Laserfiche WebLink
SAVRCB, January 2002 <br />S. SECONDARY PIPE TESTING <br />• Page 1- of <br />Test Method Developed By: ❑ Piping Manufacturer C ndustry Standard ❑ Professional Engineer = <br />❑ Other (Specify) <br />Test Method Used:essCsuure - ❑ Vacuum ❑ Hydrostatic <br />Cl Other (Spec) <br />Test Equipment Used: ( Equipment Resolution11,1901 <br />r <br />En: <br />Piping m# j <br />Piping Run # Piping Run # <br />Material:Piping <br />71flipfingRunPiping <br />Manufacturer:Piping <br />Diameter: <br />Length of Piping Rim: <br />Product Stored: <br />r <br />Method and location of <br />i u -nm isolation: <br />' 5+ '.A `�.•. <br />Wait time behyeen applying pressure/N acuum/ii ater and <br />starting test: <br />— <br />— <br />Test Start Time: <br />f' <br />Initial Reading: <br />Q ' <br />Test End Time: <br />Final Reading (FF):?i <br />_ <br />_425-1— <br />rn 'Test <br />Test Duration: <br />i <br />1 10 r- <br />4, s <br />Change in Reading (RF -R4): <br />--=--- <br />— <br />Pass/Fall Threshold or <br />Criteria: <br />Test Result: <br />_ <br />❑ Pass nilP� <br />ll <br />ass Q Fail I passp <br />pass Fail <br />COMMIAS —(include information on repairs made prior to resting, and <br />3'rl <br />3 <br />1 <br />4 <br />r <br />t— <br />C, <br />