CANOPY IX)NNSPOUT IN
<br /> COLUMN BY STEEL FABRICATOR ti
<br /> VENEER
<br /> - COLUMN H14ERE WRAP OROCCURS MASONRY
<br /> ISOLATION JOINT AROUND
<br /> GENERAL N01 ES
<br /> COLUMN. FIBER EXPANSION JOINT
<br /> I. INTERRUPT - MUST COMFORM TO ASTM
<br /> REINFORCING
<br /> - I' CROWN MAX. FROM DRIVE t12V; D 1751
<br /> 1. FOR EXISTING SITES WHERE POSSIBLE CONTAMINATED MATERIALS EXIST, A. PETROLEUM PIPING TEST PR(XIEDURE,THE 12. PIPING SYSTEMS SMALL 13E TESTED AS FOLLOWS, SLAB TO DISPENSER BASE
<br /> CONTRACTOR'S EMPLOYEES SMALL HAVE COMPLETED 40 HOURS OSHA TRAINING AT JOINT
<br /> TOOL TO 1/4' RADIUS
<br /> COURSE PRIOR TO TME START OF WORK. (CERTIFICATE REWIRED) EXPANSION JOINT
<br /> CONTRACTOR SMALL FURNISH COPIES OF ALL APPROPRIATE CERTIFICATES TO I. CONTRACTOR SHALL NOTIFY LOCAL INSPECTORS AND COMPANY REPRESENTATIVES PRIOR
<br /> THE OWNER. TO ANY TESTING WITH AT LEAST A 24 HOUR NOTICE. DRIVE SLAB
<br /> 2. carhUmo EMPLOYEES WALL HAVE COMPLETED 'APPROPRIATEt 11
<br /> 2. CONFIRM TESTING PROCEDURE V41(TIT LOCAL AG _WAI_S PRICIR 1._a I rING.
<br /> MANUFACTURERS PIPES TRAINING, (CERTIFICATE REQUIRED). CONTRACTOR • 4.
<br /> SMALL COMPLETE THE 'PIPING SYSTEMS INSTALLATION CHECKLIST FOR III= III `3. PRIMARY TESTING, ANC14OR BOLTS PER STEEL
<br /> UNDERGROUND PETROLEUM PIPES' AND SMALL FURNISH TWE OWNER WITH
<br /> COPIES OF ALL APPROPRIATE CERTIFICATES. FABRICATOR DRAWINGS,
<br /> 4
<br /> (1) UPON COMPLETION OF PRIMARY PIPINGAND BEFORE GLUING. SECONDARYit II a
<br /> 3. CONTRACTOR SMALL HAVE SEEN TRAINED BY 'TANK MANUFACTURER TO NAS TO BE INSTALLED PRIOR TO GLUING OF PRIMARY. TEST 19 TO BE PVTO OR SCHFI). 40 GALV.
<br /> TANK INSTALLATION' CONTRACTOR WALL COMPLETE THE 'TANK INSTALLATION CONDUCTED AT THREE TIMES THE WORKING PRESSURE OF THE SYSTEM ROOF LEADER. CONNECT
<br /> CHECKLIST' NOT TO EXCEED 60 PSI.
<br /> ECKLISTO (SUPPLIED TO CONTRACTOR By MANUFACTURER DURING TANK -1 L TO STORM DRAIN PIPING
<br /> DELIVERY) AND WALL FURNISH A COPY OF THIS DOCUMENT TO THE OWNER,
<br /> (a) BEFORE APPLYING PRESSURE, VERIFY THE FOLLOWING HAVE BEEN COMPLETED, COLUMN FOOTING. SEE STEEL
<br /> 4, CONTRACTOR SHALL DEVELOP A SPECIFIC SITE SAFETY PLAN FOR TANK INSTALL- IFVERIFY SWEAR VALVES ARE CLOSED. FABRICATOR DRAWINGS.
<br /> ATION PRIOR TOT149 START OF WORK. CONTRACTOR SMALL CONDUCT WEEKLY
<br /> JOB SITE SAFETY MEETINGS WITH IT'S EMPLOYEES. VERIFY TWE BALL VALVE CLOSEST TO THE TURBINE IS CLOSED.
<br /> THERE MUST BE TWO (2) GAUGES (0-100 PSI) PER PRODUCT
<br /> S. CONTRACTCP WALL WAVE THE FOLLOWING LICENSES AT A MINIMUM, BEING TESTED, NiTWOUT ISLAND D.5.
<br /> BELOW GRADE
<br /> A. GENERAL ENGINEERING 'A' J -------
<br /> B. HAZARDOUS MATERIAL SUBSTANCE HANDLING (b) Fmck;9DURES TO FOLLOW WHEN APPLYING PRESSURE- 0, SCALP: N.T.S.
<br /> 6. CONTRACTOR WALL HAVE AND HAINTIAN THE FOLLOWING INSURANCE,
<br /> ANY TIME INITIAL PRESSURIZATION IS BEING APPLIED.
<br /> A. CONTRACTOR SMALL SUBMIT PROOF OF ALL REQUIRED INSURANCE TO s APPLY PRESSURE IN 16-20 PSI INTERVALS UNTIL REACHING A MAXIMUM V-6 3/4' V-0.ja
<br /> THE OWNER AND SHALL "ME THE OWNER AS 'ALSO INSURED.' OF 60 PSI. 4'-0' is
<br /> o rIARK CRITICAL PRESURES ON GAUGES WITH ELECTRICAL TAPE AT THE IIS
<br /> B. COMPREHENSIVE GENERAL LIABILITY, INCLUDING CONTRACTOR'S BEGINNING OF EACH TEST.
<br /> PROTECTIVE LIABILITY, COMPLETED OPERATIONS LIABILITY, AND
<br /> CONTRACTUAL LIABILITY, WITH A COMBINED SINGLE LIMIT OF NOT LESS SOAP TEST PIPING WITH (1) CUP D1014 WAP TO (2) GALLONS OF WATER, COLUMN WRAP TANK OR YARD SLAB
<br /> THAN $1,0002000 PER OCCURRENCE FOR BODILY INJURY AND SPRAY FITTINGS AND OBSERVE WITH A MIRROR TO SEE UNDERSIDE AND
<br /> PROPERTY &MAde. ALL AROUND FITTINGS. OBSERVE FOR BUBBLES AS EVIDENCE OF A LEAK. - SLOPE VARIES, V MAX.,
<br /> AFTER PROVING SYSTEM TIGHTNESS, APPLY 60 PSI PRESSURE HOLD FOR SEE CIVIL 2' AC COMPACTED 1 1/2' NEW AC
<br /> C. EMPLOYEES LIA61LITY WITH A MINIMUM LIMIT OF LIABILITY OF $1,000,000 ONE MINUTE, THEN RELEASE PRESSURE. REPEAT PRESSURIZATION+ION CYCLE
<br /> FOR EACH OCCURRENCE. A MINIMUM OF (6) TIMES. 6' S.O. BOLLARD, TTP. 21-0
<br /> FIIE
<br /> D. AUTOMOBILE LIABILITY COVERING USE OF ALL OWNED WIRED VEHICLES I UPON COMPLETION OF THE ABOVE TESTS KEEP PRESSURE AT 60 PSI FOR
<br /> WITH A COMBINED SINGLE LIMIT OF SINGLE UNIT OF LIABILITY OF NOT A MINIMUM OF (3) HOURS. OBSERVE I*RkgiURf GAUGES FOR ANY LOSS.
<br /> UT EDGE
<br /> PROP
<br /> THAN $1,M000,AGEWO PER OCCURRENCE FOR BODILY INJURY AND s sysrrm sHom.n Br KEPT AT 20 PSI 1:0H OUHArIoN ot
<br /> PROPERTY DA .
<br /> CONSTRUCTION AND SHALL 1H CHI
<br /> GENERAL CdNtkACTOA WALL FURNISH ALL LABOR, MATERIAL, EQUIPMENT,
<br /> 4. SECONDARY TESTING,
<br /> AND SERVICES NECESSARY FOR OR REASONABLY INCIDENTAL TO THE
<br /> SATISFACTORY COMPLETION OF ALL WORK SWO14N ON, CALLED FOR, 09 (1) UPON COMPLETION OF SECONDARY PIPING AND BEFORE PLACEMENT OF ANY
<br /> REQUIRED BY THE DRAWINGS, BACKFILL, TEST SECONDARY PIPING AS OUTLINED BELOW. TEST AT 6 PSI AND AT BOLLARD SEE COMPACTED BASE
<br /> DETAIL i6l�
<br /> s. NO TIME EXCEED 10 PSI. BEFORE APPLYING PRESSURE, VERIFY THE FOLLOWING L-1
<br /> 13. ALL WORK SMALL BE PERFORMED IN ACCORDANCE WITH THE UNIFORM BUILDING HAVE BEEN COMPLETED. 1 'l
<br /> C009k UNIFORM FIRE CODE, RATIONAL ELECTRICAL CODE CALIFORNIA UNDER- CANOPY COLUNM
<br /> (,) I VERIFY ALL SECONDARY C04TAINMENT SOOTS ARE IN THE CL05ED POSI-
<br /> GROU D STORAGE TANK REGULATIONS, OSHA CONSTRUCTION SAFETY ORDERS, TION AND THAT ALL CLAMPS ARE SECURE AND TIGHT. EXISTINGAC
<br /> AND ANY OTHER APPLICABLE FEDERAL, STATE, CITY, OR COUNTY ORDINANCES, 3'-1 314' 4'-4' LEVEL
<br /> IF THERE MUST BE TWO (2 GAUGES (0-16 PSI) PER PRODUCT L e e
<br /> BEING TESTED.
<br /> PERMITS (b) SOAP TESTING.
<br /> IF SOAP TEST SECONDARY PIPING USING THE SAME PROCEDURES AS
<br /> 1. GENERAL CONTRACTOR SMALL PROTECT ALL EXISTING FACILITIES THAT ARE To OUTLINED ABOVE FOR THE PRIMARY PIPING OBSERVING FOR BUBBLES
<br /> REMAIN UNLESS NOTED OTHERWISE. CONTRACTOR SMALL REPAIR OR INDICATING LEAKAGE. DO NOT EXCEED PRESSURES INDICATED ABOVE. S _2.' SPtvALY GONCRE"VE TRANS.
<br /> REPLACE, TO THE SATISFACTION OF THE OWNER'S REPRESENTATIVE, ANY SCAT I�,Im V 0- SCALE: I"
<br /> s 4YSrEM SHOULD DVKPPT AT 1 FIST PTUNING C0MIlLr� ljoM
<br /> EXISTING FACILITIES THAT ARE DAMAGED BY THE CONTRACTOR'S OPERATIONS. OF SITE WORK, PAVING, CURDS, ETC
<br /> 2. ALL EXCAVATIONS SMALL BE PERFORMED IN COMPLIANCE WITH OSHA AND
<br /> STATE REGLILATI"� 114E CONTRACTOR IS REFERRED TO THE OSHA BOOKLE-,, S. VENTS, VAPOR, AND TANK RISER TESTING,
<br /> 'r=AVA-nNG AND TRENCHING OPERATIONS, FOR SAFE WORK PRACTICES
<br /> GUIDE, FOR PERFORMING ExcAvATicm WORK.
<br /> (1) UPON COMPLETION OF VAPOR RECOVERY PIPING, TEST SYSTEM AS FOLLOWS, ALL TANK AND LINE INSTALLATIONS WALL BE PERFORMED
<br /> 3. UPON COMPLETION OF THE PROJECT, TME CONTRACTOR SHALL PROVIDE THE
<br /> OWNER WITH 'AS BUILT' DRAWINGS OF ALL ITERS INSTALLED BY THE (a) BEFORE APPLYING PRESSURE, VERIFY T14E FOLLOWING WAVE BEEN COMPLETED, BY LICENSED C61-D40 C-36 GENERAL A OR GENERAL 8
<br /> CONTRACTOR. 'AS BUILTV SMALL BE COMPLETED ON-SITE. r VERIFY ALL FILL AND VAPOR CAPS HAVE BEEN SAFETY WIRED OR BOLTED WITH HAZARDOUS MAfERIAE6 CERTIFICATE CONTRACTOR #4 R03AR AT 24' O.C.
<br /> THESE PLANS ARE DIACgRAMATIC IN NATURE AND ARE NOTII
<br /> TO ENSURE THEY ARE NOT ACCIDENTLY REMOVED DURING TESTING. INTENDED TO BE EXACT REPRESENTATION OF THE FINAL EACH WAY (TYPICAL)
<br /> 4. CONTRACTOR WALL PROVIDE A WORK SCHEDULE TO THE OWNER BEFORE THERE SMALL BE TWO (2) GAUGES (0-16 PSI) IN PLACE WITH A 5 PSI PRODUCT. THESE PLANS SMALL BE USED BY THE
<br /> COMMENCING ANY CONSTRUCTION WORK.
<br /> RELIEF VALVE TO PREVENT OVER PRESURIZATION OF TANKS. CONTRACTOR AS AID ONLY, CONTRACTOR WALL BE
<br /> S. coNrrpAcro-vsgALL'Cbc_RviNATE ALL INSPECTIONS AND APPROVALS AND I VERIFY ALL CAPS AND PLUGS 14AVE BEEN TIGHTENED BEFORE TEST. PIPES AND ALL EQUIPMENT ARESPONSIBLE FOR THE COMPLETESSOINSTALLATION OF TANKS,CIATED WITH SCOPE
<br /> SMALL OBTAIN, AT TME COMPLETION OF THE PROJECT, ALL CERTIFICATES (b) SOAP TESTING, oFW6RK.
<br /> REQUIRED TO OPERATE THE FACILITY.
<br /> IF SOAP TEST VAPOR RECOVERY III VENT PIPING USING THE SAME PROCEDURES
<br /> AS OUTLINED ABOVE FOR THE PRIMARY PIPING OBSERVING FOR BUBBLES
<br /> INDICATING LEAKAGE, CHECK ALL TANK RISERS, TURBINES, AND MANWAY is
<br /> SCOPE OF WORK FOR SIGNS OF LEAKS. II
<br /> ____ - - s REMOVE PRESSURE AFTER OBSERVING FOR ONE HOUR.
<br /> I. FENCE OFF WORK AREA WITH 6' HIGH CHAIN LINK FENCE. AT THE END OF NaE!
<br /> EACH WORK DAY SECURE FENCING PANELS TOGETHER. 1 00 NOT LEAVE TANKS UNDER PRESSURE FOR MORE 59E SITE PLAN FOR SPECIFIC APPLICATION zl
<br /> THAN 1 112 HOURS. aI
<br /> 2. WHEN EXISTING SITE IS BEING DEMOLISHED, FLUSH CUT AND REMOVE
<br /> jl PRODUCT LINES FROM TANKS TO DISPENSER IR.U141Y; 14 ACCORDANCE 6, DUE TO WEATHER CONDITIONS, PRESSURES MAY RISE OR FALL OVER A
<br /> WITH REGULATIONS,
<br /> PERIOD OF TIME. PRESSURES SHALL BE MONITORED AT REGULAR INTERVALS
<br /> TO PREVENT FALSE READINGS.
<br /> 3. NOT USED
<br /> T. VENT AND VAPOR RECOVERY PIPING WITH PHASE 11 RECOVERY. is INSTALL MONITORING 5191 tri m I k 2.Vtd JaNtKAv N tA(;H TANK ANNULAR 5rA,;f
<br /> 4. INSTALL SHORING IN TANK MOLE AS REWIRED (IF REWIRED, AT EXTRA COST). (I) CONTRACTOR 19 RESPONSIBLE FOR VENT AND VAPOR RECOVERY PIPING SYSTEM AND IN TURBINE SUMPS. INSTALL MONITOR CONTROL PANEL IN EXISTING BUILDING
<br /> AS DIRECTED BY OWNER. INSTALL LIQUID LEVEL PROBES IN TANKS.
<br /> S. EXCAVATE AS NECESSARY FOR THE INSTALLATION OF NEW TANKS. PASSING ANY LOCALLY IMPOSED TEST REQUIREMENTS. q
<br /> 6. THE OWNER SMAPROVIDE FOR TRANSPORTATION AND DISPOSAL OF EXCAVATED 6. UPON COMPLETION OF THE FUELING SYSTEM, THE FOLLOWING ITEMS ARE REQUIRED- SEE SITE ELECTRICAL PLAN FOR TANK CONDUIT CONFIGURATION.
<br /> LL SCALE:- , J
<br /> SOIL AFTER COMPLETION OF ANY NECESSARY REMEDIATION, INCLUDING AERATION. (1) ST-21 TEST. 16. INSTALL NEW CONCRETE TANK MAT AND OTHER CONCRETE AS INDICATED ON SITE
<br /> PLAN. CONCRETE TO BE INSTALLED ACCORDING TO TYPICAL CONCRETE
<br /> 1, INSTALL FILTER FABRIC LINER IN TANK 14OLE PER DRAWINGS. (2) ST-30 TEST, SPECIFICATIONS. DRIVE SLAB SMALL BE 6' THICK. TANK SLAB SMALL BE 6' THICK.
<br /> 6. INSTALL TANKS AS SM" ON SMELT TLA AND PER MANUFACTURER'S (a) A w& L TEST (IF REQUIRED). SEE SITE PLAN AND DETAIL SWEET.
<br /> INSTRUCTIONS. TANK BEDDING AND BACKFILL SHALL MEET TANK MANUFACTURES. (4) PLACED IN SERVICE REPORT. 17. INSTALL DISPENSERS AND CONSOLES AS INDICATED ON SITE PLAN AND
<br /> GUILD LINES. TANK SURY DEPTH SHALL Be CALCULATED BY THE GENERAL (5) METER CALIBRATION CONFIRMED AND ADJUSTED. (RESULTS MUST BE SENT TO DESCRIBED IN THE EQUIPMENT LIST.
<br /> CONTRACTOR TO PROVIDE A MIN. 110' (114- PREFERRED) PER FOOT SLOPE ON WEIGHTS 4 MEASURI& WITHIN 24 HOURS OF COMPLETION)
<br /> ALL PIPING TO TANKS. is. PATCH PAVING (MIN. REQUIREMENTS IF 140 SOILS REPORT), #4 REBAR AT 24' O.C.
<br /> EACH WAY (TYPICAL)
<br /> (6) ALL METERS SEALED.
<br /> 4. INSTALL EQUIPMENT AB LISTED IN EQUIPMENT LIST. A. ALL AREAS To BE PATCHED MUST BE SQUARE CUT WITH PAVEMENT
<br /> (1) TANK AND LINE TEST (3rd PARTY). BREAKER OR CONCRETE SAW.
<br /> 10. INSTALL NEW PETROLEUM PRODUCT, VENT i VAPOR LINES PER SITE PLAN, (8) FUEL SYSTEM CHECK TEST. B. EXCAVATE ALL AREAS TO A DEPTH OF 6' AND REPLACE WITH 20 AC
<br /> STANDARD TANK DRAWINGS, AND PER PIPING GENERAL NOTES ON SWEET TL-3. OVER 4' CRUSH ROCK OR CONCRETE BASEEX .
<br /> (q) AS BUILT DRAWINGS.
<br /> A. STEEL PIPING, ALL PIPING OtWER THAN FIBERGLASS SMALL C. PATCH PAVEMENT FOR DISTANCE OF 21 AROUND ALL NEW CONCRETE UNLESS
<br /> BE BLACK IRON (GALVANIZED PIPE IS NOT (IO) MONITORING SYSTEM FINAL WITH APPROPRIATE AGENCY APPROVALS. PETROMAT OVERLAY IS CALLED FOR.
<br /> ALLOWED). ALL STEEL PIPE BELOW GRADE It
<br /> I THE ABOVE MENTIONED LIST 19 FOR REFERENCE ONLY. CITY COUNTY OR OTHER NOTE, ANY ENVIRONMENTAL WORK REQUIRED OUTSIDE OF TME ABOVE
<br /> SMALL BE CATWODICALLY PROTECTED PER GOVERNING AGENCIES, MAY HAVE OTHER REQUIREMENTS TWAT MUST & ADHERED TO. SCOPE OF WORK SHALL BE ONE ON A
<br /> REGULATIONS. IT IS THE CONTRACTORS RESPONSIBILITY TO CONFIRM AND MEET ALL REQUIREMENTS. TIME AND MATERIALS BASIS. RENTAL RECEIPTS,
<br /> bknL, PERSONS INSTALLING PIPING MUST BE CERTIFIED As WAVING BEEN SUBCONTRACTOR INVOICES, MATERIAL RECEIPTS,
<br /> TRAINED BY 114E PIPING MANUFACTURER. AND DAILY LABOR TIME SHEETS SMALL BE REQUIRED
<br /> it
<br /> 13. ALL BLACK IRON PIPING TO BE PAINTED GREY. TO SUPPORT GENERAL CONTRACTOR TIME AND
<br /> 0. INSTALL NEW VENT RISERS AS SHOWN ON SITE PLAN. INSTALL MATERIAL INVOICES. SUCH WORK SMALL BE BILLED
<br /> FLEX CONNECTORS AT BOTTOM OF VENT RISERS. PROTECT ALL 14, ALL CONDUIT SMALL BE 3/41(MIN). MIN. BURIAL AT 24- SEPARATELY OR AS AGREED BY OWNER 4 CONTIRCACTOR.
<br /> METAL PIPING SURFACES FROM BACKFILL MATERIAL. NorEt
<br /> SEE SITE PLAN FOR SPECIFIC APPLICATION
<br /> GENERAL NOTES AND SCOPE OF WORK 'ANK SLAO fjIETAJL
<br /> SCALE; N.T.S. 4
<br /> SCALE:
<br />
|