Laserfiche WebLink
0 <br />SWRCB, January 2002 <br />6_ PIPING SUMP TESTING <br />• Page 4 of <br />Test Method Developed BY: 0 Sump Manufacturer ndust y Standard 0 Professional Engineer <br />O Other (Spec) <br />Test Method Used: I .l Pressure C Vacuum Cdrastatic <br />O Other (bpecify) <br />Test F.gmpmeut Used Egwpment Resohtuon <br />Sump # <br />Sump # <br />Sump # <br />Sump # <br />-- <br />Swap Depth: <br />_ <br />F b� <br />— — <br />Sump Material: <br />_ <br />Height front Tattle Top to Top of <br />^ <br />Highest Piping Penetration: <br />10 <br />)' ( - <br />Height from Tank Top to Lowest <br />Electrical Penetration: <br />n , <br />) 3 :.. <br />„ <br />l3 - LN <br />Condition of sump prior to testing: <br />Portion of Sump Tesled' <br />Does turbine shut down when <br />sump sensor detects liquid (both <br />0 Yes ONO [INA <br />O Yes ONO DNA <br />O Yes GNb DNA <br />OYes ONO [INA <br />product and water)? <br />_ <br />Turbine shutdown response time <br />Is system prograttutted for fail-safe <br />Oyes ONO DNA'' <br />Oyes ❑No ❑NA <br />❑Yes ONO DNA <br />OYes ONO DNA <br />shutdown?` <br />Was fail-safe verified to be <br />p ar--t No0 NA <br />❑Yes ONO 11 NA <br />OYes ❑No DNA <br />❑Yes 0 N ❑NA <br />o rational'YI. <br />Wait tine between applcing <br />___ <br />pressure/vacuum/water and starting <br />test: <br />S <br />Test Start Time: <br />Initial Reading (RD: <br />S <br />Test End Time: <br />D <br />', o <br />Final Reading (Etk): <br />..__ <br />�c <br />Q,aD—`1 <br />'rest Duration: <br />Change in Reading (Rs -Rt): <br />Pass/Fall Threshold or Criteria: <br />Test Result: <br />Viass O Fail <br />bKPass O Fail <br />2 Pass O Fail <br />O Pass O Fail <br />Was sensor removed for testing? <br />Qhes LINO O NA <br />DNA <br />Yes ❑ No 0 NA <br />-DYes ONO LINA <br />Wassensorproperl}replaced and <br />13,/Yes ONO [INA <br />-Ct❑-'N-o- <br />1-1-1Yes ONO LINA <br />Wres ONO DNA <br />OYes ONO ❑NA <br />verified functional after testht '' <br />Comments - (include information on repairs made prior to testing, and reconnnended follow-up for failed tests) - <br />' if the entire depth of the sump is not tested, specify how much was tested. If the answer to 1my of the questions indicated with an <br />asterisk(*) is "NO" or "NA", the entire sump must be tested. (See S WRCB LG -160) <br />u <br />