My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO PRE 2016
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WASHINGTON
>
1214
>
2300 - Underground Storage Tank Program
>
PR0502602
>
COMPLIANCE INFO PRE 2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/2/2025 1:02:11 PM
Creation date
11/7/2018 8:25:55 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
PRE 2016
RECORD_ID
PR0502602
PE
2381
FACILITY_ID
FA0005508
FACILITY_NAME
ARCADIS
STREET_NUMBER
1214
Direction
W
STREET_NAME
WASHINGTON
STREET_TYPE
ST
City
STOCKTON
Zip
95203
CURRENT_STATUS
02
SITE_LOCATION
1214 W WASHINGTON ST
P_LOCATION
01
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\W\WASHINGTON\1214\PR0502602\COMPLIANCE INFO PRE 2016.PDF
QuestysFileName
COMPLIANCE INFO PRE 2016
QuestysRecordDate
3/9/2017 4:40:39 PM
QuestysRecordID
3350468
QuestysRecordType
12
QuestysStateID
1
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
66
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3 . Activities Next Quarter <br /> Groundwater levels will be measured in all wells . Sam- <br /> ples will be collected and analyzed according to the <br /> revised workplan. The attached table lists the wells <br /> to be sampled. Extraction Well A-9 may be replaced by <br /> converting DSW-6B to an extraction well. Assuming this <br /> is feasible, work may begin this quarter, using the <br /> resources saved by reducing the groundwater monitoring <br /> program. <br /> TASK 4--AQUIFER TESTING <br /> 1 . Progress made this quarter <br /> Analysis of the data from the pumping tests was com- <br /> pleted. Lateral hydraulic conductivity ranged from 14 <br /> to 49 feet per day (ft/d) , and the ratio of lateral to <br /> vertical hydraulic conductivity was determined to be <br /> approximately 3 :1 . <br /> A technical memorandum describing the pump test proce- <br /> dure , results , and data analysis has been prepared and <br /> submitted separately in August 1988 . <br /> 2 . Problems Identified <br /> None. <br /> 3 . Activities Next Quarter <br /> None . <br /> 4 . Schedule for Completion <br /> The scope of work defined in the workplan has been com- <br /> pleted. <br /> TASK 10--TANK INTEGRITY ASSESSMENT <br /> 1 . Progress Made this Quarter <br /> Agreement was reached on how to decommission the re- <br /> maining underground tank at the site. The empty <br /> creosote/oil unloading tank, no longer in use , is <br /> located in the plant site central process area. Soils <br /> in the process area are considered contaminated from <br /> the surface down to the groundwater. The shallow <br /> groundwater under the process area, including the <br /> creosote/oil tank, is contaminated from past practices. <br /> Well A-8 , located in the shallow groundwater near the <br /> tank, is being pumped to remediate groundwater con- <br /> tamination in the process area . Since the tank is <br />
The URL can be used to link to this page
Your browser does not support the video tag.