I P oQF
<br /> T T LY P fo �1'"
<br /> 5 2' PRODUCT LINE
<br /> (j
<br /> I' CONDUIT FROM P. OF
<br /> FILL SUMP ' (4) U E PRESSURIZED LINE LEAK �' � FLEX CONNECTOR I
<br /> DE FI7TI DETECTOR TYR. OF 2 "
<br /> 2 ELECTRICAL SEAL OFF 3' VAPOR RECOVERY TURBINE PLUG VALVE
<br /> I' CONDUIT FROM TSL-35OR. EXPLOSION PROOF UNION
<br /> '� , • 2' 90' ELL. SCR'D, IRW If ED .LACK TEE MUST BE uj
<br /> 4 CONDUIT FROM IN THIS POSITION rI
<br /> e M.L, BLACK, TYP, M 2 FUEL LOSE WHEN - OPENINGS
<br /> V E FREQUENCY 48' FIBERGLASS SUMP TUBE TO ELIMINATE CTANK i
<br /> CONTR S, TYP. OF 2 • W/ 36' 9 TOP HAT AND �d ACCESS TO 2' -
<br /> WATERTIGHT COVER PLUG IS TO BE VALVE 1
<br /> 3/4' (4) STY BLE I` USED. 2' TEE W/PLUG
<br /> ° ENDED ENTRY F11T1 11/2'x24' FLEX MxMS FLEX
<br /> TYP. OF 2 CONNECTOR, TYP. OF 2 " F.E. PETRO VALVE VENT LINE I FOR FUTURE 5
<br /> BALL VALVE I 2' FULL FOR L VALVE SENSOR MOUNTING KIT UWUN 1 IE SU8 PUMP
<br /> NORMALLY CLOSED TYP. OF PENETRATION 10 BOLT 2'x4.8' 3' VAPOR RETURN LINE
<br /> 2' NIPPCARBON 3' LG SCH, 2' /2' REDUCING TEE 11/2' COFLIX DBL, WALL A' PER ( SUMP OMIT ON DIESEL TANK).
<br /> 40 CARBON STEEL r SCR-0. M.L, BLACK - PRODUCT PIPE INSIDE 4' ••��
<br /> BLACK, TYR. OF 6 I TYR. OF 2 ROCKGUARD, TYR. OF 2 1� 11" VALVE REFER TO PIPING PLAN FOR ACTUAL t
<br /> ly CONFIGURATION 4 SIZE.
<br /> 1 1/2' 90' ELL. SCR'D, 150# 1� ' EXTRACTOR ASSEMBLY
<br /> M.I., BLACK, TYR. OF 2 , MIN. 14' DIFFERENCE FOR VENT
<br /> 1: N 01KRIRIRNINATING LIQUID � IN FLIA-UNI! €L@V. FLEX � NOTA'
<br /> SENSO••��•. - to PIPES MUST EXIT PERPENDICULAR TO SUMP WALL
<br /> OPTIOMAI. I T T 0 NEVER COVER UNUSED BUNGS W/ PIPE OR CONDUIT
<br /> Jp!4
<br /> kll�V VII'VIP X11" ,.T.�11VI( IPI +T 1 iL §Id�»I � DIESEL ,r e6dK�1
<br /> r
<br /> - ..: . ... ....... .... . ....:. .... ...,..�....,> re ,,...... .,v: .. r.a,^+m.m r+.a .. ,uw ,KALE. 112•• - L 0
<br /> •••• w,.,n. »..,r a., ..... .,..::.:.,. ., . . :".:..... ,,..,.,. .. , ., . ,,, ,.,, .,. . .,:w,•.,.:. ,.,..: - a,a..a.uric,rv.,r.+....nr.,.a,n,..v�w.naarnwFrvnma.umwnrn-na wc:x.+:.r ....vca,rsx,..., ' nn�a'', n..... ,. a .ae:ns�o i,a.,,..,xro+r+r,ww. .. ..,_,.a..=.vv..aa,w.�nrv.,
<br /> i
<br /> ALL TANK AND LINE INSTALLATIONS SHALL BE PERFORMED I. FULL SYSTEMS PRECISION TANK ! LINE TESTING I'
<br /> WI LICENSED CS MA C-36 GENERAL A OR GENERAL B TO BE ARRANGED BY (NOTIFY I I I I {
<br /> WITS HAZARDOUS M IAGRAMATIC CERTIFICATE GOND ARE N GENERAL CONTRACTOR REPRESENTATIVE 2 WEEKS rppr �G
<br /> THESE PIANS ARE EXACT
<br /> EPRES IN NATURE AND ARE NOT IN ADVANCE). I�� �1' IT — 7 � � T"I
<br /> INTENDED TO BE PLANS REPRESENTATION OF THE FINAL 2. SUMP 13OXES 4 TURBINE SUMPS ARE TO BE I"7" �_ _� —9-1 _ 36' DIA. MANi1OLE
<br /> PRODUCT. THESE PLANS SHALL BE USED S THE WATER TESTED AS FOLLOWS: I I I / I I�- 3 — #4 BARS tr�
<br /> CONTRACTOR AS AID ONLY, CONTRACTOR SHALL BE 6 LONG ARS
<br /> RESPONSIBLE FOR THE COMPLETE INSTALLATION O TANKS, I. FILL WATER TO RIM. I,, ` ,�
<br /> PIPES, AND ALL EQUIPMENT ASSOCIATED WITH SCOPE ++ I/I r
<br /> OF WORK 3. PIPING: AFTER PRESSURE TESTS ARE COMPLETED f', 4 TYR'
<br /> ON ALL THE LINES, PRESSURE MAY BE REDUCED tt
<br /> TO A MINIMUM OF 20 PSI AND MUST BE MAINTAINED
<br /> UNTIL ALL CONCRETE/ASPNALT SURFACES HAVE BEEN a
<br /> COMPLETED.
<br /> 6' TYR. ry
<br /> #4 BARS DIAG. i
<br /> 6' LONG TYR. .tt
<br /> � t _\1z
<br /> I
<br /> III ^ III
<br /> !//� - TANK LEVEL MONITOR {
<br /> VENT/VAPOR--}-i� TURBIN VAPOR RECOVERY -.--- r. '
<br /> \ -- FILL
<br /> y p
<br /> DIE 4
<br /> .1 ?`SIN.. .
<br /> SC ALF 1.2 ' 1'.0
<br /> TL- MAN HOLE .TE C .a-.rLHITO
<br /> REBAR 0 SUBPUMP, SEE a ,�I PHIL TITE EAST LID WITH F
<br /> "�- I VITON SEAT_
<br /> �. DUST CAP
<br /> FOR DRY TANK HOLE - .
<br /> 6' CONC. TANK EXACTOR ASSEMBLY L _�� ADAPTER ROTATABLE
<br /> SLAB W/ #4 RE13AR FOR VENT ! 4' PIPE ASPHALT VE B 6 #3 R I- FLAT I I ADAPTER
<br /> AT 24' O.C. EACH WAY CAP AT 24' W/ #3 REBAR ,i ROTATABLE II II PHIL—TITE 85001 NV SPILL
<br /> FOR FILL LID SPECIFICATIONS VAPOR RISER AT 24 O.C.O.C, EA, WAY .
<br /> 4' RISER ! USE MANUFACTURER GUIDELINES CONTAINMENT MANHOLE ADAPTER II I I BUCKET THREADED
<br /> CONC. SHALL EXTEND A MINIMUM TANK LEVEL MONITOR FOR INSTALLATION ' (OMIT ON DIESEL TANK) a SEAL I I I DIRECTLY OTT TANK RISER s
<br /> OF 2'-0' BEYOND THE ENDS AND I TL- 'i DROP TUBE 11 DRAIN VALVE
<br /> SIDES OF THE TANKS (SEE SITE , SUB PUMP SEALS BELOW
<br /> PLAN FOR ACTUAL TANK SLAB SIZE). , 36' DIA. OF CROWN ' f IIADAPPOR � ANNULAR SPACE MONITOR DRAIN PA.fN DRAIN PATH DIRECTLY
<br /> 11 I I INTO DROP TUBE
<br /> 2' MIN. 43/64' I ?6' DIA. MANHOLE i i 16" D��DIIA. NANHOLE 'O' RING�E I FLAT LOWER BUCKET• SEAL
<br /> II II TOP FLANGE DROP TUBE
<br /> THREADED TANK RISER
<br /> ,
<br /> 59CONDARY CON PAI MENT
<br /> ,,,t _---_ i -.- •� s I �. y. �. ` `e .x.� • 6' _._ �� II I 11•` (WITH BALL FLOAT
<br /> FIBERGLASS SUMP LID ' �• _ _ I TOP OF STORAGE TANK
<br /> I 1-11 I IF:: a1 11
<br /> TO CONTAINMENT SUMPDROP TUBE OPENING MUST
<br /> TEE MUST BE TA 90 TO I PVC SCH. 80W/ _ 0E SUBMERGED WHEN
<br /> E o -III—I
<br /> PREVENT
<br /> REMOVING2 PLUG — PVC SLEEVE FOR PROBE 42 CONTAINMENT SUMP — I BRINE FILLED ANNULAR '
<br /> _ ' 1 1 1 1 11 - 1-- I —III LIQUID LEVEL IS 6 DEEP-
<br /> —III 42' LEECONTAtNMEN7 SUMP 1) I I I 1 BOTTOM OF DROP TUBE
<br /> 4g III-1 I I 18' MIN. RISER HEIGHT — IiI III I I I ANGLE
<br /> �ED BE CUT ON A 45'
<br /> i;t 1z 3 III—I FIBERGLASS ALL SUMPS SUMP SENSOR I I F_ ,I iii TANK LEVEL MONITOR - III—III--
<br /> TO TANK COLLARS- TYR.
<br /> ° LIQUID SENSING PROBE — — — — ' r
<br /> BALL FLOAT I I I BALL FLOAT I II I TYPICAL DROP *ruBE
<br /> EXTRACTOR ' }I2'x 24' FLIX CONNECTOR EXTRACTOR I I I I �.3�f . . ._- ___.
<br /> I I I I 1 1 PEA GRAVEL SCALE: N.T.S.
<br /> / - [13' VAPOR RETURN PIPING 1 I BACKFILL
<br /> (OMIT ON pIESEL TANK) I 1
<br /> 2' VENT PIPING ON ALL TANKS II IS, MIN
<br /> I I PHIL—TITE CAST LID WITH
<br /> / 1 , MAN HOLE , VITON SEAL
<br /> ' FILTER FABRIC
<br /> 1 1 \ IS —�— DUST CAP
<br /> (IF REQIRED) I I 1 I II FLAT ADAPTER
<br /> ROTATABLE
<br /> I I I I I I I 1 LIQUID SENSING I ROTATABLE II I I
<br /> TITE 8°.'001
<br /> 1 I I OBE WHEN C1 ADAPTER I BUCK D SPILL DIRECTLY HON TANK RISER I I I
<br /> ANULAR SPACE SEAL II I I
<br /> IS DRY / II FLAT LOWER BUCKET SEAL
<br /> L
<br /> THREADED TANK RISERt
<br /> SECONDARY CONTAINMENT
<br /> = L ( / I Ir' 1 UNIVERSAL LEXTRACTOR
<br /> FITTING
<br /> TIL- II _ �J 1 II TOP OF STORAGE TANK ;
<br /> = DEfLETOR PLATE SLOPE TANK DOWN 1-1/2' TO 2' TOWARDS FILL ( PIT TANKS SHALL BE LEVEL) I
<br /> TYR. UNDER ALL a SLN
<br /> ----- — —
<br /> TANK BUNGS
<br /> VAPOR PIPING '
<br /> tl _ .__III_._ ' II I I III III III I I� -�III III III -III f CONNECTION V�T
<br /> NIVER5AV BALL FLOAT
<br /> III;III III III=: –III I III—III-1 I I I STEEL BRAIDED I
<br /> III -III- 1--III—I I I-1 I I- FLEX CONNECTOR
<br /> L : VSTYP,�LOPE
<br /> e.,Y.rn_
<br /> rF >mCrr:AL wT�LxrsPa�r6,.0
<br /> TYPICAL VAPOR HIST
<br /> ALLKTICIel(AUTd A Nd /DIE96L) � � _ _ __ � -
<br /> _
<br /> scA e I 1 t. SCALE: c.i.s.
<br /> iCP r . .c'+1",Y I,hk',MMS'!'kU+wrT. I . ,(+,.5v..a.s.. .:^yr4,.!?A:::at.M-yaR4,u e: ....,.t:.a.Vb�l'Nuns; .:V.t.ttC.Y,r...tNAflP3�lV9dANYn.@;.Oe,.,fiwYh',,�,ux[1�z39!YfA�t'rYtl➢8#+ix9bTY.4tF.x:bk'.'I�PtAdECIRRaGM'A7.Y.k19+, !FX14P:t/d:A7A'i'JY4N:i+rS!M11dt 'aAb9�A'�sF'Mi`+mM ii: ,??ttliR:!Vt,52'F'k:RP:aG�4'.aRFdIM'.94R5!!FIp .N ,:4:¢nar':v�tt9Etifl[C1T°L',1P�'I6fiShM4.
<br />
|