My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO 1999-2005
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
W
>
WATERLOO
>
4407
>
2300 - Underground Storage Tank Program
>
PR0231761
>
COMPLIANCE INFO 1999-2005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/6/2020 4:40:04 PM
Creation date
11/7/2018 9:21:34 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1999-2005
RECORD_ID
PR0231761
PE
2361
FACILITY_ID
FA0002347
FACILITY_NAME
ERNIES GENERAL STORE
STREET_NUMBER
4407
Direction
E
STREET_NAME
WATERLOO
STREET_TYPE
RD
City
STOCKTON
Zip
95215
APN
08710059
CURRENT_STATUS
01
SITE_LOCATION
4407 E WATERLOO RD
P_LOCATION
99
P_DISTRICT
002
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\W\WATERLOO\4407\PR0231761\COMPLIANCE INFO 1999-2005.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
165
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
the February 18, 1999 inspection report. (Note: at time of the February 18, 1999 <br />inspection the north east dispensers had not arrived) <br />4. California Code of Regulations (CCR), Title 23, Division 3, Chapter 16, section 2630 <br />(d): Ernie's General Store has failed to meet the New UST monitoring system <br />requirements by not conducting a monitoring equipment routine maintenance, service <br />checks and monitoring equipment certification annually in 2000, or 2001. <br />5. California Code of Regulations (CCR), Title 23, Division 3, Chapter 16 section 2632 <br />(d)(1)(A-G): Ernie's General Store has failed to submit a written monitoring <br />procedure by the March 4, 1999 compliance date. <br />6. CCR section 2632(2)(A)(B): Ernie's General Store has failed to submit a written <br />response plan procedure by the March 4, 1999 compliance date. <br />7. EHD has not received the Underground Storage Tank Installation Certification of <br />Compliance Form C. <br />Ernie's General Store was given tank certification and blue tags so the station could receive a <br />fuel drop prior to conducting the precision test. The certificate and blue tags were issued <br />with the understanding the items stated in the February 18, 1999 inspection report would be <br />addressed by May 4, 1999. <br />Because Ernie's General Stores newly installed UST's have never been in monitoring <br />compliance, Briggs submitted new A &B state forms to update computer records showing <br />the site is `out of compliance' as of March 23, 20001 <br />To Achieve Permit Compliance the following items must be addressed: <br />Financial responsibility must be submitted to EHD. <br />2. The monitoring system must be tested and certified operational. This test will include <br />the northwest dispenser systems. <br />3. <br />4. A Written Monitoring Procedure addressing the requirements of CCR section 2632 <br />(d)(1)(A-G) must be submitted to EHD. <br />4. A Written Response Plan addressing the requirements of CCR section 2632 <br />(d)(2)(A&B) must be submitted to EHD. <br />5. Owner/Operator must contact contractor and complete the UST Installation <br />Certificate of Compliance. <br />6. The monitoring system must have its' monitoring system tested and certified <br />annually. Notify EHD of the date and time of testing. <br />
The URL can be used to link to this page
Your browser does not support the video tag.