My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 1999-2005
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WATERLOO
>
4407
>
2300 - Underground Storage Tank Program
>
PR0231761
>
COMPLIANCE INFO 1999-2005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/6/2020 4:40:04 PM
Creation date
11/7/2018 9:21:34 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1999-2005
RECORD_ID
PR0231761
PE
2361
FACILITY_ID
FA0002347
FACILITY_NAME
ERNIES GENERAL STORE
STREET_NUMBER
4407
Direction
E
STREET_NAME
WATERLOO
STREET_TYPE
RD
City
STOCKTON
Zip
95215
APN
08710059
CURRENT_STATUS
01
SITE_LOCATION
4407 E WATERLOO RD
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\W\WATERLOO\4407\PR0231761\COMPLIANCE INFO 1999-2005.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
165
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
q �16 /,o ( a <br />r <br />WRITTEN MONITORING PROCEDURES OGRAM <br />UNDERGROUND STORAGE TANK MONITORING <br />This monitoring program must be kept at the UST location at all times. The information on this monitoring <br />program are conditions of the operating permit The permit holder must notify San Joaquin County <br />Environmental Health Division, phone (209) 468-3420 within 30 days of any changes to the monitoring <br />procedures, unless required to obtain approval before making the change. <br />Required by Sections 2632(4) and 2641(h) CCR. <br />0 <br />Facility Name <br />Facility Address� (-o <br />e_D" (C9 --c k C _ c <br />9 S' Zj S— <br />A, Describe the frTeuency of performing the monitoring: A <br />Tank Goy. r•c� cw"'� t <br />Piping <br />.What methods and equipment, identified by name and model, will be used for <br />performing the monitoring: o c�e 1 �N, C - <br />Tank 67/ lbeir <br />Piping -o sE <br />C. Describe the location(s) where the monitoring will be performed (facility plot plan <br />should be attached): <br />D. List the name(s) and title(s) of the people responsible for performing the monitoring <br />and/or maintaining the� equipment: <br />E. Reporting format for onitonng: , <br />Tank <br />Piping <br />F. Describe the preventive maintenance schedule for the monitoring equipment. Note: <br />Maintenance must be in accordance with the manufacturers' maintenance schedule <br />but not less than every L? months: <br />I Oh - <br />G. Describe the training nec--ssary for the operation of UST system, including piping, <br />and the monitoring equipment: <br />- <br />
The URL can be used to link to this page
Your browser does not support the video tag.