My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO PRE 2016
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WASHINGTON
>
1214
>
2300 - Underground Storage Tank Program
>
PR0502602
>
COMPLIANCE INFO PRE 2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/2/2025 1:02:11 PM
Creation date
11/7/2018 8:25:55 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2016
RECORD_ID
PR0502602
PE
2381
FACILITY_ID
FA0005508
FACILITY_NAME
ARCADIS
STREET_NUMBER
1214
Direction
W
STREET_NAME
WASHINGTON
STREET_TYPE
ST
City
STOCKTON
Zip
95203
CURRENT_STATUS
02
SITE_LOCATION
1214 W WASHINGTON ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\W\WASHINGTON\1214\PR0502602\COMPLIANCE INFO PRE 2016.PDF
QuestysFileName
COMPLIANCE INFO PRE 2016
QuestysRecordDate
3/9/2017 4:40:39 PM
QuestysRecordID
3350468
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
66
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STATUS REPORTS <br /> Status Reports for active tasks are summarized below: <br /> WORKPLAN <br /> The workplan was revised April 1988 . The revised workplan <br /> presents a revised schedule for completing the approved <br /> July 1987 Workplan tasks . Response to the State ' s Janu- <br /> ary 29 , 1988 comments were incorporated into the revised <br /> workplan in addition to updating workplan tasks to reflect <br /> the status of completed work. <br /> TASK 2--OFFSITE WELLS <br /> 1 . Progress Made This Quarter <br /> Locations for six new offsite monitoring wells were <br /> selected. The locations are based on interpretation of <br /> water levels and water quality data from the existing <br /> on and offsite wells , including the six new offsite <br /> wells installed November 1987 . These data indicate <br /> that the offsite plume is narrower than previously <br /> thought. The shape and extent of the plume appears to <br /> be controlled by a trough in the potentiometric <br /> surface. The proposed new well locations have been <br /> selected to address the maximum extent of contamination, <br /> within the trough, downgradient of the site. <br /> 2 . Problems Identified <br /> The proposed new well locations have not been approved <br /> by the State. Additional information has been <br /> requested, and will be provided at a meeting between <br /> M&B and the State. <br /> Gold Bond denied M&B access to install the proposed <br /> wells. The RWQCB will be contacting Gold Bond to <br /> assist M&B in obtaining access to this property. <br /> Assuming permission can be obtained by mid-September, <br /> there should not be a delay in the schedule. <br /> 3 . Activities Next Quarter <br /> A meeting between the State and M&B has been scheduled <br /> for Thursday, September 1 , to resolve questions regard- <br /> ing offsite well locations, groundwater monitoring, and <br /> other workplan activities . <br /> Mobilization will begin in late September to install <br /> the proposed new offsite wells. <br />
The URL can be used to link to this page
Your browser does not support the video tag.