My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
REMOVAL_1993
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WATERLOO
>
2358
>
2300 - Underground Storage Tank Program
>
PR0231756
>
REMOVAL_1993
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/31/2019 5:01:51 PM
Creation date
11/7/2018 9:00:31 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
REMOVAL
FileName_PostFix
1993
RECORD_ID
PR0231756
PE
2361
FACILITY_ID
FA0006343
FACILITY_NAME
ALPHA FAST GAS*
STREET_NUMBER
2358
Direction
E
STREET_NAME
WATERLOO
STREET_TYPE
RD
City
STOCKTON
Zip
95205
APN
14118221
CURRENT_STATUS
01
SITE_LOCATION
2358 E WATERLOO RD
P_LOCATION
99
P_DISTRICT
001
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\W\WATERLOO\2358\PR0231756\REMOVAL 1993.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
51
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
WFiLIUrvtrvYin�.�riinu ' <br /> M,-Ir- 15 '93 03: 19PM ULRR INC. � P.9/16 <br /> SAMPLIING PROTOCOL FOR ROUTINE TANK RWAOVALS <br /> flf <br /> The following rcpreasnts minimum sampling criterion required for closure compliance Soil samples collected ahtU be ?� <br /> representative of native sails beneath the tank's invert (tank's bottom) at a collection depth not to exceod 2 - 4 fact, If <br /> eantaminatioa is documented during closure, an Unauthorized Release Notification must be completed and submitted �t <br /> within five (5) working days pursuant to California Health A Safety Code, Section 25295. r <br /> WATER=1 PRESENT IN THE TANK PIT <br /> TANK TANK SIZE MDingUM NUMBER LOCATION OF SOIL SAMPLES <br /> # (Oallont) of SOIL SAMPLES <br /> t 1,000 1 per Task Fill OR Pump End of Tank tl <br /> 1,000 - 10,000 2 per Tank i at each End of Tank <br /> n 10,000 3 or More Ends and Middle OR generally <br /> per Tank spaced along the length of the Tank <br /> PIPING AND STOCKPILE <br /> PIPIN SOIL SAMPLES I Sample every 20 lineal feet fl <br /> '1 <br /> TANK do PIPING STOCKPILE SAMPLES 2 Samples every 50 cubic yards <br /> WATER IS PRESEh7 IN TANK PIT <br /> TANK TANK SIZE MRQMUM NUMBER LOCATION of SOIL MINIMUM NUMBER of j <br /> # (Gallons) of SOIL SAMPLES SAMPLES WATER SAMPLES <br /> a 10,000 From wall neat to tank <br /> Single Tank 2 ends at toill groundwater I <br /> interface <br /> i 10,000 OR From wall am to tank { <br /> Tank Cluster 4 ends at soiV I <br /> groustdwater interfact <br /> SLAB PRESEA7 IN THE TANK PIT <br /> Soll samples shall be obtained beneath the slab within native soils. Penetration through the obstruction will be required in <br /> order to collect the samples. (Physical removal of the obsuustion will allow sampling according to the above eonditiona.) <br /> TANK TANK SIZE <br /> MINIMUM NUMBER LOCATION of SOIL SAMPLES <br /> M (Gallons) of SOIL SANTLES <br /> c 1000 3 t Tank Center and Enda OR Sides of Tank <br /> r <br /> 11000 - 10,000 5 per Tank Center and Ends OR Sides of Tank <br /> i 10,000 5 OR Mors per Tank Ends and Middle and generally spaced along <br /> the length of the Tank <br /> EH 23 047 (Revised 7/10/42) Page 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.